In this Chapter the most important legal requirements as to the support of the roof in the roadways are set out and explained.
The Manager must keep the roof and sides of roads secure by controlling movement of the strata. He must see that he possesses the necessary information in order to be able to perform this duty.
Although the roof and sides of all roadways must be kept secure, they do not necessarily require artificial support. A sandstone-post roof in a roadway may stand without support for many years but it must be inspected and dressed regularly. Where supports are required, however, they must be set systematically and regularly, and naturally must be adequate to support the roof and sides. There are regulations relating to the setting of systematic supports in roadways — at roadheads, road junctions where vehicles or a conveyor run, and in every length of road in which persons work (unless they work there only occasionally or for short periods). An inspector may always tell the Manager that a length of road needs more or better support.
If props are used as supports in a roadway, they must be set securely and on a proper foundation. If a workman, whose duties include the setting of props, notices that a prop has broken or become unstable, he must either repair it or, if unable to do so, report the defect to the person in charge, who must take all reasonable steps to ensure that broken or unstable props are either replaced or made stable. A suitable wooden lid must be inserted between the top of the prop and the roof or bar if a bar is used. It must be thick enough and sufficiently large to cover the top of the prop. An inspector may always exempt a mine (in whole or in part) from the application of the regulation about wooden lids if he considers them unnecessary. In the case of chocks, anybody building a chock which is to form part of a system of support in a mine must build it on the natural floor and make it tight to the roof. Unless a chock is intended to be left in a pack or in the waste, the timber forming 'main members' must have flat bearing surfaces when they are in contact with any other 'main member'.
Packs also must be made tight to the roof over their whole area as far as practicable. If a pack is built by hand or by hand tools, it must be filled with debris and the walls must be built on the natural floor.
Bars must be used over the whole width of every roadhead in a mine and throughout the distance specified in the support rules. They are necessary in certain other cases when the road passes beyond a face to which it leads. If crossbars are used at roadheads, then they must be placed at the intervals specified by the Manager. As in the case of face supports, the intervals between adjacent bars must be four feet or less. The interval may be greater if crossbars are installed at intervals of four feet or less. If the roof of a roadhead is ripped, at least one bar must be set and extending over the whole width of the ripping and as near as practicable to the ripping lip. The faces of the ripping must have effective support and temporary supports must be set immediately for newly exposed roof.
Props must be set at regular intervals.
If the interval between any working face (including one at a roadhead) and the front row of props exceeds 3 feet at any time when filling is taking place, temporary supports must be set in advance of the front row of props at intervals of not more than 3 feet, an interval which may be shortened by an inspector.
During holing at any working face (including a face in any roadhead) holing props, sprags or other suitable supports shall be set immediately at intervals not exceeding 6 feet, as may be specified in the support rules. These supports must not be removed until the mineral holed is about to be taken down. The inspector may grant exemption from this regulation.
Generally speaking, in these regulations the type of supports used in roadways is not specified. In practice the arch girder is most frequently used.
A copy of all relevant support rules must be kept at the mine office or elsewhere if an inspector approves. A copy of support rules relating to the district must be supplied by the Manager to the deputy who is in charge of the district and shall be kept posted at the entrance to the district so as to be easily seen and read by the workmen. Also, the Manager of every mine must supply to every person employed at the mine who is concerned in setting supports a written instruction or diagrammatic document explaining the effect of the rules as they concern him.
Everyone working at a face (including a place in a road at which ripping or repair work is in progress) or setting or withdrawing supports, must carefully examine his working place at the beginning of each period of work and at appropriate times during the course of it, and in particular after any shot has been fired there or nearby and after any other interruption of work. If one man is in charge of several others, it shall be sufficient if he alone makes such an examination. Everybody working at a face must see that his working place at the end of his period of work is safe. (If he thinks there might be a danger to the mine, he must take counteracting measures if it is his normal duty to do so. If not, he must fence off the place and report the matter immediately to a mine official.) There is nothing to prevent workmen from setting extra supports (i.e. at shorter intervals) if they have reason to consider them' necessary for safety.
If there is a fall of roof or side which involves the displacement or breakage of any support at a place where anyone has to work or pass, then the person in charge must ensure that any roof or side so exposed is dressed and secured by supports. Dressing and securing must take place before debris is cleared except in so far as such clearing is an indispensable preliminary to the setting of the supports.
Nobody must withdraw support from the roof or sides of any place unless he uses a device from a position of safety. In practice, it is advisable to use a safety device such as a sylvester or a monkey winch for withdrawing supports from under face rippings or for removing roadway girders.
If at any face working, supports are withdrawn from the waste or from under the roof adjoining the waste, supports must be set at regular intervals to prevent the breaking of the roof overriding the supports at the face working and occurring otherwise than in the waste.