Part 1 Aberfan and its Tips (cont.) 3. The Method of Tipping on Tip 7 29. The method of tipping employed in connection with Tip 7 was somewhat obsolescent; evidence was given that it was still in use at only two or three other collieries in South Wales in 1966. The rubbish from the pit, whether it came direct from the mineshaft or from the coal preparation plant or from the boilerhouse, was loaded into trains at the surface of the mine. When enough trains were filled to form a "journey" or train they were hauled by ropes by means of a series of stationary engines along a track which climbed up the side of Merthyr Mountain. When the journey reached the engine-house at the top of the incline it was halted and then the trains were allowed to run by gravity (being braked by a rope) to a junction — or "parting" — and thence to a place near the point of the working tip where the crane stood on its own short length of railway track. This crane was used to lift the full tram into the air, to turn it upside down and empty out the contents so that they fell down the front or sides of the tip according to the position of the crane jib. This done, the crane then landed the empty tram on a metal plate, from which it was directed on to another set of rails leading back to the parting. These operations were carried out by a crane-driver and a gang of slingers whose work consisted in attaching and detaching the chains of the crane, all under the general control of a chargehand. Before the tipping gang left the tip each night, it was their custom to bring the crane back from its working position at the front edge of the tip to a point as far back as the short length of railway track permitted.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||