Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
/   \

APPENDIX II

SUMMARY REPORT ON THE MASTER CONTROL UNIT AND CABLE ADAPTOR BOX OF JOY LOADER (TYPE 12 B.U.) RECEIVED FROM EPPLETON COLLIERY, DURHAM, BY MR. J. HAIG, CHIEF EXPERIMENTAL OFFICER, SAFETY iN MINES RESEARCH ESTABLISHMENT, BUXTON.

The Joy loader master control unit and associated adaptor box for mounting the trailing cable plug and socket connector were assembled in the condition in which they were reported to be found after the explosion and then examined as to flameproofness. The following defects were found: (a) three main cover screws missing; (b) a gap of 0.042 inch at one point of the control cover flange joint; and (c) the adaptor box with provision for flange and spigot mounting was pulled away from the control unit and the four fixing screws were missing, two having been broken in the holes. The separation of the two components, which were held together by a wrought iron strap, was such that the spigot of the adaptor was removed from the hole in the control unit, leaving a crescent shaped opening, 0.625 inch across at its maximum, into the control housing.

A lot of coal dust was found inside the control unit and, in addition, about two dozen small pieces of coal, the largest being approximately 0.375 inch by 0.5 inch by 0.875 inch, were picked out.

The control unit was then subjected to the following tests. The assembly was placed in an explosion chamber which was filled with an approximately 8 per cent. methane! air mixture; the control box was then filled with varying mixtures of methane/air for successive tests. With the mixture within the control box ignited by means of an electric spark arranged adjacent to the traction motors switch contacts, ignition of the external mixture was obtained when the internal mixtures contained between 5 per cent. and 7 per cent, methane.

With internal ignition adjacent to the light switch contacts, external ignition was obtained when the internal mixture contained between 5 per cent. and 9 per cent. methane.

Further experiments were made to determine the time taken for an ignitible mixture to accumulate within the control unit housing in a quiescent gaseous atmosphere, i.e. by diffusion.

The assembly was placed in the explosion chamber into which methane was passed at the rate of approximately 1 cubic foot per minute. With the initiating spark adjacent to the light switch contacts, internal and external ignition occurred after 8 minutes in the first trial and after 13 minutes in the second. With the spark at the traction motors switch contacts, internal ignition was obtained after 16 minutes but no external ignition occurred.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print