May, 1954 Threlkeld Quarry — Part 1A description is given of working methods and new plant at this quarry, operated by the Keswick Granite Co. Ltd. For the production of roadstone, both dry and macadamised, for the Cumberland market.Situated in the heart of the English Lake District, some 3½ miles out of Keswick on both the road and railway line to Penrith, is the Knott Close, Threlkeld quarry, at the present time virtually the sole quarrying operation of the Keswick Granite Co. Ltd., and engaged primarily in supplying stone for local road construction and maintenance programmes and the building and contracting market. Records are available which indicate that this quarry was started in 1878 with an annual output of 278 tons. A steady increase in production was obtained in subsequent years, rising to a figure in excess of 29,000 tons in 1891 when the demand by the Manchester Corporation for aggregates for construction work on their Thirlmere Lake project (for supplying the city with a constant water supply) brought output up to 80,000 tons in 1894. There was also a large demand at this time for railway ballast on the London and North Western railway line between Crewe and Carlisle. Prior to 1892, Knott Close was worked and controlled by Mr. H. Harkewitz who then formed The Threlkeld Granite Co. Ltd. with Mr. J. Pattinson of Whitehaven and Mr. T. Glasson of Penrith as directors. In addition to the actual quarrying of granite, pre-cast concrete works were established and for many years coloured floor tiles were produced under a German patent, but upon the amalgamation with the Cumberland Granite Co. Ltd. of Embleton in 1936 the pre-cast concrete work was suspended. Threlkeld granite concrete flags are still to be seen in all the principal towns of Lancashire. The Threlkeld Granite Co. Ltd. and the Cumberland Granite Co. Ltd. amalgamated in 1936 under the title of the Keswick Granite Co. Ltd., and the new company decided to concentrate production solely at Knott Close; for the time being working at the Close quarry near Cockermouth and the Bram Crag quarry in the Vale of St. Johns has been suspended. For the present, however, six nien are kept employed at the Embleton quarry which is worked purely for the production of pitching or "penning"; the rock here is a granophyre. In 1949, the company installed new plant and equipment in order to mechanise and thereby increase production for supplying expanding markets, particularly in Cumberland, Westmorland and North Lancashire. The principal contractors and suppliers of machinery were Robert Broadbent & Sons Ltd., Phoenix Iron Works, Stalybridge, while the foundation work was undertaken by John Laing and Son Ltd., and steel work by Joseph Parks and Son Ltd., Northwich. One of the more obvious economies effected by bringing this plant into production was in the saving of labour, only 20 per cent. of the former quarry strength now being required for operating. Quarry face The rock being worked at Knott Close from a face approximately 900 ft. long by an average height of 160 ft., an impression of which may be obtained from Fig. 1, was styled in the past a syenite possibly due to its colour and texture; however, in 1941 the rock type at this site was definitely identified as a microgranite, with quartz porphyry appearing in sections of the face. A National Physical Laboratory test in 1934 described the sample supplied as quartz porphyry containing small porphyritic crystals of quartz, and others of decomposed alkali and albitic felspars, in a quartzo-felspathic sericitised matrix. A figure of 40,300 lb. per sq. in. was given as the crushing and cracking stress, while a Page Impact test of 23 was obtained. The specific gravity of the rock was quoted at 2.70. A recent analysis of the rock gave the constitutent parts as:—
The overburden overlying the area to be worked was stripped three years ago. This did not amount to a large task as some two-thirds of the quarry has virtually no topsoil covering. Any dirt entering the plant with the stone is eliminated at an early juncture as undersize (—1½ in.) from a vibrating dirt screen. Drilling and blasting This section may be divided basically into primary breaking from the face and secondary popholing of large chunks on the quarry floor, as these operations are kept entirely separate, different crews and equipment being allotted for each task. However, all blasting when required is performed at set times during the day at 9 a.m., 12 noon and 4 p.m. Explosives are housed in a brick building, authorised as a Division "C" store, and located well away from both face and plant. Primary breaking Taking first the work on the face, two crews each of two quarrymen (plus one man as spare) are responsible for the provision of broken rock at the quarry floor. These men operate from lifelines laid down the face and are equipped with safety helmets, goggles and masks. Drill-holes, of an average depth of 20 ft., are sited at any convenient place where full advantage may be taken of natural shear planes and slips in the rock structure to give a maximum tonnage per foot of hole drilled. Naturally, these holes are collared as near the base of the face as is convenient while the siting of the hole is left to the discretion of the driller. Ingersoll Rand J.49 and J.50 Jackhammers, weighing 57 and 58½ lb. respectively, are employed here, together with Climax machines and the steel used is 1 1/8 in. diameter with a hexagonal shank; bit size of the starters varies from 3 in. to 2¼ in. while the finishing steels give a hole diameter down to 1¾ in. All these integral steels have bits of the cruciform type and are dressed in a Climax No. 1 sharpening machine located in the blacksmith’s shop. Each hole is sprung twice with gunpowder, enabling about 200 lb. of I.C.I. Abelite to be loaded into the 20 ft. hole; initiation is by safety fuse and No. 6 detonator, supplied by Cookes Explosives Limited, Penrhynraudraeth, North Wales. Each hole is blasted separately when rock is required for production, bringing down an average of 2,000 tons; up to 6,000 tons has, however, been obtained on occasion from a single 20 ft. hole. Secondary breaking Two men are normally engaged on breaking rock chunks that are too large for convenient loading by the face excavators. A reference to Fig. 3 shows popholes in. in diameter being drilled in these boulders, after which they are loaded with in. gelignite and blasted by means of safety fuse. Ingersoll Rand JA.35 (34½ lb.) and JA.45 (44½ lb.) Jackhammers are used for this drilling in conjunction with tungsten carbide chisel-bit Hydraloy steels supplied by Hall and Pickles Limited, Manchester. These steels have a 3¼ in. shank and a range of lengths from 18 in. up to 4 ft. are kept available although the average depth of hole works out, however, to 12 in. An emery wheel is used in the fitting shop for resharpening of these steels, necessary after approximately 400 ft. of drilling. An average life of between 4 and 5 such re-sharpenings is obtained from each steel and the company, after testing many different makes of similar steels for popholing duties on this rock, has now standardised on this manufacture. Quarry face loading Two mechanical shovels are employed at the face for production loading of the broken stone and both of these may be seen in operation in Fig. 1. Due to the length of face being worked and the convenience of the arrangements for transporting the rock from face to plant, these two machines do not interfere in any way with each other. Shown in Fig. 4 is the 1½ cu. yd. Ransomes and Rapier type 462 shovel, fitted in this instance with a 1¼ cu. yd. special rock bucket. Carried on 24 in. crawler tracks 13 ft. in length, the standard model weighs a little over 37 tons and is equipped with a 23 ft. boom. This particular shovel is powered by a 100 h.p. McLaren MR.5 diesel engine driving through a fluid coupling; this form of power transmission is available as optional equipment on the 462 machine and its incorporation in the design enables full engine torque to be delivered up to the point when the bucket becomes stalled when digging, while shock loading and engine overloading are considerably diminished. The second machine employed on production loading at the face, and seen in operation on the left in Fig. 1, is a cu. yd. 19-RB excavator. This particular model is driven by a three-cylinder Ruston and Hornsby diesel engine, type 3-VQBN, which utilises the four cycle principle and develops 54 h.p. at 950 r.p.m.; this engine is started by compressed air delivered from an air receiver charged by a direct-driven compressor. Using an 18 ft. boom, the 19-RB weighs approximately 17½ tons, and has 20 in. wide tracks II ft. in length. Transmission of engine power is by roller-chain drive through a disc-type clutch. Transportation of broken rock from the face loading machinery to the primary crushing plant is performed by a fleet of seven Ford Thames model 7V five-ton tipping lorries; these vehicles have had their normal bodies removed and replaced by ones of special steel construction, made up by the quarry fitting staff in their own workshops. These bodies have been continuously modified as a result of experience gained with the loading of coarse-size rock from the excavators and the design currently employed, seen on the truck illustrated in Fig. 7, has been found to stand up well to the arduous duty of handling this material. The company operates a fleet of thirty Ford Thames trucks, the bulk of which are used on the transport of the finished products to the consumer; when the vehicles in the road fleet are superseded by new trucks, the older ones are transferred to this task of primary production transportation. It is also of interest to note that the tyres employed on these quarry face vehicles are those that have been discarded from the road trucks. Leading up to the chute feeding the primary crusher are two 1 in 6 inclined ramps, constructed of concrete and shown in Fig. 5. These ramps run from points roughly in line with the outer edges of the present quarry face working limits and the trucks have a relatively short haul of approximately 300 yards from each excavator to the discharge point at the chute. Primary crushing plant At the top of the two inclined runways leading up from the quarry floor, a concreted area has been provided (in front of the chute to the primary crusher) of adequate dimensions to enable trucks to manoeuvre easily and quickly when backing up to the chute. Fig. 7 shows a vehicle in the process of tipping its load of rock; it may be noted from this illustration that the chute has been extended above ground level and a transverse steel beam provided giving a positive stop for the back wheels of the truck when reversing into position for tipping. The chute has been lined throughout with detachable steel billets which may be changed when they become worn. The rock feed from this chute to the primary crusher is controlled by a Ross chain feeder, driven by a 6 h.p. G.E.C. electric motor through a Moss reduction gearing. A Broadbent 42 in. by 36 in. jaw breaker is installed here and set to give a —8 in. product at a rate of 80 to 100 tons per hour ; this crusher is powered by a G.E.C. 100 h.p. electric motor driving through nine v-belts on to one of the twin balanced flywheels as may be seen in Fig. 8. Lubrication of this plant is by a Tecalemit radial pump which may be seen in this illustration in front of the righthand flywheel. For clearing the crusher jaws of jammed oversize rocks with the minimum of wasted production time, a 2 by 2 lifting tackle and a No. 2 MacDonald compressed air hoist, supplied by McKie and Baxter, Paisley, is provided. The crushed material is discharged on to a 30 in. conveyor belt, powered by a Crompton Parkinson 12½ h.p. Klosd electric motor, for onward transmission to the secondary crushing house. While the conveyors employed throughout the plant are of Broadbent manufacture and utilise rubber belting supplied by the British Tyre and Rubber Co. Ltd., this first 30 in. conveyor installation is particularly worthy of note. In an endeavour to prevent excessive belt wear occurring at the point where rock discharged from the primary crusher lands on the belt, pneumatic rollers supplied by Conveying Developments Limited, Newcastle, have been installed in place of the normal steel type over that section of the conveyor run immediately beneath the crusher. These particular idlers are designed to be able to compress under the shock of stone striking the belt section carried by them and as a result there is not the same tendency for the rock fragments to cut into the rubber as is the case with a steel roller. Secondary crushing plant The —8 in. rock is discharged at the top of the secondary crushing house on to the dirt screen shown illustrated in Fig. 9. This is a single-deck Broadbent vibrating screen powered by a 10 h.p. G.E.C. motor and driven through an eccentric bearing. Having 1½ in. diameter holes, all undersize containing any quarry dirt present is removed and hoppered, thence being loaded out into trucks and sold as rubble for use on, for example, farm roads. The oversize material passing off the end of the dirt screen falls into a chute from the bottom of which the rock feed is split to the two secondary crushers. Figs. 10 and 11 illustrate these arrangements, showing this chute and the crushers which are identical installations, each being a 25 in. by 12 in. Broadbent jaw breaker driven by a Crompton Parkinson 40 h.p. electric motor through four v-belts. The discharge from these two machines is delivered to a 24 in. belt conveyor which elevates the material, of —4 in. size approximately, to the tertiary crushing plant building. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||