|
West Pelton Institute (Durham)The building illustrated is erected on a half-acre site held on lease. The allocation from the Fund was £4,600, of which £3,500 has been spent on the building itself, and £500 on a concrete raft designed to minimise the risk of damage from subsidence, the balance of £600 being available for furniture. The erection was carried out by the Alnwick Construction and Engineering Co. to plans and specifications drawn up by the central Advisory Branch. It was finished recently, but is not yet opened. The building contains on the ground floor a hall to seat 300 persons, with a stage and two dressing rooms complete with lavatory accommodation; also a large reading room, secretary’s office, caretaker’s room and kitchen, two committee rooms and lavatory accommodation for both sexes. On the first floor is an attractive billiards room with two tables, and a games room. It is proposed in the future to purchase an adjoining piece of ground for the development of outdoor activities. Drawings and Photographs accompanying the article
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||