Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
October, 1956

The Sandwith Anhydrite Mine — Part 1

A new sulphuric acid and cement plant has recently started production near Whitehaven, Cumberland. It is operated by Solway Chemicals Limited, who are mining the anhydrite required for the process through drifts collared within the factory area.

Marchon Products Limited operate an extensive chemical manufacturing plant a few miles south of Whitehaven, Cumberland, and this factory has in recent years consumed increasing quantities of sulphuric acid in its processes. In view of the geographical position of these works relative to the then existing H2SO4 sources, it became desirable to ensure a permanent local supply. Boreholes sunk in the immediate vicinity of the plant showed that satisfactory reserves of good-quality anhydrite were available and could be exploited from a point adjacent, to Marchon's factory. Resulting from this, the decision to erect an acid plant that would use the anhydrite process was taken, and construction started on this site in late 1952. For managing this new venture Solway Chemicals Limited was formed, which is a fully-owned subsidiary of Marchon Products Limited.

Other raw materials required for the process, which gives one ton of Portland cement in addition to every ton of sulphuric acid produced, are coke, iron oxide, aluminium oxide and silica. These last three ingredients are present in a local shale, which is quarried from the side of a hill near the mine buildings and it is necessary to import to the site only the coke. The plant, brought into production in the early summer of last year, is designed for a total annual output of 100,000 tons of both cement and acid, and space has been left to accommodate further plant should it become desirable to extend this productive capacity at some later date.

A brief outline of the process is of interest in assessing the importance of having the anhydrite mined on site. The three raw materials, anhydrite, shale and coke are crushed, dried, stored, blended and ground to a 95 per cent. -170 mesh "meal," which is fed to rotary kilns. There are at present two of these units at Solway, each being 230 ft. long and 11 ft. 2 in. in outside diameter and lined to withstand temperatures up to 1,600° C. at the firing end. The raw meal comprises approximately 80 per cent, anhydrite, 14 per cent, shale, and 6 per cent. coke, and in the kiln the CaSO4 is reduced initially to calcium sulphide and sulphate, and finally to CaO.

From the far end of the kiln (temperature 350° C.), a gas containing sulphur dioxide is taken off and, after purifying, cooling and filtering, converted to SO3 by passing over a vanadium pentoxide catalyst with an excess of air. This SO3 is absorbed in circulating sulphuric acid. The lime clinker is discharged from the kiln's front end, cooled and stored before crushing and grinding. Some 2 per cent. of gypsum is added and the product bagged for despatch. Most of the cement output is being used locally, for construction projects such as the large industrial atomic-energy plants nearby and the ancillary buildings that will be needed to accommodate the population.

Mine development

Two seams of anhydrite, averaging 90-92 per cent. CaSO4, were proved by the original boring programme and mining has started in the lower of these at a point 400 ft. below ground level, or 100 ft. below sea level. The workings strike almost due south-west and dip at an average of 1 in 12; it is estimated that 1,000 ft. of cover will exist when they pass beneath the coastline at St. Bees Head-providing the present dip and strike are maintained. Of the two seams, the upper is 15 ft. thick, the lower one ranging between 20 and 30 ft.; they are separated by some 8 ft. of shale. Unfortunately the dip of the seams is not regular, exhibiting a tendency to undulate and this was one of the factors that ruled out the practicability of employing rail haulage in the workings.

Access to the mine is obtained through two parallel drifts inclined downwards from their portals at a gradient of 1 in 7 for a distance of 3,000 ft. Of these the south drift carries the downcast ventilation, and is equipped for manriding, handling material and pumping. The north drift houses the belt-conveyor system by which the mine's anhydrite production is brought to surface and delivered to the treatment plant.

The two drifts have similar overall dimensions and are supported with 13 ft. wide by 9 ft. high arch girders, the legs of which are splayed to 14 ft. These arches were installed at 3 ft. 4 in. centres to maintain an average 3 ft. between them, the steel used being 4 in. by 4 in. in the early sections and, latterly, 5 in. by 4½ in. For the first 100 ft. where poor ground conditions prevailed, the area between the arches has been filled in by guniting and this practice has given a satisfactory, smooth finish which may be extended in the future for further sections of the drifts.

Work on these drifts was started in 1953 with mine crews, but difficult ground conditions in the upper marls were soon encountered for which they were not equipped and Mowlem (Scotland) Limited were called in to complete the driving. Their contract extended from January to December 1954 and for the past 18 months development in the anhydrite, equipping the mine and production has been proceeding.

At the time of commencing the contract only one haulage winch was available and the contractors considered it essential that, in order to obtain speed in drivage, the mucking disposal system of the two drifts should be independent. The winch for the man-haulage which was to be permanently installed to serve the south drift was on order but delivery was some way ahead and no suitable substitute could readily be obtained. The drifts were, therefore, mucked out by an Eimco 21 loading into wagons pulled up by the one winch available in the north drift and by an Eimco 40 in the south drift feeding by means of a travelling rail-mounted shuttle conveyor on to a temporary conveyor belt system, which was extended as work proceeded. In both cases the muck was disposed of into hoppers on the surface from whence it was transported to fill in low-lying portions of the site by dumpers, and was drilled and blasted in the normal way.

Where the ground was exceptionally soft it was found necessary to substitute tubbing for steel arch girders. Pre-cast concrete segments were used giving an internal diameter of 12 ft. and these were set so that the crowns of the segments were in line with the crowns of the steel arch girders, the invert being subsequently filled in to give an even grade. Stocks of segments were held on the site and by turning over to this form of construction as soon as soft patches were encountered the ground was held and no runs were experienced.

As the drift extended and the shale became harder the drifting teams were able to make good progress. The peak advance per week in any one drift including the erection of the steel arch girders and necessary timber lagging was 109 ft. and the best total advance on both drifts together in any one week was 203 ft. Advances of the order of 80-100 ft. per week were maintained once the teams had settled down..

The manriding set operating in the south drift for the transport of personnel to and from the workings is made up of two 12-seater Metrovick cars running on 2 ft. gauge track. It is hauled by in. diameter rope wound on the single drum of a double-drum haulage engine located on surface some 25 yards from the portal. This hauler is a 125 h.p. machine manufactured by Morley Engineering of Leeds, and is provided with a depth indicator and Thrustor speed control to ensure a running speed of 5 m.p.h. for the set in the drift.

The mine is producing at the present time approximately 7,000 tons of anhydrite per 5½-day week, working three 8-hour shifts daily and 17 production shifts per week. However, equipment is being installed on a scale that will, in the future, enable this production to be obtained from two shifts of the same duration per day. Part of this output is sold to a fertiliser manufacturer, and the remainder is used by the Solway sulphuric acid plant.

The labour force amounts to approximately 40 men per shift. Less than 50 per cent. of the labour has had previous mining experience, which was chiefly in the West Cumberland hematite mines. It has been found that previous experience in coal or iron ore is of little value in carrying out the mining methods adopted at Sandwith, and all recruits, except experienced hard-rock drillers, have to be trained.

The anhydrite development is located some 500 ft. above a seam of coal measures that has been mined in the past; it is now worked out and pillars have been left in the coal seam. No difficulty is foreseen from the presence of this old mine in conducting the present operations but particular attention will be paid to the possibility of methane emanations into the anhydrite workings. As detailed plans are available of these workings as well as the strata through which they passed, it has been possible to project the position of geological faults encountered in the coal up into the anhydrite seams. This advance knowledge of the probable behaviour of the anhydrite seams is, of course, of great value to the mine management in planning their future workings.

A pillar-and-stall method of mining is being used, the headings being cut 18-20 ft. wide and 12 ft. high. This back height was accepted as the maximum that could be attained conveniently with airleg-mounted percussive drills. Some of the overall seam thickness is, therefore, left unextracted and the back is not broken to a natural, smooth marl-anhydrite parting as exists at some other British anhydrite properties. However, it ensures that only that part of the seam containing the highest quality anhydrite is mined. In those areas of the mine adjacent to the access inclines, the headings are driven at 100 ft. centres. Outside this vicinity, a 75 ft. interval has been adopted, but when the mine is fully developed the drifts and crosscuts will be arranged at 50 ft. centres; this will permit a 60 per cent. extraction of the seam to its mined height.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print