Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
Items for sale
Items for Sale
e-Books
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

E-Book Prev Page Return to Index Next Page E-Book
/ Index \

belled out from 14 feet, the finished size to 21½ feet in diameter, the first course of oak cribbing (consisting of three cribs backed with inch deals, and 5 feet in height), was placed, and hung from the limestone by eleven iron rods, 12 feet in length, fastened into the solid stone above. This shaft was now fairly launched into the sand.

The difficulties and delays to the advanced progress may be judged of by the following:- From April 10th to May 10th, inclusive, the sinkers have been in the bottom on an average of 7.3 hours per day. The number of buckets changed during the same time has been 378, and 38 clacks, equalling an average of 17.3 per day. — Cost of grathing the buckets: side leathers (19 inch buckets) 8½ lbs. at 2s. 9d.; one pair falls, 6 lbs. at 2s. 9d,; brass muds, 4 lbs. at 1s. 6d. = £2. 5s. 10d.: side leathers (16 inch buckets), 7½ lbs. at 2s. 9d.; one pair falls, 4½ lbs. at 2s. 9d.; brass muds, 3 lbs. at 1s. 6d. = £1. 17s. 6d. The consumption of Coal for the engines, &c. amounted to 1,000 chaldrons fortnight whilst all the engines were employed. Various kinds of leather were tried, including hippopotamus and buffalo hides, even cautchouc made to the full size of the side leathers, and also for bucket and clack falls, without entire success. Metallic packing was also used, with partial success; the scouring of the sand through every material was a serious object. Even the bucket shells, as well as bucket doors, were wormed through in a most curious manner, similar to the action of the marine worm on ships' bottoms. Having secured a similar timber ring in the other pits at the top of the sand, concentric oak cribs were then laid, backed by sheet piling 10½in length made of Norway battens, Memel deals, and rock elm 4½ inches thick, shod and hooped with iron. These were driven by a number of hand pile drivers, and the cribs drifted down with them to guide their course. The irregular structure of the sand caused a great deal of trouble; some parts being very soft and loose, whilst others were as hard as adamant, so that great difficulty was experienced in keeping the piles in line. We also found it necessary to keep a quantity of whins (gorse) and straw ready to stem the loose sand and gullets.

It was now deemed expedient to suspend the sinking at the West or New Pit, and by heaving the sets up clear of the sand in the bottom and keeping them pumping pure water, enable us to push forward the other two shafts with all the available strength. Success crowned this more, and on the 12th Aug. the East Pit, and on the 14th, the Middle Pit were safely got through the sand, with ample space to maintain their respective diameters intact. Considerable difficulty was, however, yet experienced in getting a satisfactory foundation for the wedging cribs in both these pits, from the soft and spongy nature .of the red and blue metal underlying the sand. At a distance of 9 feet in the one pit we encountered a bed of hard black metal, and in this laid the crib, and the tubbing set on and closed to last batch, put in above the sand, leaving a part of the plug holes running, to relieve the pressure in the other pit. In the East Pit, after several courses of tubbing had been set on, the tubbing was found to have flattened on two sides, forming an ellipse instead of a circle. These two sides not admitting the tubbing so as to maintain the full size of the shaft, we had to remove it, and were thus again exposed to the action of our old enemy. To add to our misfortune, the V bob, or middle set, burst near to the bottom, and had to be replaced before we could proceed. After these two pits were tubbed through the sand, the sinking of the West or New Pit was resumed, continued through the sand, which was more rapidly accomplished, and on Jan. 25th. 1842, a double metal wedging crib was laid at 17 feet below the sand, and on the 29th the tubbing was closed. On the 5th Feb. the wedging of this tubbing being complete, water was plugged off, and all the troubles and difficulties of this business seemed to be at an end. Next day, however, an explosion took place from the air pressure behind, which ruptured the tubbing at the top of the sand to such an extent that fourteen courses had to be reset. To prevent recurrence of this casualty we put in several 2 inch brass taps; and took pipes up into the standing set cistern. A borehole was also put down from the north engine staple into the sand, which gave a vent to any air or gas that might accumulate.

The whole of the three shafts were now completed to a depth of 83 fathoms from the surface, and rendered perfectly dry. The ordinary sinking, being resumed. no further or unusual difficulty was met with, and they were all carried down in safety to the Hutton seam in April, 1843. at the depth of 218 fathoms from the surface, The engine pit being continued down to the depth of 252½ fathoms for sump and standage. This pit contains 106 fathoms of walling, 62 of metal tubbing, and 80 of naked rock, equal to 248 fathoms.

After the Middle Pit reached the Hutton seam, and before any brattice or slides had been put in, an acoustic phenomenon was observed. The distinctness with which you could hear the voices of the men, even in a whisper, between top and bottom (nearly 1,500 feet) was remarkable. This was, however, destroyed as soon as the first fittings were put in, after which ordinary sounds became quite inaudible. A tube of either lead or gutta percha. it was thought, might be advantageously employed for communication between top and bottom, instead of the ordinary signal ropes. The experiment was tried and tested at various distances, but the sound became less distinct as the experiment proceeded, and at the depth of little more than 30 fathoms it was too indistinct to be of service.

The thickness of sand in the East Pit was 34 feet 6 inches, in the Middle Pit 27 feet 8 inches, and in the West Pit 26 feet, equal to 88 feet 2 inches. In order to prove whether the feeders of water met with in the course of sinking through the sand had any connection with those passed through in the limestone, the several batches of tubbing were occasionally tapped, and invariably found full, and apparently under the original pressure. From the surface to the Hutton seam, the average sinking of the pits was 2 fathoms 1 foot 1 inch per week. The engine power and the various appliances were — engine power, 1,584 horse power, supplied with steam from 39 boilers. Pumps — 18 sets with 19 inch working barrels and 202 inch common pumps, 9 sets with 16 inch working barrels and 17 inch common pumps. equal to 27 sets, out of which 6-19 inch and 3-16 inch delivered at bank. Water raised — 6-19 inch sets, with an 8 feet stroke, 12 strokes per minute, 6,912 gallons; 3-16 inch sets, with 5 feet stroke, 19 strokes per minute, 2,394 gallons, equal to 9,306 gallons of water per minute, from a depth of 90 fathoms or 540 feet. Crabs, &c. — 5 pair main crabs, 9 pair ground crabs, 3 cradle crabs, and 3 gins, with a fill compliment of ground blocks. ground spears, working spears, ropes, tackles, &c. The greatest objection to using cylindrical tubbing for passing through sand beds consists in the difficulty of keeping it in a vertical position, owing in a great measure to the irregular structure of the sand and the immense weight or pressure required to propel it forward.

It thus appears that the winning of this colliery required above five years to approach the main seams of Coal; and it was not until some years afterwards that the workings were got under way to the extent anticipated. But there had to be got rid of, as stated above, the almost incredible quantity of water, equalling 9,306 gallons of water per minute, from a depth of 540 feet, and requiring steam engines of about 1,584 horse power. At the present time. now about twenty years since the commencement of the winning, the workings are only approaching full operation, as compared wit the average quality of Coals drawn by similar pits in the neighbourhood. The total cost of the Murton Winning is stated to have been from, £300,000 to £400,000, and the interest upon this large sum, during the period the concern was unproductive, must have added very seriously to the amount of capital sunk in this arduous undertaking.

 

Prev Page Return to Top of Page Next Page

Please Note: These web pages retain the original pagination from the publication

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z