Coal-Cleaning Plant. The screening plant at the Ouston "E" pit has been thoroughly overhauled and partly remodelled, and a Birtley dry-cleaning plant added. As regards the screens, a new Turnbull jigger has been incorporated to make three sizes and two existing jiggers have been reconditioned. From the Turnbull screen the large is delivered to two picking belts, while the small is passed to a rubber conveyor band. The Birtley dry-cleaning plant is capable of handling about 100 tons per hour of the small (1½ in.-0) and reduces the ash content from 14 to under 8 per cent. Surface Arrangements at the Smaller Pits. Much of the plant at the smaller pits had fallen completely out of date and somewhat drastic remodelling was necessary. At the "C" pit an antiquated arrangement of "kick-ups" and bar screens, involving heavy labour costs, was scrapped and replaced by a modern tub-circulating system with creepers and rotary tipplers, and a jigging screen making three sizes. Three plate picking belts are incorporated, and after being hand-picked the coals are remixed on a cross belt and delivered into trucks for shipment. A separate screen and picking belt deals with the Busty coal, the smalls being utilised for coking purposes. Power is supplied by four 20-H.P., 440-volt motors by Metropolitan-Vickers Electrical Co. Ltd., this plant replacing a steam engine and some D.C. electrical plant. The screens and auxiliary equipment were supplied by F. Turnbull & Co. An old vertical steam winder is also being discarded, new electrical equipment by Metropolitan-Vickers Electrical Co. Ltd. and John Wood & Sons Ltd. now being in course of construction. This comprises a 9 ft. 6 in. diameter parallel drum driven by a 500-H.P., 2,750-volt motor, which will enable from 1,300 to 1,400 tons per day to be raised from the Towneley and Busty seams, the latter lying at a depth of 726 ft. The air-compressing plant, having a capacity of 5,000 cu. ft. per minute, is also being eliminated and electrical power substituted. When these alterations are complete the present boiler plant will be closed down and the whole colliery electrified. New screening plant has also been erected at the "D" pit, where an excellent quality of household coal is produced. This finds a ready market locally, and is sized into small nuts and best and filled into trucks on separate roads. Operations at the "F" Pit, which had been disused for two years when the present company took over, have been recommenced, and extensive alterations made to the plant. A new 14 ft. shaft has just been sunk to the lower seams and the whole plant is to be electrified, a 20,000-volt feeder from the Durham County Electrical Distribution Co. providing the necessary power. The present old shaft raises 750 tons per day and eventually, when the new shaft is in operation, an output of 2,000 tons per day will be obtained from the colliery. The old shaft is being equipped with a 175-H.P. winder similar to that being erected at the "E" Pit, and the new pit has already been provided with a permanent winder which has been used for the sinking. Heenan & Froude Ltd. and the A.E.G. Electric Co. Ltd. were responsible for this latter equipment, which incorporates a 9-ft. 6-in, drum and a 320-H.P., 2,750-volt motor. Other changes are represented by a new screening plant supplied by Nortons (Tividale) Ltd. to yield four classes of coal ; the electrification of the Guibal fan, which is now driven by a 60-H.P. Metropolitan-Vickers motor in place of an 18-in. x 20-in, steam engine ; and by the electrification of a haulage engine below ground. An Ingersoll-Rand 2,000 cu. ft. capacity air compressor will be put on reduced load to serve the heading drills as soon as the sinking is completed, all the other underground equipment being scheduled for electrification. A wagon engine used for "G" Pit coal has also been converted from steam to electric drive, the mechanical work having been carried out by John Wood & Sons Ltd., and the electrical gear, which includes a 225-H.P. motor, by Metropolitan-Vickers Electrical Co. Ltd. Similar changes have been made at the "G" Pit; the "kick-ups" and bar screens have been replaced by rotary tipplers and jiggers by F. Turnbull & Co. and new picking belts supplied by the Blantyre Engineering Co. Ltd. A 100-H.P. induction motor has been substituted for the steam engine driving the Waddle fan. A surface drift contributes to the output of this pit, being supported by steel arch girders and lined with concrete slabs. This drift is connected to the screening plant by means of a gangway. Modern efficiency demands its price, and we are almost sorry to say that at this pit an old beam pumping engine which would have attained its centenary next year has just been put out of commission. This venerable machine, built by Murray, Chester-le-Street, in 1831, has a cylinder 45¾ in. in diameter by a 7 ft. 9 in. stroke and was provided with a 20¼-in. bucket, the working steam pressure being 25 lb. It has been replaced by two five-stage turbine pumps by W. H. Allen Sons & Co. Ltd., one of which serves as standby. Crompton-Parkinson motors of 160 H.P. each provide the drive, and each pump is capable of raising 700 g.p.m. against a head of 400 ft. An 8-in, steel rising main has been provided, this being of Victaulic tubes centrifugally lined with bituminous compound. A tandem main-and-tail haulage has also been electrified, one drum serving the pit and the other the drift. This equipment is driven by a 100-H.P. motor through David Brown reduction gear. At the company's Blackhouse "H" Pit a new screening plant by Head Wrightson & Co. Ltd. has been erected, and this completes generally all that can be said about the surface reconstruction work. Coal Face Plant. As will be gathered from the foregoing, the general policy has been to change over from compressed air to electricity ; this policy has been reflected in the underground equipment by the suppression of most of the air-driven plant, the only connections retained being those for operating hammer drills in drifting and heading work. Coal cutters have been introduced wherever practicable, the general plan being to use arcwallers for opening-out work and chain machines on the longwall faces. British Jeffrey-Diamond Ltd. and Anderson Boyes & Co. Ltd. are the two firms most represented in this class of equipment, and as a variant to the arcwallers "Siskol" and "Hardy" 3½-H.P. electric heading machines are employed. As regards compressed-air equipment, there are in use hammer drills of various makes. The longwall machine faces are set out in lengths of approximately 120 yards according to circumstances and are worked by 14-yard gateways and single-unit conveyor system. Where conveyors are in use, the shaker type is adapted in some instances discharging on to a centre gate ; the conveyors have been supplied by the Mining Engineering Co., of Worcester. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||