Blenkinsop Colliery
Engine Pit
Section of Strata sunk through in the Engine Pit, Blenkinsopp Colliery, commenced January 10th, 1848
Shaft Details
Sunk: 10 Jan 1848
Switch to measurements in:
feet & inches, or fathoms, feet & inches


 
|


 

 

 
|


























|

|
| Geology encountered |
Thickness |
|
Depth |
| |
m. |
|
m. |
| Soil |
0.30 |
|
0.30 |
| Sand |
0.76 |
|
1.07 |
| Gravel and sand, with water |
6.86 |
|
7.92 |
| Quicksand, with water |
1.14 |
|
9.07 |
| Blue metal |
0.46 |
|
9.52 |
| Brown and white post |
1.14 |
|
10.67 |
| Blue metal |
0.36 |
|
11.02 |
| Strong brown post |
1.83 |
|
12.85 |
| Grey metal |
0.13 |
|
12.98 |
| Strong grey post |
0.46 |
|
13.44 |
| White and brown post, with water |
1.22 |
|
14.66 |
| Grey metal, with post girdles |
0.61 |
|
15.26 |
| COAL |
0.03 |
|
15.29 |
| Brown post, with metal partings |
5.33 |
|
20.62 |
| Blue metal |
1.73 |
|
22.35 |
| White and brown post, with water |
12.50 |
|
34.85 |
| Grey metal |
1.07 |
|
35.91 |
| Blue metal |
4.50 |
|
40.41 |
| White post, with water |
10.21 |
|
50.62 |
| Blue metal |
6.93 |
|
57.55 |
| Bastard limestone |
0.23 |
|
57.78 |
| White post, with water |
5.33 |
|
63.12 |
| Blue metal |
0.15 |
|
63.27 |
| White post, with water |
6.78 |
|
70.05 |
| Grey post, with metal partings |
3.15 |
|
73.20 |
| Blue metal |
3.66 |
|
76.86 |
| Little Limestone |
18.03 |
|
94.89 |
| Limestone girdle |
0.36 |
|
|
| Blue metal |
2.90 |
|
|
| Limestone |
14.78 |
|
|
| COAL |
1.85 |
|
96.74 |
|
Source: An Account of the strata of Northumberland & Durham as proved by Borings & Sinkings, Volume A-B, published by the North of England Institute of Mining & Mechanical Engineers, 1878
original entry for sinking/boring number 0249 in "An Account of the strata of Northumberland & Durham as proved by Borings & Sinkings, Volume A-B, published by the North of England Institute of Mining & Mechanical Engineers, 1878"
main page for Blenkinsop Colliery