Logo Museum Entrance
Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archives
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Colliery Guardian
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
/   \

The Installation and Moving Over of a Face Belt Conveyor

Training Manual No. 1

Chapter IV

NOTES ON CARE OF BELTING

Important Points

1. All hooks of the fasteners should be properly bent over and all rivets should be properly hammered over so that they will not catch on the conveyor structure.

2. Belt corners should be trimmed at joints to prevent the ends of the belt catching on structure and tearing the belt.

3. Belt joints should be made so that both lengths of the belt are aligned correctly. If the ends of the joints are staggered the projecting ends will catch on the structure and tear.

4. The fasteners should be evenly spaced over the joint to distribute the tension equally over the whole width of the belt.

5. For the same reason the two lengths of belt to be joined should be of the same width.

6. Joint pins should be long enough to pass through all the fasteners to even out the tension over the whole width of the belt.

7. Joint pins should not be so long that they project from the joint edges or they will foul the sides of the conveyor and may cause the belt to slip or break.

8. Any damaged joint should be repaired immediately as it will always be a source of weakness and may break in the engine end or return drum where it is difficult to repair.

9. All bent or damaged side plates, stools or standards, bottom belt cover pans or rollers should be replaced so that the belt will not be subject to excessive wear.

10. Any torn belt edges should be trimmed to prevent the belt tearing further. The torn belt should be replaced by a new length at a convenient time during the shift.

11. Keep all rollers clean, so that they rotate freely and do not add to the friction.

12. Make sure the plough is working properly at the tension end and that the return drum is not clogged up with small coal.

13. The belt should be made to run centrally on the return drum and on the drive head. If it does not, it may tend to double over and split.

14. Spare lengths of belting with belt fasteners affixed should be kept in the gates at either end of the face to replace any damaged pieces of belting, so saving time in making new joints.

15. Excessive tension in a conveyor belt increases the power required to drive it round. It also increases the likelihood of cuts and breakages occurring in the belt, and of belt fasteners being pulled out.

16. It is very important that the two belt ends at the joint should be square. If they are not it may be difficult to insert the coupling pin and the belt at the joint will run out of line on the conveyor structure.

17. Where ordinary fasteners corrode owing to dampness at the face, it may be advisable to use a stainless steel type of fastener.

18. All the belting should be examined periodically and any badly worn or damaged portions be replaced to avoid belt breakages during the shift.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print