|
Dec 1953 - Scaling operations in progress on a 20 ft. roof. The pneumatic-tyred diesel vehicle shown mounts a hydraulically-elevated Jumbo crane which may be controlled from either the platform or driving position
Dec 1953 - Scaling operations in progress on a 20 ft. roof. The pneumatic-tyred diesel vehicle shown mounts a hydraulically-elevated Jumbo crane which may be controlled from either the platform or driving position ["The Billingham Mine"] (from Mine & Quarry Engineering [December, 1953]) Image Reference: L-00739-03-0065-F00 Please note: We only have a low resolution copy of this image which is suitable only for display on this web page. |
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||