Face Conveyors, 271.
Face Haulage, 287.
Face Lighting Problem, 229, 261.
Faces, Gas Problem on, 212.
Factors Governing Methods, 127.
Factors Governing Subsidence, 110.
Factors, Coal Trade, 219.
Falls and Ventilation, 319.
Falls of Ground, 40, 49, 74.
Falls, Two Years without, 178.
Fan Engine, 365.
Fan, Sirocco, 333.
Fatality, Coal Won without, 121.
Faults, Tunnels Through, 230.
Feed Water, 128, 143, 337.
Firedamp Detectors, 132, 232, 360.
Firedamp Discharge from Coal, 3.
Firedamp Explosions, 36.
Firedamp Ignition, Electric Lamps and, 231.
Firedamp Recorder, 68.
Firedamp Test, 60.
Firedamp, Composition, 44.
Firedamp, Dealing with, 317.
Fireman's Inspections, 28.
Fires Underground, 228, 411.
Fires, Open, 101.
Flameproof Certification Mark, 217.
Flameproof Electrical Apparatus, 20, 34, 55, 117, 133, 250.
Float-and-Sink Analysis, 9.
Flotation Process, 170.
Fossils and Seam Correlation, 281.
Friability of Coal, 69.
Fuel Consumption Conditions, 264.
Fuel Problem, 152.
Fuel Research Report, 170.
Fushun, Mining at, 135.