Museum
Friends of Durham Mining Museum
Events Calendar
Join our Friends!
Newsletter Contents
Items for sale
Items for Sale
e-Books
Photograph Gallery
Document Archive
Discussion Forums
What's new in the site

Mining History
Colliery Index
Colliery Maps
Educational Material
Bibliographye
Workers/Employee Lists
Notes for Family Historians

Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials

Links to other sites of interest
Industrial Heritage Days Out

View our Guestbook

Index to site



Mail: Webmaster


 

ELECTRICAL ENGINEERING INFORMATION PAPER

Garforth LampsEI/G(70)5
 Dated 9.9.70

1. Attached are modified instructions for the maintenance of Garforth lamps; these revised instructions include the measures necessary to eliminate the principal shortcomings — false gas caps and/or condensate collecting in the Garforth chamber — exhibited in some degree by the three lamps in general use.

2. A copy of a report of the work done by S.M.R.E. in establishing the reasons for the formation of condensate and the methods of eliminating it is held by Headquarters and will be loaned on request from Areas.

3. The situation in respect of the three lamps is as follows:—

  
(a) Protector Lamp and Lighting Co. Ltd.
  
The company is proceeding with manufacture of the stainless steel burner tubes with the intention of providing replacement tubes to those Areas in which condensation has been a major problem , before the end of the year and the onset of cold weather. Supplies to other Areas will follow immediately thereafter. The cost of the replacement tubes is not expected to exceed 10/- each.
  
In the meantime it is important that the present brass burner tubes be maintained at a height of at least 0.030 in above the top of the thimble. The firm has been asked to seek formal MINTECH Approval for both the modified burner tube and the heat exchanger but in view of the satisfactory performance provided by the stainless steel burner tube alone it would seem unnecessary to make recourse to the heat exchanger.
  
(b) E. Thomas & Williams
  
The same situation exists here as with the Protector Lamp & Lighting Co.
  
(c) Wolf Safety Lamp Co.
  
The problem with this lamp has been one of diffusion of fuel vapour through the fuel vessel cover plate giving rise to false gas caps. The remedies for this are two-fold; firstly ensure that the top of the absorbent felt pads in the fuel vessel is not in contact with the cover plate, and secondly to coat the underside of the cover plate with a layer of epoxy resin.
  
The company has about two hundred new cover plates in store and will treat them with epoxy. The treated discs will be offered to Areas to enable the replacement of some untreated covers which may then be treated by either Scientific Department or Area Central Workshops as may seem most appropriate.

Details of the treatment are as follows :—

 (i) 
Remove filter from Garforth chamber and pyrophor bar from re-lighter.
 (ii) 
Heat the fuel vessel cover to 100°C for about 8 hours then allow to cool. N.B. This treatment is necessary only for previously used covers.
 (iii) 
Rub down the bottom side and edges with fine emery paper. (Grade 1 M is suitable).
 (iv) 
Wipe over surface so roughened with a rag moistened with acetone. Allow to dry thoroughly.
 (v) 
Paint the bottom surface and edges with a mixture of MY 750 epoxy resin and HY 951 hardener. The proportions should be approximately 4 parts epoxy resin to 1 part of hardener. These products are manufactured by CIBA (A.R.L.) Ltd., Duxford, Cambridge.
 (vi) 
Cure at 100°C for 10-15 minutes, or at room temperature, for 12 hours, the latter method usually yields better surface finish.
 Note 1 
If a uniform coating is not obtained by the treatment given, the dull patches may be touched up with a fresh mixture of epoxy resin and hardener or, alternatively operations 3 to 6 repeated.
 Note 2 
The top surface of the fuel vessel cover should not be treated.
 Note 3 
Brushes should be cleaned in acetone immediately after use.

4. It should be noted that S.M.R.E. are not making the above modification a condition of the approval certificate but we are requested to put the modification into effect as quickly as possible.

Prev Page Return to Top of Page Next Page



Back

Home
Copyright © 1999-2012 by The Durham Mining Museum and its contributors
Page last updated: 01 Jan 2008

Search

Print