Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

Method Of Working.

The Upcast District of the Shallow Seam is shown on Plan 1. It is reached by two undulating roads leading from the shafts at a depth of 310 yards from the surface and reaching the seam at a point about 1,400 yards from the shafts. Of these roads the main haulage road is also the main return airway and travelling road.

The seam was opened up originally with narrow headings, and it was intended to work it by retreating longwall faces, but after the headings had been driven about 130 yards from the main roads, roof troubles caused the retreating system to be abandoned, and the seam was developed by hand-got advancing faces. The faces are supported by six-yard packs which are built of material got from the ripping, there being wastes from six to eight yards in width between the packs. The packing material consists of the Black Bass and the rock above the seam, occasionally as much as four feet of the rock being blown down to produce packing material.

The seam being liable to spontaneous heating, it was decided to remove the pillars formed when driving the narrow headings; the removal of these pillars has had a very adverse effect on the roadways in the district.

The district has been developed to the East and West of the two main roads from the shaft. The area to the West was not affected by the explosion and need not be further referred to; that to the East was reached by two main levels — No. 328's and 340's, which were driven slightly to the rise with gateroads turned off them. (See Plan 2.)

The length of face on the North side of this area between 377's stall and 360's level, was not being worked at the time of the explosion.

The face haulage was operated by compressed air and a winch was installed at the face in 328's level for hauling the empty tubs to the face and lowering the full ones outbye.

Signalling on this level was by electric bell with bare iron wire conductors, the current for the bell being produced by a battery of three-pint porous pot Leclanche cells.

No electrical power was employed in the area affected by the explosion.

On an average 40 shots per 24 hours were fired in the Eastern half of the district, for coal getting and ripping.

The district was ventilated by a single air current which entered at its Western end, and, after coursing round the faces, passed into the main return airway at the foot of 340's level. (See Plan 1.) A measurement taken on the 5th May last showed that 2,835 cubic feet of air per minute were entering the district at a point 100 yards outbye of the first working place.

A small fan, a Typhoon Blower, driven by compressed air, was installed near the face in 360's level to drive air into the extreme rise corner of the face; this fan was running at the time of the explosion.

 

Prev Page Return to Top of Page Next Page


mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z