|
50 (L) — 1939-1940Tars, Hydrogenation-Cracking, 140. Temporary Props, 113. Thermal Precipitator, 185. Timber Preservation, 30, 157. Timber Saving, 260. Timber Stored Underground, 155. Timbering in Anthracite Mines, 83. Timbering, Purpose of, 5, 41. Timbering, Systematic, 77, 113. Toadstones, 240. Training Boys, 5, 236. Training Staffs, 131. Trams, Colliery, 57. Transformers, 132, 200. Tromp Bath, 194. Tub Couplings, 281. Tub Rerailer, 303. Tubbing, Shaft, 362. Tunnels Connecting Seams, 262. Tunnels in Faulted Measures, 294. Turbine Pump, 323. |
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 24 Oct 2017
|
Search |
|
|||