|
Swimming BathsThe plans and illustrations of four swimming bath schemes which have been dealt with in the past two years indicate how modern ideas on this subject can be adapted in various ways according to the amount of money available. A booklet was recently issued by the Ministry of Health urging that, for the sake of ensuring cleanliness and freedom from risk of infection, special attention should be paid in the design of swimming baths to two features — the provision of shower-baths through which bathers must pass after undressing before proceeding to the swimming pool, all persons other than bathers being excluded from the pool surround, and the provision of adequate plant for filtering, aerating and chlorinating the water at frequent intervals. These features, and particularly the first, have engaged the earnest consideration of the Miners' Welfare Committee for some years past, and a typical plan showing how they could be economically introduced was reproduced in the booklet issued at the end of 1927 on the work of the Fund. The four baths now illustrated are those at Buckley in North Wales, Scisset in West Yorkshire, Coalville in Leicestershire and Ashington in Northumberland. The first three of these are completed and in use, while the last is about to be commenced. The Buckley and Coalville schemes have been handed over for management and administration to the local urban district councils, while the other two are to remain in the hands of the local welfare committees. The cost of the Buckley scheme was £5,500, of the Scisset scheme £7,500 (including £200 for land) and of the Coalville scheme £19,000. The Ashington scheme is estimated to cost about £12,000. The Buckley scheme was opened in June, 1928, Scisset in May, 1929, and Coalville in June, 1929. In each case the work has been or is being carried out by a local firm of architects acting in close consultation with the central advisory staff. A progressive approach to ideal conditions has been necessitated by the variation in the amount of money available, the sums allocated for the Buckley and Scisset schemes being insufficient for the complete development of the shower-bath ablution room. At Buckley the ablution room could not be separated at all, but one shower is provided at the end of the dressing-boxes on either side of the swimming-pool, and the attendant is responsible for seeing that no bather enters the pool without first using the shower. At Scisset there is a compartment on either side of the pool with a large footbath and two showers in it, and the dressing-boxes are so placed that it is not possible to enter the pool without first passing through one of these compartments. At Ashington and Coalville the idea is completely developed, the archways leading from the shower-bath rooms being clearly visible in the Coalville illustration, and the general system of planning being indicated in the Ashington plan. In none of the cases is it possible for spectators to reach the floor round the pool. They are confined to the gallery, which is at the end in the case of Buckley and Coalville, and at the side in the case of Ashington and Scisset. There is ample hall accommodation already existing in Ashington, and it is therefore not proposed to use the bath as a hall in the winter months. At Coalville, on the other hand, full provision has been made for this adaptation, the dressing-box corridors being so arranged that when the building is used as a hail they are available as large ante-rooms. The room used for storing chairs in the summer is a refreshment room in the winter, and the lavatories are so disposed as to be suitable for the requirements of either a bath or a public hall. The Scisset scheme is similarly planned, but the money available was insufficient for the provision of the floor required for the conversion; this would cost another £500. There is, however, a small hall over the entrance lobby and slipper-baths. The funds available at Buckley were not sufficient to enable provision to be made for any form of conversion. The swimming-pool itself measures 75 feet by 30 feet in each case except Coalville, where it is feet wider. At Buckley there is raised seating in tiers at the shallow end, 20 dressing-boxes and one shower-bath on each side, and diving platforms at the deep end. There are also six slipper-baths. In the entrance vestibule are two pay-boxes, one being equipped with a chute through which soiled towels are sent to the laundry beneath, which has a coal-fired copper, a mangle and a drying room. There are five lavatories, some in the bath-section and some at the entrance. The filtration plant enables the whole of the water to be filtered, aerated and chlorinated in 16 hours about three times a week. The amount of water needed to make up wastage and keep the slipper-baths going is approximately 1,500 gallons per week. The water in the pool is kept at a temperature of 760 F. The architect was Mr. F. A. Roberts of Mold. In the Scisset scheme, galleries run the whole length of the swimming-pool section over the dressing-boxes. Drawings and Photographs accompanying the article
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||