National Coal Board
No. 2 Area — Durham Division
Herrington Colliery Reconstruction
History
Coal Mining in the Herrington area dates back to the Eighteenth Century when the Margaret Pit was first sunk. Later the Dorothea Pit was sunk in 1816. These two Collieries were bought by the Earl of Durham in 1819, and eventually in order to develop further the area, the present Herrington Pit was sunk in 1874, and today is still referred to locally as "The New Pit".
The original Shafts were sunk to a depth of 1017' (777' B.O.D.) to the Hutton Seam, the main developments being in the Main Coal and Maudlin Seams. Coal drawing was confined to the Downcast Shaft which was equipped with Double-Deck cages, each carrying three tubs of 8-cwt. capacity. The steam driven winding engine had a single vertical cylinder of 56" diameter by 84" stroke, which at the time was one of the largest in the Country. This engine continued in use until 5th March, 1955. Originally, the Pit was ventilated by a huge furnace in the Maudlin Seam, but at the beginning of the Twentieth Century two steam driven Waddle Pans were installed.
By the end of the Nineteenth Century output had reached 1,600 tons per day, but mining conditions became more difficult and output fell. To overcome this, development in the thinner Hutton Seam was speeded up and machine mining introduced with compressed air driven coal cutters and chain conveyors. By 1907 five or six Conveyor Faces of 100 yards in length were in production in the Hutton Seam, the use of compressed air in the pit was discontinued and electric power was installed for haulers, pumps and face machinery. As a result of these developments outputs increased to about 1,300 tons per day, and continued at this level until about the end of World War II. By this time the Hutton and Seams above were rapidly becoming exhausted and also more difficult to work owing to the presence of large quantities of water of many years standing in goaves and old workings overlying extensive areas of the seams being worked, and output decreased to about 900 tons per day.
It was decided therefore, in 1945, to deepen the Downcast Shaft to explore the lower Seams and prepare for a complete reorganisation of the colliery including the lower seams of neighbouring collieries. This deepening commenced in 1946, and by early 1947, at the commencement of Nationalisation, the Bottom Busty Seam had been reached at a depth of 1094' B.O.D.
The Position At Vesting Day:
The Colliery as it stood was capable of drawing and dealing with an output of 1,500 tons per day, but output had fallen to 900 tons per day owing to the difficulties already enumerated. Haulage was expensive and O.M.S. at 16.5 cwts. was low, and continuing to fall. It was felt, therefore, that the development of the lower seams should be on different lines, and that the existing haulage in the middle seams should be completely changed.