Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Disaster Report Text
Disaster Report Name Index
UK Disaster Report Text
UK Disaster Report Name Index
Inquest Texts
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Reports Prev Page Return to Index Next Page Reports
/   \

Description Of The Colliery.

The Harvey Seam exists at a depth of 636 feet from the surface at the shafts, and the workings in this seam are very extensive. There are two coal-drawing shafts, both of which are sunk to the Brockwell Seam at a depth of 900 feet from the surface. In addition to the Brockwell Seam, the Busty, Harvey and Low Main Seams are worked, the total output being about 1,200 tons a day, nearly half of which is obtained from the Harvey Seam, the thickness of which at the shafts is three feet five inches.

System Of Ventilation.

The ventilation was induced by means of a "Waddle" fan situated near the top of the upcast pit, and the last measurement prior to the explosion showed it was exhausting 52,450 cubic feet per minute from the Harvey Seam at a pressure of 1.7 inches water gauge. In addition to this a small portion of the Harvey Seam air current, amounting to 6,960 cubic feet per minute, was drawn to the Westerton "Sirocco" fan situate at the South Pit. The measurements of the air current in the Harvey Seam at the last measurement previous to the explosion were as follows

Measurement of Air.
Stables 5,600 cubic feet per minute.
West Side 2,615  ,,   ,,
Drift Way 6,700  ,,   ,,
3rd North 4,945  ,,   ,,
4th North 4,653  ,,   ,,
South Doors, right side 3,045  ,,   ,,
South Doors, left side 3,265  ,,   ,,
1st North 3,330  ,,   ,,
Old South Return 4,500  ,,   ,,
Leasingthorne 3,000  ,,   ,,
Scale at Old South 1,500  ,,   ,,
Total 43,175  ,,   ,,

Occurrence Of Firedamp.

Firedamp has been met with in every district in the Harvey Seam at some time or other, but not in such quantities as to create any difficulty in the ventilation. The most recent entry of "gas" in the report books showed that it had been detected on September 11th, 1912, in the Drift Way.

In the south or upcast pit, drawing of coal did not take place below the Harvey Seam; the Busty, Brockwell and Low Main Seams being worked from the north or downcast shaft. The Harvey Seam workings extend about 2½ miles towards the north-east, and about eight months previous to the explosion were holed through to Westerton Colliery belonging to the same firm. There was also a holing through to Leasingthorne Colliery, but its use as a travelling road had been discontinued although a small air current still passed through to Leasingthorne Colliery.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print