V. Subsequent Operations And Recovery Of The Bodies.
Five bodies remained in the affected area when the intake and return dips were sealed off.
The stoppings which had been commenced at 10.45 a.m. on Saturday morning, the day after the explosion, were completed by 2 p.m., the conditions for the work being extremely favourable except in the return airway where there was delay for a short time on account of thick smoke. As soon as this had been partially cleared away by short circuiting the air current at the separation doors between intake and return, men wearing rescue apparatus were able to get to work and soon erected a temporary stopping sufficiently adequate to allow other men without apparatus to complete the stopping.
All persons were then withdrawn from the mine and it was decided not to approach the stoppings for a period of 30 hours.
In accordance with this arrangement, an inspection of the stoppings was made at 8 o'clock on Sunday evening when they were found undisturbed, and there was only a slight smell of burning timber at the return dip stopping. The stoppings in the West level and air heading beyond the "Dirt Jig" (see Plates 1 and 2) were also inspected and found to be in satisfactory condition.
Arrangements were then made for strengthening the dip stoppings, the intake one with brickwork and the return one with sand packing.
Another inspection was made on Monday morning when it was agreed that the mine was safe for the re-admission of workmen. The report required by the General Regulations of the 30th July, 1920, Nos. 9 (i) and (ii), was posted and coal drawing was resumed on Tuesday morning.
In the meantime plans had been set on foot for exploring the explosion area and recovering the bodies. For the purpose of this report it will suffice to mention that these operations were commenced on 4th January, 1926, by three of the colliery rescue brigades working inside an airlock. This was first installed in the West level between the tops of the intake and return dips, and later advanced to the air heading which was originally the return from Kelsall's dip. The operations were completed on 1st April, 1926.
The recovery work to be performed was probably more hazardous and arduous than any previously recorded in the annals of mining in this country, but it was carried through persistently and methodically in the face of great difficulties without a hitch or accident of any description.
To enter into the great detail necessary to do justice to the subject of these recovery operations is beyond the scope of this report. But it is most desirable that the facts should be made fully known to the coal mining industry, and I venture to hope that in the near future they will be published in the form of a paper read before one of the Institutions of Mining Engineers.
The greatest credit is due to all the members of the brigades who took part in the operations and I am glad to have this opportunity of paying tribute to them. At the same time I feel sure that they will agree with me that great credit is also due to the Agent, Mr. Allott, and his staff of officials, whose careful organisation, clear plans of procedure and keen and ceaseless supervision inspired confidence and made success possible.
A copy of this report was kindly donated by
West Cumbria Mines Research.