Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
Index

General.

The No. 1 North District in which the explosion occurred was situated about 2,200 yards from the shafts and consisted of a longwall face, known as No. 6's face, about 60 yards long, with one road (the "intake") by which the ventilation, some 3,700 cubic feet per minute, entered, and another by which it left (the "return") — see Plan.

The coal being worked consisted of the top leaf (known as the Two Yard Seam, about 5 feet thick) of the Warwickshire Thick Coal.

This Two Yard Seam, which is underlaid by a stratum of fireclay 6 inches thick, was undercut by means of an electrically driven chain coal cutting machine.

The coal as got was loaded on to a shaker conveyor which delivered into a mechanical tub loader placed in the intake road.

The shaker conveyor was driven by an electric motor placed at the top end of the face just beyond the entrance to the return road.

There was a gentle rise, about 1 in 20, along the face from the intake to the return.

Lighting. — The workmen used Oldham electric safety lamps and Hailwood combustion tube flame safety lamps in the proportion of four to, one. Hailwood lamps were also used by the Officials.

Shotfiring. — Shots, when required, were fired by the deputies or duly qualified and properly appointed shotfirers.

Stonedusting. — "Pixie Powder" was used for dusting the roof, floor and sides. Samples taken of the dust in the intake, thirty to forty yards from the face on 22nd July, 1931, gave the following percentage content of combustible matter Roof 28.66; Floor 25.66.

Supervision. — Mr. D. S. Newey and Mr. Arthur Pugh were the Manager and Undermanager of the mine respectively, and Mr. J. L. Smith, who holds a First Class Certificate of Competency, acted as Assistant to Mr. Newey. At the time of the explosion, Mr. Newey was on holiday but he returned to the Colliery as quickly as possible and made inspection underground during the evening of the day of the accident. Mr. Smith was acting as Manager in Mr. Newey's absence.

In the No. 1 North District there were three shifts of deputies and three shifts of men and the district Was visited by an overman during each shift.

 

Prev Page Return to Top of Page Next Page


A copy of this report was kindly donated by
West Cumbria Mines Research.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.
Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z