|
12th June 1943, Page: 293, Column: 2 Importance of Maintaining OutputContributing to the discussion on "Power Loading" before the Midland Counties Institution of Engineers Mr. N. D. Todd said the problems of power loading at the coal face could, and should, be solved, and that under normal conditions greater strides would have been made to solve these problems. It was very much to the credit of individual mining engineers, and to certain firms producing mining machinery, that the work had not been allowed to languish. A particular difficulty at present was to find the personnel to carry out the necessary underground operations without jeopardising output, and he thought that, generally, at the present time they should concentrate their efforts on producing as much coal as possible by the methods which were known to them.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||