|
8th February 1945 Run Away Pit WaggonsBlocked Main Railway LineTwo boys engaged in unloading wagons of pit props at William Pit, Great Clifton, on Friday night had occasion to remove the wagons a little further down the yard, but they failed to stop them at the required point which as on a falling gradient. The wagons were soon out of control, and at a terrific speed they ran on to the Steer Line, which runs to the sidings adjoining the main L.M.S. Railway line. The gradient from the pit varied — anything from one in 20 to one in 100. Travelling at over a mile a minute they crashed into another wagon, already standing at the buffer stops. This wagon was badly damaged and was turned on its side and fouled the main down Penrith to Workington Line. A few minutes later the driver and fireman of the Workington to Penrith train, Messrs. W. Hamilton and G. Smith, observed the position, and took precautionary measures to prevent the almost due Penrith to Workington Passenger train from crashing into it. They reached Camerton Station with a few minutes to spare. The staff there informed the driver of the obstruction and some hours passed before the line was clear for the passenger train to proceed. Colliery and railway breakdown gangs worked in the black-out and on Saturday morning the Carlisle Steam crane gang was employed. The permanent way and the buffers, the property of the colliery company, were torn up. The wagons belonged to the railway company.
Newspaper transcript kindly provided by
|
|||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||