| Sample |
Description |
| Hauxley Colliery |
| Fig. 1 — Girder Clip for Bell Wire Insulators |
| Fig. 2 — Clip and Sling for Power Cable |
| Fig. 3 — Sketch Plan of Conveyor District in Bottom Seam, Hauxley Colliery |
| Fig. 4 — Showing Method of Timbering, Bottom Seam, Hauxley Colliery |
| Fig. 5 — A Steel-arched Roadway showing Brick and Timber Lagging |
| Fig. 6 — Main-and-Tail Electric Hauler, Hauxley Colliery |
| Fig. 7 — Mothergate Loading Point, 26-in. Belt Conveyor Discharging into Tubs |
| Fig. 8 — Old Coal Cutter arranged to Drive Auxiliary Endless Haulage |
| Fig. 9 — A 20-in. Cross Belt delivering on to a 26-in. Mothergate Belt |
| Fig. 10 — Shaker Conveyor on Face delivering to Trunk System |
| Fig. 11 — View on Face showing Coal Cutter |
| Fig. 12 — Tipplers designed for 25-cwt. Capacity Tub |
| Fig. 13 — View of Screen House |
| Fig. 14 — View of 216-H.P. Electric Winder, Hauxley Colliery |
| Fig. 15 — Hauxley Colliery Pit Top |
| Fig. 16 — "Broomhill" Turnout as constructed for Arcwall Work |
| Fig. 17 — Small Turnout for Ordinary Putting |
| Fig. 18 — Drawing of Arcwall Turnout |
| Fig. 19 — Plan of Panel Workings, Broomhill Colliery |