Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Part 1

Aberfan and its Tips (cont.)

3. The Method of Tipping on Tip 7

29. The method of tipping employed in connection with Tip 7 was somewhat obsolescent; evidence was given that it was still in use at only two or three other collieries in South Wales in 1966. The rubbish from the pit, whether it came direct from the mineshaft or from the coal preparation plant or from the boilerhouse, was loaded into trains at the surface of the mine. When enough trains were filled to form a "journey" or train they were hauled by ropes by means of a series of stationary engines along a track which climbed up the side of Merthyr Mountain. When the journey reached the engine-house at the top of the incline it was halted and then the trains were allowed to run by gravity (being braked by a rope) to a junction — or "parting" — and thence to a place near the point of the working tip where the crane stood on its own short length of railway track. This crane was used to lift the full tram into the air, to turn it upside down and empty out the contents so that they fell down the front or sides of the tip according to the position of the crane jib. This done, the crane then landed the empty tram on a metal plate, from which it was directed on to another set of rails leading back to the parting. These operations were carried out by a crane-driver and a gang of slingers whose work consisted in attaching and detaching the chains of the crane, all under the general control of a chargehand. Before the tipping gang left the tip each night, it was their custom to bring the crane back from its working position at the front edge of the tip to a point as far back as the short length of railway track permitted.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z