INTRODUCTION
I. DESCRIPTION OF THE COLLIERY The Main Band Seam Firedamp Electrical Layout in No. 2 District
II. CONDITIONS LEADING UP TO THE EXPLOSION Inspection by Shotfirer Removal of No. 3 fan to a new position No tests made of electrical apparatus Discovery of and measures taken to disperse gas in Nos. 2 and 3 Headings
III. NARRATIVE OF THE EXPLOSION Rescue and Recovery Operations
IV. CAUSE OF THE EXPLOSION Shot-firing Electric Cap Lamps Flame Safety Lamps Cause of the Accumulation of Firedamp
V. OBSERVATIONS AND RECOMMENDATIONS Ventilation Maintenance Cables and Switchgear
APPENDIX I. List of Witnesses
APPENDIX II. Particulars of Persons killed and injured
APPENDIX III. Report by Mr. A. E. Crook, H.M. Mechanical Engineering Inspector of Mines, on examination of No. 3 Aerex Fan
PLAN No. 1 — Workings in Main Band No. 2 District Explosion Area PLAN No. 2 — Ventilation in Main Band No. 2 District PLAN No. 3 — Electrical Circuit in Main Band No. District