Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Welfare Previous Page Return to Index Next Page Welfare
/ Index \

Dawdon colliery baths, Durham

The installation at this colliery will provide accommodation for 2,520 men under the present contract, but the building will be capable of extension so as to provide accommodation for a total of 3,696 at a future time if found necessary. The accompanying plans show both the portion under construction and the future extension.

The site is somewhat restricted, and this has resulted in the accommodation being arranged on two floors, the full extent of the site having been utilized for the ground floor and the future extension being permitted by an extension of the accommodation on the first floor. The first part of the scheme provides for 1,848 pairs of lockers and 96 bath-cubicles on the ground floor and 672 pairs of lockers with 32 bath-cubicles on the first floor. 1,176 pairs of lockers and 64 bath-cubicles can be added on the first floor. The general direction of movement is across the width of the building. The lavatory accommodation, bottle-filling and drinking water supplies, boot-cleaning and boot-greasing apparatus are arranged on the ground floor adjacent to the pit entrance and accessible direct from the colliery yard. The clean entrance on the other side of the building is approached from the colliery road.

In addition to the difficulties consequent on the restricted shape of the site, some difficulty was experienced with the footings, which necessitated the construction of pier and beam foundations in reinforced concrete taken down to a depth of 12 feet in some portions; but apart from these disadvantages the site is admirably placed in relation to the pithead and approach road.

The scheme will be provided with independent boiler plant and with water-softening plant. Water for both bathing and swilling-down purposes will be obtained from the public supply. The whole of the bath and soil wastes will be turned into an existing sewer which passes the site and outfalls into the sea a short distance away. The plenum system of heating and ventilating will be installed.

The contract price for the first part of the scheme (accommodation for 2,520) is £32,313, but it should be noted that the whole of the ground floor structure has been strengthened sufficiently to take the extension to the first floor at some future date. Included also in this first contract are the staircases, entrances, boot-cleaning and boot-greasing machines, boiler-plant, heating and ventilating equipment, hot and cold water storage, lavatory accommodation and complete drainage system, all of which are of sufficient capacity to meet the ultimate requirements of the full scheme. Approximately £3,400 of the initial cost relates to the extension. The additional cost involved in building the extension is estimated at £7,575, which is included in the total allocation of £39,888. This represents an average cost per head of £10 16s. inclusive, or of £10 if the cost of the boiler plant, water-softening plant and special foundations is excluded.

Prev Page Return to Top of Page Next Page

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z