| Sample |
Description |
| Fig. 13 — Surface layout, Bates pit |
| Fig. 14 — Exterior view of screens and washery, Bates Pit |
| Fig. 15 — View of tub tipplers, Bates Pit |
| Fig. 16 — Interior of screening plant, showing rubber picking belts |
| Fig. 17 — Anti-breakage loading jibs, Bates Pit screening plant |
| Fig. 18 — Screening plant, Bates Pit, showing connection with shaft |
| Fig. 19 — Cambois Colliery, showing tubway from North Seaton in foreground |
| Fig. 20 — Tipplers, Cambois Colliery |
| Fig. 21 — Showing construction of creeper chain |
| Fig. 22 — Interior of one of the duplicate 160 tons per hour washeries |
| Fig. 23 — Refuse tip for stone and washery drift |
| Fig. 24 — Screens and plate-type picking belts, Cambois Colliery |
| Fig. 25 — Secondary nut screens, Cambois |
| Fig. 26 — Anti-breakage loading jibs, Cambois Colliery |
| Fig. 27 — Central screening plant and washery for Cambois and North Seaton Collieries |
| Fig. 28 — New 800 tons per hour coal loading plant in course of construction |
| Fig. 29 — Loading plant for Cambois and North Seaton pits |
| Fig. 30 — Layout of coal loading plant, Bates Pit |
| Cambois Colliery |