Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
Items for sale
Items for Sale
e-Books
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

E-Book Prev Page Return to Index Next Page E-Book
/   \

Chapter XIII.

Great Difficulties Encountered In Opening Out The Famous Wallsend Colliery. — John Buddle, Senr. — Cast-Iron Tubbing.

In the district situated between the town of Newcastle and the mouth of the River Tyne, there lay a tract of land beneath which existed an important seam of coal known as the "Main Coal," the peculiar excellence of which for household purposes rendered it the most valuable seam in the Great Northern Coal-field at this epoch. The tract in question — locally termed "the Tyne basin" — being intersected by the River Tyne, presented unusual facilities for the shipment of coals; but the depth of the seam from the surface had hitherto operated to retard its development.

Near the centre of this tract stood the village of Wallsend (so named from its position at the eastern end of the Roman Wall), in the vicinity of which the opening out of the famous Wallsend Colliery was commenced in the latter part of the eighteenth century.

Though this colliery eventually became exceedingly prosperous and profitable, and the excellent quality of its coal led to the name "Wallsend" being adopted as a password by other collieries, the winning of the pits proved one of the most arduous mining enterprises which had up to this time been attempted. Difficulties arising from quicksands, water, and inflammable gas, taxed to the utmost the arts of the miners, and occasioned numerous disasters during the infancy of the colliery.

Sinking operations were commenced at Wallsend in 1778, but the first pit was lost in a quicksand. A second attempt narrowly escaped the same fate; but by means of successive tiers of piles the shaft was carried through the sand, though its diameter was reduced in the process to five feet eleven inches. Two shafts — the A pit and the B pit, the latter being nine feet in diameter — were at length carried down to the seam at a depth of about one hundred fathoms, and the working of coal began in 1781.

Pumping engines were applied in both pits, but they were of inadequate power; a circumstance which, aggravated as it was by great abundance of fire-damp met with, caused the greatest difficulty to be experienced in carrying on the colliery. In October, 1783, a "blower" of fire-damp ignited at the candle of a hewer, who fled precipitately without attempting to extinguish the flaming gas. The overman made a courageous attempt to reach the seat of the fire, but was overpowered by the smoke and noxious gases and suffocated; and it having become evident that the coal itself had been set on fire, the burning district was flooded with water in order to extinguish it.

The above accident did not long delay the colliery operations, but two years later an explosion occurred which entailed a long series of disasters. On the 9th of October, 1785, the discharge of fire-damp so overloaded the ventilating current as to raise it to the firing point, when it ignited at the ventilating furnace and produced a severe "blast" in the upcast, or B pit. Fortunately the few men who were in the mine at the time were occupied at the bottom of the other pit, and succeeded in escaping to the surface without serious injury; but the woodwork supporting the pumps in the B pit was blown out, and the coal at the pit bottom set on fire, so that it became necessary to seal up the mouths of the pits, and to flood the workings with water a second time in order to extinguish it.

The pits remained covered up till the 2nd of November, when three men descended the B pit to examine the state of the shaft by the light of a steel mill; but no sooner had they reached a depth of seventy fathoms from the surface than an explosion took place which killed the whole of the exploring party. Up till this time implicit reliance had been placed in the safety of the steel mill by the Wallsend miners, in consequence of which this explosion caused great consternation. The use of the instrument, however, was continued, and the repairs in the shaft were proceeded with by its light.

On the 11th of November, while the engine-wright and an assistant were engaged in changing a bucket in the A pit by the light of a steel mill, another explosion occurred which killed both, and occasioned a great panic. Still the mill was scarcely suspected, the pitmen preferring to imagine that the explosion originated from fire in the workings under water, or some other mysterious cause. Its use was accordingly continued in executing the repairs in the B pit till the 21st of December, when another explosion occurred, by which the overman and a sinker who were at work in the shaft were both killed.

This accident shook the confidence of the miners in the mill to such a degree that for some time they dared not venture to employ it, preferring to work by such other feeble light as they could obtain. The daylight received from above being dim and imperfect, fish in a phosphorescent state and various preparations of phosphorus were tried, but with little benefit. Another method, accidentally discovered, afforded material service. It happened that a carpenter engaged upon some work at the top of the pit in which he made use of a bright new hand-saw, turned the blade to such an angle as to throw a flash of light down the pit. The sudden gleam so alarmed the men below, who thought the pit had fired, that they demanded to be drawn to the top with all speed. The discovery of the cause of the alarm led to the employment of a mirror at the top of the pit, which proved of great service during periods of sunshine.

The progress of restoring the colliery, however, being slow and tedious, the season being the depth of winter, the steel mill began again to be partially used; but on the 14th of February, 1786, another explosion took place in the B pit by which three men were severely burnt. The mill was in consequence once more thrown into discredit, and the work proceeded very much in the dark. None but the most intrepid colliers would venture down the pit. Two men descended at a time in a sinking corve, with a rope round their bodies to attach them to the chain. They grubbed about and filled the corve with their hands as well as they could, and then returned to the top with it. This trip constituted their shift, for which they were paid 5s. each with a pour boire into the bargain.

By continuous struggles in this manner the pits were at length cleared, and the water lowered sufficiently to allow a current of air to pass between the pits, after which the operations for restoring the colliery to working order went forward more briskly. The steel mill was again introduced as the only light available underground, and all went well till the 9th of June, 1786, when an explosion took place in the workings near the bottom of the A pit. This explosion did not kill any of the workmen who were in the pit at the time, and was distinctly ascertained to have been occasioned by a spark from a steel mill. The overman was "playing" the mill at the moment, and saw the gas igniting at the sparks which it produced. The explosion did little damage beyond paralysing the exertions of the workmen for a time. Work, however, was soon resumed, and on the 19th of July, 1786, the drawing of coal was again commenced at the A pit after a cessation of upwards of nine months.

In the meantime the repairs in the B pit were continued till the 3rd of November, when another explosion occurred by which six lives were lost. The men were engaged in making a communication between the two pits, and were under the necessity of working among inflammable gas. Having no alternative but to use the steel mill or to work in absolute darkness they preferred the former course, but the result proved fatal to them. The excavation was subsequently effected without light of any kind, and bore the name of the "Dark Wall" ever after. The repairs to the B pit were completed, and work again resumed on the 7th of January, 1787, the ventilation being improved by placing a powerful furnace at the shaft bottom and other measures.

The foregoing and one or two accidents which subsequently occurred pointed to the necessity of having additional shafts, the sinking of which was accordingly proceeded with; and after the C and D pits came into operation, in 1790, the colliery was carried on with great success, and no more fatal accidents occurred for a considerable number of years.

Shortly after this period (about the year 1792) John Buddle, senr., father of the celebrated John Buddle, entered upon the management of Wallsend Colliery, which soon became the most important colliery on the River Tyne. Comparatively little appears to be known regarding the elder Buddle. He is stated to have been a person of great intelligence, and possessed of considerable literary and scientific attainments, lie took delight in solving mathematical and scientific problems, and kept up a correspondence with Hutton, Emerson, and others, on subjects in which they took a common interest. He was a frequent contributor to the Ladies' and Gentlemen's Diaries, and from a mathematical question propounded by him in the latter periodical we learn that he was born in the year 1743. In early life he resided at Chester-le-Street, the centre of the mining district of the River Wear, where for some time he held the position of schoolmaster. From thence he removed to Kyo, a small village near Tanfield, and here his son John was born in 1773. We are unable to state the precise date at which the elder Buddle abandoned the "delightful task," for the more arduous but more remunerative profession of colliery viewer, but it must have occurred several years subsequent to the birth of his son, inasmuch as the only regular schooling young Buddle got, is said to have consisted in one year's attendance at his father's school when very young. At this period Mr. Buddle published an edition of the Marquis of Worcester's Century of Inventions, to which he appended some historical notes relative to the invention of the steam-engine. The preface to the work (which was subsequently republished by his son) is dated "Kyo, near Lanchester, 1778."

From Kyo, Mr. Buddle removed to Greenside, near Ryton, to superintend the colliery operations there. In explanation of his acquaintance with the theory and practice of coal-mining it has been stated that he had originally been a pitman; but however this may be, the skill with which he discharged the duties of colliery viewer is sufficiently attested by the fact of his being selected by Mr. Russell to fill the difficult position of manager at his colliery at Wallsend, whither he removed about the year 1792, as already stated, and where young Buddle, now a lad of nineteen, acted in the capacity of assistant to his father.

The successful establishment of Wallsend Colliery was followed by the opening out of a number of other deep collieries in the immediate neighbourhood, on both sides of the River Tyne, to work the same valuable seam of coal. Of these Hebburn Colliery, 129 fathoms in depth, was won in 1792-4; Percy Main Colliery, 120 fathoms, in 1796-9; Jarrow Colliery, 128 fathoms, in 1803; and South Shields Colliery, 140 fathoms, in 1810.

The opening out of the above important collieries caused the Tyne basin to become the great theatre of mining operations in the north at this epoch. The sinking of the pits was in most cases attended with much difficulty, on account of the watery strata passed through, from which large feeders of water were discharged into the shafts, necessitating the employment of tubbing to dam it out. In the case of Hebburn Colliery these feeders amounted to 3,000 gallons per minute. Up till this time the universal practice had been to construct the tubbing with timber, and the same custom was pursued in the case of the shafts at Hebburn, Jarrow, and South Shields; the timber being applied either in the form of plank tubbing or of solid cribbing. Cast iron, however, which was gradually supplanting wood on the surface and underground railways, and was likewise now beginning to be used in the construction of bridges, offered a superior material for damming out the water in the shafts, and a commencement was accordingly made to substitute this for wood tubbing. In the year 1792 a cast-iron tub, consisting of cylinders the full size of the pit, was applied by the elder Buddle to dam back a quicksand in the A pit at Wallsend. Similar cylinders were employed by Mr. Barnes in the King pit at Walker Colliery about 1795. This form of tubbing, however, was only available near the surface, but by dividing the rings into segments it became applicable in any part of the shaft. Segments of cast iron, having flanges turned inwards for bolting the pieces together, were first used by Mr. Buddle, in 1796-7, in sinking the Percy Main pit. An improved form of segments, having the flanges turned outwards and without bolts, was introduced by the same gentleman in sinking the Howdon pit in 1804-5 ; an arrangement which has ever since been universally adopted where cast-iron tubbing is applied under ordinary circumstances.

 

Prev Page Return to Top of Page Next Page
mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print