|
The Billingham Mine - Part 1Drawings and Photographs accompanying the article Scaling operations in progress on a 20 ft. roof. The pneumatic-tyred diesel vehicle shown mounts a hydraulically-elevated Jumbo crane which may be controlled from either the platform or driving position
Scaling operations in progress on a 20 ft. roof. The pneumatic-tyred diesel vehicle shown mounts a hydraulically-elevated Jumbo crane which may be controlled from either the platform or driving position Image Reference: L-00739-03-0065-F00 Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian. |
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||