The installation at this colliery is arranged on two floors. This relatively unusual planning was necessary on account of the only site available being restricted and otherwise difficult.
Owing to a steep fall on the site from front to rear the plan adopted affords a basement storey at the back of the building under the bath-house. Advantage of this peculiarity in the site has been taken by the colliery company in preparing it to receive the superstructure, and the extra space available in consequence will be utilised as colliery stores and workmen's cycle shed, the cost of which is being met by the company. The extreme south-west corner of the basement is used for housing the calorifiers and hot-water storage cylinders.
An examination of the plans will show that the whole of the equipment for cleaning and greasing boots, the drinking-water supply, the attendants' room, first-aid room, and lavatory accommodation have been arranged at ground-floor level. The locker accommodation and bath-cubicle provision is identical on both floors, half the total being provided on each. It is, however, the intention of the baths management committee to allocate the lockers so as to accommodate the older men on the ground floor and the younger men on the first floor. Accommodation is provided for 952 men with So bath cubicles.
The water supply for bathing is pumped from a near-by stream, and for drinking purposes the public supply will be used. Steam for heating and raising hot water is supplied by the colliery company. The soil waste from the lavatories is connected to the public sewer, bath waste and rain-water entering the colliery sewer before outfall to the sea.
The contract price for this scheme was £12,500, giving a figure of approximately £13 6s. as the cost per head, the necessity for two floors, being mainly the reason for the excess over the average.
It is expected that the building will be completed and ready for use in March, 1930.