Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

  Disasters - Names Return to Index Disasters - Names  
Date:  15th December 1864
Colliery:  Leeswood Main
Company:  Craig, Taylor, and Craig
Cause:  An irruption of water
Lives Lost:  8
Category:  

Description

Accident No. 85

On the 15th of December an influx of water caused the death of eight persons in the main coal seam of the Leeswood Main Colliery, near Mold, belonging to Messrs. Craig, Taylor, and Craig. The workings in which this casualty occurred are about 30 yards in perpendicular depth below the level of the bottom of the shaft and are approached from that point by a down brow or engine plane towards the south. The goaf from which the water issued was made by the present proprietors, very recently, and was known to be full of water. It extended alongside of the present workings for some distance, from which it was separated by a barrier of an unworked portion of the mine, and a small fault or throw which breaks the continuity of the mine (which is nine feet thick) about seven feet and a half. The plan of the colliery, on which all their underground operations were supposed to be shown, had been prepared by a competent person, but from circumstances then existing one portion of the plan only was prepared from actual survey, the remainder being made up from information supplied by a previous underlooker. This plan, a copy of which I have annexed, shows the fault to be nearer the old workings by many yards than where it has now been proved to exist.

It was stated in evidence at the inquest that when the recent working touched the fault, those in charge of the management of the mine thought there were two faults in their front, which, had that been so, would have been quite sufficient to hold back the water. It appears, however, to have been cut and explorations carried very much beyond it, relying, as it was stated, on there being a second fault for protection until the leading working places were, according to their own plan, within a few yards of the goaf) without boring in advance and on each side thereof. As it was known that the fault had been bared on the side next to the goaf, it would not have effectually held back the water as the thickness of the mine exceeded the break or throw of the fault, consequently boreholes should have been made pursuant to the provisions of the 15th General Rule of the Act for the Regulation of Mines as the workings gradually advance in that direction.

There were other unmistakeable indications also of irregular, I may say bad management below ground sufficient to convince one that the manager had not paid proper attention to his business, nor to the safety of the workpeople ; there are, however, two circumstances connected with this deplorable event, which, in some degree relieve him of the full weight of this heavy charge. His own son, who was working in one of the most remote places, was only saved by making his way through the water, and he himself had frequently been through the working a very short time before.

After a long inquiry the jury returned a verdict of manslaughter against the three partners, Messrs. Craig, Taylor, and Craig, and this indictment will have to be heard at the approaching assizes at Mold. The plan No. 1. is a copy of so much of the plan of the colliery workings up to the time of the casualty, as I find necessary to explain this matter. The plan No. 2. has been prepared from an actual survey which has been made since the water broke in.

Source: 1864 Mines Inspectors Report, by Peter Higson, H.M. Inspector of Mines, Page: 54


Fatalities



Individual page Ellis, Thomas, aged 15, Driver, An irruption of water
Individual page Jones, John, aged 19, Collier, An irruption of water
Individual page Jones, John, aged 23, Collier, An irruption of water
Individual page Jones, Owen, aged 10, Water fitter, An irruption of water
Individual page Jones, William, aged 23, Collier, An irruption of water
Individual page Lloyd, Lewis, aged 47, Daywageman, An irruption of water
Individual page Roberts, John, aged 23, Collier, An irruption of water
Individual page Smith, John, aged 22, Collier, An irruption of water
 
All names found
 
Youngest: 10 years old ; Oldest: 47 ; Average: 23
 

Those names marked with image, have a web page providing individual details of the accident, the page may also include a photograph of the deceased. Click on the image symbol next to the name to see the web page.


Memorial: 1864 Leeswood Main Colliery Disaster

Memorial Image


Newspaper Articles


27 Jan 1865  Verdict Of Manslaughter Against Colliery Proprietors (Newcastle Courant)

 

Return Return   Return to Top Return to Top

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 30 Apr 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print