Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Welfare Previous Page Return to Index Next Page Welfare
/ Index \

Whitburn Colliery baths, Durham

The installation at this colliery is mainly on one floor, but the disposition of the entrances required a double storey arrangement at that point.

Owing to difficult levels and the congested arrangement of buildings at the pithead the colliery company were compelled to offer a site for the baths on the far side of the main road between Sunderland and South Shields. This necessitated the linking up of the colliery yard and the bath building by means of a bridge over the road, giving direct access at the same time to the railway platform where the majority of the workmen arrive and depart. The bridge takes the form of a covered way leading from the railway platform, bounding the colliery yard near the lamp-room, to the pit-entrance of the bath building.

These conditions presented an unusual problem in planning, and the building as designed permits men arriving by railway to enter the building from the bridge and descend to the clean-clothes locker-rooms by means of separate staircases. At the same time men after their day's work enter the building from the bridge in the boot-cleaning and lavatory section and continue by separate staircase to the pit-clothes locker room, passing thence from the bath section to the clean locker-rooms and returning by the first-mentioned staircases to the railway departure platform. Separate entrances for men living in the neighbourhood of the colliery or travelling by omnibus or bicycle are arranged on the ground floor and are conveniently linked up with the staircase halls.

The building provides accommodation for 2,488 men, i.e. 4,976 lockers, and the bath section contains 96 spray-bath cubicles. The lockers are arranged in groups or sections which, as will be observed from the plan, ensures that miners in a particular locker-section bathe in the corresponding bath section, and in this way the arrangement should tend to reduce congestion. Access from a clean locker section to a pit locker section is obtained by means of a short dry corridor through the bath-house, and access from the pit locker section is obtained through the bath-house, there by ensuring the principle of separation.

Numerous improvements in the equipment have been made, of which the improved boot-cleaning machine and greasing apparatus call for particular attention. The boot-cleaning machine is operated by a press button control which enables the machine to be operated at will by any one desiring to use the machine instead of running continuously until shut off by the attendant.

The colliery company have provided, jointly with the workmen, in addition to the bridge, a spacious canteen with the necessary equipment, the total cost of these supplementary facilities being approximately £2,000, and both parties are to be congratulated upon the satisfactory linking up of the baths, canteen, and bridge in one complete design.

The steam is supplied from the colliery boiler augmented by an independent stand-by boiler capable of meeting the demands of the installation if necessary. Water for bathing is pumped by the colliery company to special storage from the company's reservoir. Bath and lavatory wastes are discharged into the public sewer.

The contract price for this scheme was £23,445, including £1,100 for the independent boiler. This gives a figure of rather less than £9 10s. as the cost per head, or under £9 excluding the boiler, thus illustrating the relative economy of the larger installations.

Prev Page Return to Top of Page Next Page

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z