|
Ashington Swimming Baths (Northumberland)A plan of this building with a brief description will be found in Appendix VII of the Eighth Report; it is a particularly fine example of an indoor swimming bath. The interior illustration shows the water chute and diving stages. The spectators' galleries, which run the whole length of the building, can also be seen. The rubber curtains on each side conceal the entrances to the two dressing corridors, which are each equipped with twenty dressing boxes; bathers are required to pass under shower baths, of which there are six on each side, before entering the swimming pool. The water circulates through a filtration plant, and is completely cleansed every four hours. The building was designed by Messrs. Marshall and Tweedy, of Newcastle-upon-Tyne, acting in co-operation with the central advisory staff. The cost of the building was approximately £12,000. It was opened in March, 1931, by Mr. Ridley Warham, of the Ashington Coal Company. Drawings and Photographs accompanying the article
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||