Kilns Coke is delivered to the quarry by rail and unloaded by hand into a ground level hopper of 18 tons capacity. At the base of the hopper in an inclined tunnel, two discharge points deliver coke on to a conveyor belt 18 in. wide at 224 ft. centres inclined at 17 deg. This belt, powered by a 7½ h.p. motor through a Radicon gear reduction unit made by David Brown and Sons Limited, of Huddersfield, Yorks., delivers into a hopper of 15-20 tons capacity alongside the kiln stone hopper. Kiln stone can be run on to a 30 ft. horizontal belt which discharges at the conveyor belt which serves the kiln tower. Coke is passed directly on to this belt which is inclined at 18 deg. at 166 ft. centres and which is powered by a 15 h.p. motor. Stone is delivered into two 13 ton hoppers, one on each side of the 12 ton coke hopper. These materials are discharged, through hand-operated doors, into a 1 cu. yd. tipping truck which runs on a narrow gauge track. Coke and stone are tipped alternately from each side into the kiln at a ratio of one of coke to 7.7 of limestone. The system of feeding the kilns in current use was arrived at after studying the pattern of deposition in a scale model of one of the kilns. These kilns are referred to as the Devon kilns and were lit during 1954. Although at present only one kiln is operated owing to the prevailing state of the market, the weekly output is in the region of 164 tons a week. This comprises agricultural lime, and "cobbed" and hand-picked lime for other purposes. The installation of the Devon kilns led to the closure of the old Crown Quarry kiln in the early part of 1955. For this kiln the stone required transporting several hundred yards from the Devonshire Quarry plant, hand-loading from the rail wagons into 1 cu. yd. tipping wagons and hand-tramming 20-50 yd. to the kiln mouth. Burnt lime was extracted and loaded into railway wagons by hand. It was, therefore, somewhat costly to operate and its closure was inevitable with the opening of the Devon kilns. The lime from the Devon kilns is fed from each kiln by a quarry-made reciprocating feeder on to a 24 in. wide conveyor which is inclined at 18 deg. for one-third of its length of 128 ft. This belt delivers on to a second one inclined at 18 deg. and 146 ft. long which takes the lime to a 13 ft. 6 in. horizontal belt. From this the material is fed to either a single-deck Pegson screen or to a Flextooth crusher made by British Jeffrey-Diamond. This is powered by a 25 h.p. English Electric motor and gives a product of -1½ in. From the Pegson screen the oversize of +1 in. is passed directly into the "cobbed lime hopper." The undersize, -1½ in., is directed into the "kibbled lime hopper" along with the product of the Flextooth crusher. Facilities are provided to draw the lime off into either lorries or railway wagons. A Parker Cascade sand and stone washer made by Frederick Parker Limited, is sited adjacent to the plant. This machine incorporates a type FK feeder and is capable of handling material up to 1½ in. in size. Slimes from the washer are piped some 100 yd. to settling tanks which are emptied by means of pumps every two weeks. The washed material is loaded into lorries by a Merton Overloader. Dust from the cylindrical screen, the D7A screen and the roll crusher is removed by a Sirocco dust extraction unit made by Davidson and Co. Ltd., of Belfast, Ireland, and powered by a 30 h.p. motor. The dust collected by this unit is bagged. A similar unit is located in the drying building and this removes dust from the rotary drier. Here, however, the dust is delivered to a structure where it is sprayed with water and allowed to run off as slimes. During the past two years, a considerable amount of kiln stone has been stockpiled in the Devonshire Quarry. This is gradually being removed, however, by a 19-RB excavator which loads it into lorries for disposal. These can be discharged, if required, into railway wagons from a specially constructed platform. Much -3/16 in. material is also deposited close to the railway track and this is removed in a similar manner when required by a Smith (Rodley) excavator. An important use for these fines has been found in the feed to iron ore sinter plant. Vehicles are maintained in the Company's workshops situated in the Devonshire Quarry. A total of 11 vehicles are available for use at the quarry comprising Ford-Thames, Dodge and Bedford 4 x 2 tippers. They are used for the road transportation of aggregates, carrying material to and from the stockpiles and for the disposal of waste and overburden. The older lorries are as far as possible allocated to the more arduous internal tasks. For the transport of agricultural lime, two Fordson-Major tractors are used. These are used in conjunction with two-wheeled trailer lime spreaders, equipped with conveyor belt floors, to transport small quantities of lime for distances up to 50 miles. These lime spreaders may be recharged in the field if required, by lorries tipping from specially constructed ramps. For much larger quantities, however, a lime spreader mounted on a Bedford chassis is used. Ready-mix concrete plant Recently the Yorkshire Hennebique Contracting Company installed a ready-mix concrete plant adjacent to the quarry plant. Washed aggregates, together with sand, are supplied to the reception hopper by a Ruston-Bucyrus 19-RB machine. The hopper, a Stothert and Pitt 28 BP batcher, incorporates three 30 ton storage bins. Materials from this are fed by hand-operated control, into a I cu. yd. Parsons weighing hopper capable of weighing up to 4,400 lb. This can deliver a dry mix directly into the truck-mixers or into a 1 cu. yd. wet mixer made by Stothert and Pitt Limited of Bath. Cement is supplied by the Cement Marketing Company and arrives at the quarry in pressurised bulk cement carriers. It is discharged into a 30-ton capacity Blaw Knox silo from which it is taken by a Redler bucket elevator. The wet mixer rotates at 14.5 r.p.m. and is powered by a 15 h.p. Mawdsley motor. Mixed concrete is directed into waiting truck mixers below. Two truck mixers are at present in use. These are 3½ cu. yd. units made by Ransomes & Rapier Limited and are mounted on 7 ton, long wheelbase, Bedford chassis fitted with two-speed back axles. One unit is powered from a gearbox power take-off made by M. O. Harper Limited, of Guildford, Surrey, while the other mixer is rotated by a Ford industrial diesel engine. A third mixer, due to be put into service shortly, will be a 4½ cu. yd. model, driven from a hydraulic take-off. The plant is one of seven operated by this company and is capable, under continuous operation, of delivering approximately 25 cu. yd. (31 tons approximately) of wet mixed concrete per hour. Compressed air Compressed air to the plant and for secondary drilling purposes is supplied by Broom and Wade type BH 240 machines operating at 310 r.p.m. and 100 lb. per sq. in. Two of these two-cylinder machines are installed, each being powered by a 67½ h.p. English Electric induction motor running at 975 r.p.m. Only one of the units is normally operated at any particular time. At the time of installation they were intended to provide air for all face operations at the main face, which, at that time, was relatively close. With the introduction of the Halco-Stenuick drills a further compressor was installed in a new structure, together with a new sub-station for the excavating machinery. This compressor is a Broom and Wade type EH 241 machine which also operates at 310 r.p.m. and 100 lb. per sq. in., but is powered by a 75 h.p. Metrovick motor. Compressed air distribution is made to all parts of the quarry face through 4 in. mains from which branch off 2 in. diameter pipelines. Installed at the ends of these lines are small cylinders provided with several valve-controlled off-take points. These components, one of which was shown in Fig. 7, are made in the quarry workshops. Electrical The quarry operates its own sub-stations, power being derived at 11,000 V from the North Western Electricity Board. For use within the plant it is transformed to 400/440 V, and to 230/250 V for lighting. For the excavators working at the face a separate sub-station has been installed. Here the 11,000 V supply is transformed to 3,300 V for operating these machines. The plant is started in sequence, and any stoppage of machinery in the tertiary plant automatically brings the secondary crusher, the primary screens and the primary conveyor belt to a standstill. The primary crusher is stopped by the attendant. General The workshops at the quarry are well equipped and capable of undertaking repairs to most of the quarry plant. The blacksmith's shop is equipped with all necessary equipment including a Holman drill sharpener, a Ruston-Bucyrus bit dressing machine and oil and coke fired forges. Equipment in the fitting shops includes welding and oxy-acetylene cutting equipment, a metal sawing machine and a lathe. Conveyor belting has been supplied by B.T.R. Industries Limited, and is regularly serviced by the same company. Most belts at the quarry are fitted with tensioners. Conveniently situated alongside the sidings and the quarry access road is the weighbridge office. Installed here are two weighing units, manufactured by W. & T. Avery Limited, of Birmingham, one for rail use and the other for road vehicles. The first of these is a type 5201 DHB machine which has a capacity of 39 ton 19 cwt. weighed in 2 qr. divisions, while the latter is a type 5102 DHB unit handling up to 27 ton 19 cwt. by 1 qr. divisions. Good employer/employee relations are maintained. Accidents (and the resultant lost time) are rare and usually of a minor nature. For the use of the labour force a heated dining room and changing room is located at the plant. Manpower distribution is as follows: primary blasting, 2; secondary blasting, 6; excavators, 4; internal drivers, average 8; external drivers, average 6; crushing /screening, 5; loading, 2; kilns, 4; workshops, 8; quarry foremen, 1; quarry engineer, 1; and acting manager, 1. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||