Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
/   \

On July 4th pumping was commenced to unwater the mine by means of a pump worked by compressed air. The remaining bodies were recovered on the dates given on the list, and the water was completely pumped out on the 21st September 1888. Nineteen horses employed in the Main seam were all in the stable at the time of the explosion ; 12 were killed and seven survived, although they were not fed between the 19th and 30th April. The four workmen who were in the upper seam at the time of the explosion were drawn to the surface by the downcast shaft shortly after the explosion.

An examination of the mine for some months after the explosion and during the coroners' inquiries was only possible as far as the edge of the water. The effect of the explosion in this area was not severe, and was principally limited to the blowing down of ventilating appliances. The direction of the explosion was up the engine dip to the downcast shaft, and flame extended to the latter point. The return air passes under the engine dip by an undercast air crossing. This crossing was not disturbed. The other three crossings near the shaft were overcasts of brick arching. They were all blown up from underneath; the doors on each side of the engine dip above the water were blown from it and much shattered. All the regulators were blown out. Some of the doors in the incline, North brow and. Ten Quarters, and shaft level districts were blown down. The separation doors were blown to the upcast. One or two stoppings were blown partly down. The flooring of the compressed air engine house was lifted, and some timber near it was blown down. Tubs near the shaft and at the top of the incline were thrown together, but not broken. No falls of roof were caused by the explosion in this area. There was no disturbance at the face of any of the districts that could be examined.

The obvious indications of the passage of flame was limited to the burning of men and to some smouldering fire near the shaft observed by James Morrison, the overman. No coked coal dust was seen in this area.

In the portion of the mine that had been inundated, or rendered inaccessible by the inundation, and starting at the origin of the explosion, plan 2 gives some of the details. When first reached water had collected at the face of both Hogg's and Gilmour's brows, and in the levels to the right of Gilmour's brow, but had not extended back to the last thirl. Evident coking of the coal sides and roof by the fire is shown on the plan by red lines. The fire had raged with greatest vigour in the last thirl F, where large masses of spongy coke lay heaped up on the floor. It had not extended into Gilmour's brow at any point. The props set in Hogg's brow beyond the last thirl to support the canvass brattice were all standing and nearly burnt through at the top. There were some indications of fire having extended outbye in Hogg's brow beyond where the coal was evidently coked. Slighter indications of coking were observed, and at the point. G, timber supporting canvass brattice and the brattice itself were charred; but whether this had been due to the explosion or to an extension of the fire before or after the explosion could not be determined. Fire-damp was found in the workings of Hogg's and Gilmour's brows when first reached after the explosion. When the last thirl in Hogg's brow was reached gas was heard bubbling through the water in it, and when the brattice was restored to within a few feet of the face a cap of ½ inch was observed on the lamp, and gas could be heard issuing through water still remaining close to the face. The air current was, however, less than before the explosion, owing to falls and water restricting the area of the return through the nip out.

The passages in Hogg's and Gilmour's brows, above where the water flooding the mine had risen to (although this point could not be exactly determined except by the dryness of the upper parts of the brows), and the wet workings next the face, were dry and dusty, and a considerable quantity of fine coal dust, evidently raised at the time of the explosion, was found deposited on timber, tubs, brattice cloth, &c. This dust was apparently purer coal dust and less stony in character than that on other horse roads in the mine. The brick stopping at A was blown down towards the face, and three props on its outbye side, evidently set with a view of strengthening it against pressure on its inbye side, were with bricks composing the stopping carried some yards in the direction of the face, and bricks remaining in the stopping at the side were twisted inwards. The passage at the point where the stopping A had been built was 8½ feet wide by 6 feet high. A recess on each side extended 18 inches into the sides. The stopping in the third thirl from the face at B had been removed before the explosion, and the least area in this thirl after the explosion was 23½ square feet. At C, in Gilmour's brow, it had been proposed to erect a second brick stopping, but nothing had been done here beyond cutting recesses in the sides. At E, in Hogg's brow, where a stopping had been attempted, the rails were found to have been removed, but nothing further appears to have been done. There was a fall of roof stone at the junction of the last thirl and Gilmour's brow. There were no other falls of roof above the point the water had risen to in Hogg's and Gilmour's brows, but below this point there were several heavy falls, which may have occurred at the time of the explosion, or been due to the disintegrating action of the water. The bottom of the brows was reached on 21st September 1888, but owing to these falls the last thirl was not reached until 13th November 1888, and the face of Hogg's brow until the 15th December, after the removal of the water that had collected in it. Near the face of Hogg's and Gilmour's brows the timber supporting the roof was not displaced. Passing outbye from the point of origin of the explosion, where, with the exception of the stopping at A having been blown down with considerable force, little damage was done, the destructive energy of the explosion had increased, and more particularly in the lower parts of Gilmour's brow and the engine dip, much force had been exerted. Tubs were broken up, timber displaced, and doors smashed to pieces. It rather appeared that Hogg's brow had not been traversed by an explosion near the face, and there were indications lower down of force having passed upwards. Some of the stoppings built of cannel between Hogg's and Gilmour's brows were blown down or partly down, but it was difficult to say in which direction they had been forced. The brick arch air crossing near the stoppings S1 and S3 was blown up from underneath, and bricks thrown into the return air way on each side. From this air crossing to the upcast shaft by the return air way no explosion had passed. At the upcast shaft light fencing at two points was undisturbed. No explosion appears to have passed along the return air way through the nip out. The regulating doors in this passage were blown down, but from the appearance of timbering no explosion had traversed it, and the opinion of Mr. Johnson, the manager, that the bodies of the men found in the return between the air crossing and the nip out were not burned strengthens this view, as it is not improbable that these men were at the time of the explosion in the return in the nip out, selecting or preparing a place for a brick stopping. Coked coal dust was observed on the coal sides of the entrances to two bords in the end in Hogg's brow above the return air way. This coked coal dust was deposited in the direction contrary to that of the explosion. The wood and canvass stoppings at S1, S2, and S3, were entirely blown down, the recesses cut in the sides could be seen, and at S3, one prop out of three, said to have been set, was left standing. The doors 1, 2, 3, 4, 5, 6, and 7 were all blown down.

As the stopping at A in Gilmour's brow (commenced about 10.30 a.m. and finished at 2 p.m.) approached completion, the air passing the point would be reduced in quantity owing to the closing of the passage. Some increase in the quantity of air during the building of the stopping would take place on the regulators in the other districts being nearly closed by James Morrison about 12.30 p.m. When the stopping in Gilmour's brow was finished the air current past it would be entirely stopped. On the stopping at B in the third thirl from the face being removed, about the time the stopping in Gilmour's brow was closed, the air would traverse this passage, and then pass by the ordinary route to the return air way, and, providing the area of the road through the third thirl was not contracted, as from examination it did not appear to be, more air than the normal quantity would circulate. This would continue up to 4 p.m., when the doors 1, 2, and 3, at the foot of' Hogg's brow were opened by Mr. Davison. After these doors were opened a portion of the air, depending on conditions already mentioned, would pass direct from the engine dip up Hogg's brow, or through the workings adjacent, to the return. The remainder, and probably the larger portion would pass through the third thin from the face. This condition of things would continue from 4 p.m. until the measures adopted for reversing the air approached completion. The stopping at S2 as before stated does not appear to have been essential to the proposed change, and need not be considered further. The stoppings at S1 and S3 may have been built in such manner that until near the final closing the current of air would not be materially affected. If the stopping at S3 had been built, other conditions remaining the same, the circulation of air would have been checked in the district where the fire was burning and in the district to the west of the shaft level, and increased in the other districts. If the stopping at S1 had been built, other conditions remaining the same, the circulation of air would also have been checked in the district of the fire, and in the district to the right or west of the engine dip instead of in the district to the west of the shaft level, the air in the other districts being as before increased. A reduction of the area by the building of the stoppings would have a corresponding effect in reducing the air in the districts in question.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print