Logo Museum Entrance
Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archives
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Colliery Guardian
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
/   \

The Installation and Moving Over of a Face Belt Conveyor

Training Manual No. 1

Chapter V

THE CONVEYOR AND OTHER WORKERS

A   The Deputy

Make sure that all the work is carried out safely.

B   The Shotfirer

1. See that the alignment of the conveyor is not upset by shotfiring.

C   Cuttermen

1. Where anchor props have to be removed at the tension end, see that they are replaced in their original positions and that the belt is correctly tensioned as before.

2. Do not stay the cutting machine to any of the conveyor structure, or the alignment of the conveyor may be affected.

3. Replace correctly any of the intermediate structure that is accidentally forced out of position.

4. Where gummings have to be cast into the goaf do not pile them on top of the belt but throw them over the conveyor into the goaf.

D   Fitters

1. Do not load coal on to a stationary belt.

2. Do not place lumps of coal on the belt so large that they will foul the supports or the roof.

3. Keep the following parts of the conveyor as clean as possible by shovelling up all small coal

(a) Tension End.

(b) Sides of the conveyor.

(c) Engine End.

4. Where structure permits, shovel small coal from under the. top belt so that the belt runs on top of the rollers, not on the coal.

E   Prop Withdrawers

1. Do not pile the belt up with broken timber or bent steel bars, as they may become fast when the belt is run. Run off the damaged props and bars at the end of the shift after seeing that they are laid properly on the belt.

2. Do not set the anchor props for the sylvesters so that on withdrawal of a prop from the goaf, the sylvester chain will damage the structure or move it out of alignment.

F Belt Attendants

1. Examine the gearbox for overheating occasionally during the shift.

2. With electrically powered conveyors place the isolator switch of the gate end box in the "off" position and place a "DANGER" notice on the switch gear when a conveyor is stopped for repair.

NO PERSON SHOULD:-

1. Interfere with any machine by removing or discarding any bolts or nuts that may be used on the machine.

2. Remove any cover plate or fence.

3. Put stays between roof and top of motor or gear case.

4. Put packs under gearcase or motor.

5. Use the power to thread the belt.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print