Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

I.M.E. Previous Return to Index Next I.M.E.
/   \

Volume 15 (XV), 1897-1898, published 1898

Shipment of coal

by H. Richardson

(1) An improved coal-shipping drop now in use by the Tyne Improvement Commissioners for the shipment of Backworth and West Cramlington coals at their No. 4 staithe, Whitehill Point, on the river Tyne, was designed to remedy the difficulty found at other coal-drops in holding ships in position by warps, particularly where loading in rivers or tidal basins, and in adapting the drop system to lofty staithes.

In this drop (Fig. 1, Plate IV.) the waggons may be lowered from almost any height from the staithe-head or railway-level to the ship's deck, or into the hold, upon a cradle A by means of a steep incline B, worked by a counter-balance weight C. F is the main drum and brake-sheave, and G is the balance-pulley. The incline B may be moved, by the two levers D, D, which are worked by a windlass E, out or in from the staithe to suit the position of the hatchway, so that a vessel loading may in all cases be moored alongside the staithe or quay. When not in use, the incline B may be drawn out of the way within the front timbers of the staithe, and the ordinary spouts may be substituted for the shipment of unscreened or small coals. The movable external spout is not shown in the plan.

(2) The drop system of shipment is not suitable for waggons of more than 4 tons carrying capacity. For larger waggons, a crane worked by steam or water-power is better adapted, and the effect of these two methods is identical. Most modern steamers are fitted with hatchways and loose cross beams which will admit of 10½ tons trucks being lowered into the hold, for the prevention of coal-breakage. After a cone of sufficient size has been formed on the bottom of the ship, the strengthening beams across the hatchway can be replaced and the loading completed.

Figs. 2 and 3 (Plate IV.) represent the steam-crane system, with 10½ tons trucks. It will be seen that a staithe is not required, and the trucks are moved to and from the crane cradle by means of capstans and light hempen ropes. The sketches show a coal-shipping crane as used at Ayr, but North-eastern Railway waggons are shown in course of coal-shipment. The waggons used at Ayr are fitted with end-doors, and are different in other respects from those represented in Figs. 2 and 3 (Plate IV.).

About 150 tons of coal an hour may be shipped by the improved drop, and 200 tons an hour by the crane.

Prev Page Return to Top of Page Next Page

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print