The installation at this colliery is mainly on one floor, but the disposition of the entrances required a double storey arrangement at that point.
Owing to difficult levels and the congested arrangement of buildings at the pithead the colliery company were compelled to offer a site for the baths on the far side of the main road between Sunderland and South Shields. This necessitated the linking up of the colliery yard and the bath building by means of a bridge over the road, giving direct access at the same time to the railway platform where the majority of the workmen arrive and depart. The bridge takes the form of a covered way leading from the railway platform, bounding the colliery yard near the lamp-room, to the pit-entrance of the bath building.
These conditions presented an unusual problem in planning, and the building as designed permits men arriving by railway to enter the building from the bridge and descend to the clean-clothes locker-rooms by means of separate staircases. At the same time men after their day's work enter the building from the bridge in the boot-cleaning and lavatory section and continue by separate staircase to the pit-clothes locker room, passing thence from the bath section to the clean locker-rooms and returning by the first-mentioned staircases to the railway departure platform. Separate entrances for men living in the neighbourhood of the colliery or travelling by omnibus or bicycle are arranged on the ground floor and are conveniently linked up with the staircase halls.
The building provides accommodation for 2,488 men, i.e. 4,976 lockers, and the bath section contains 96 spray-bath cubicles. The lockers are arranged in groups or sections which, as will be observed from the plan, ensures that miners in a particular locker-section bathe in the corresponding bath section, and in this way the arrangement should tend to reduce congestion. Access from a clean locker section to a pit locker section is obtained by means of a short dry corridor through the bath-house, and access from the pit locker section is obtained through the bath-house, there by ensuring the principle of separation.
Numerous improvements in the equipment have been made, of which the improved boot-cleaning machine and greasing apparatus call for particular attention. The boot-cleaning machine is operated by a press button control which enables the machine to be operated at will by any one desiring to use the machine instead of running continuously until shut off by the attendant.
The colliery company have provided, jointly with the workmen, in addition to the bridge, a spacious canteen with the necessary equipment, the total cost of these supplementary facilities being approximately £2,000, and both parties are to be congratulated upon the satisfactory linking up of the baths, canteen, and bridge in one complete design.
The steam is supplied from the colliery boiler augmented by an independent stand-by boiler capable of meeting the demands of the installation if necessary. Water for bathing is pumped by the colliery company to special storage from the company's reservoir. Bath and lavatory wastes are discharged into the public sewer.
The contract price for this scheme was £23,445, including £1,100 for the independent boiler. This gives a figure of rather less than £9 10s. as the cost per head, or under £9 excluding the boiler, thus illustrating the relative economy of the larger installations.