|
9th January 1943, Page: 163, Column: 1 Recovery Of Seam By Staple ShaftsFrom paper on "The Recovery of the Arley Seam by means of Staple Shifts at the No. 7 Pit, Garswood Hall Collieries," presented at the November meeting of the Past and Present Mining Students' Association in the Wigan Mining and Technical College. Concluded from page 145. By James Carver, A.M.I.Min.E. The distance between the Ravine and Orrell Yard Seams is 28 yards ; we therefore decided to go up a distance of just over 20 yards, and whilst we were doing this we started away from the Ravine Mine with the same shaft to meet them coming up, when we were six yards down from the Ravine the two shafts met. On checking the centres of the shafts it was found that they corresponded to ½-inch, which was very good. The six yards which had been sunk down from the Ravine was now bricked up by means of girder scaffolds, and whilst this was being done the work of filling all the debris, stripping the shaft of 11-foot girders, lagging timber, etc., was done from the Orrell Yard Level. As the dirt was filled out the girders were relieved of pressure, the laggings were unnailed and thrown on top of the dirt, as were the 11-foot girders. These then went down the shaft as the dirt was filled out from the hole left at the bottom. When the shaft had been cleaned of dirt, girders, etc., right from the Orrell Yard to the Ravine, the bunker walls could now be knocked down and preparations made for sinking from the Orrell Yard down to the Arley. It will be seen from the diagram that the coal and dirt filled out from the development of the Arley Seam had to be brought past this pit, the tub road was laid on the side shown and a wooden fence erected. This tub road was laid on the frame which held the sinking doors in position. This tub road was laid on the frame which held the sinking doors in position. The arrangements for dealing with the sinking debris are as shown on the sketch. The sinking frame was placed on a 12-foot diameter 5" X 4½" circular ring which was sitting on sixteen iron plugs 2' X 6' long drilled around the shaft wall. The frame for the sinking rope pulley was again placed across the shaft at the Ravine Level. Good progress was now made with the sinking, but instead of using the 12-foot 5" x 4½" rings we used steel benk bars bolted together to form a circle as timber rings. Lagging boards were wedged right round the circumference of the ring. Every fifth timber ring was supported by plugs drilled both over and below the ring, so that there was no danger of the rings being disturbed by the shots, the other four rings were suspended from the hangers. The rate of the sinking averaged ten yards per week, so that every fourth week a concrete bricking crib was placed in the shaft and the 30 yards of brickwork put in in the fourth week. At the regulation distance of 100 yards the rider and rider guides were again installed. The centring device used was: The straight girders which formed the square of the shaft were drilled to receive a light framework of angle iron. At the correct position a small pulley was bolted to the frame, and when the frame was bolted to the girders the steel wire line when suspended over the pulley was the centre of the shaft. A staff was used by the chargeman sinker to see that he did not blow too much or too little ground out. As it was only a few minutes' work to drop the centre line, it was done for every round of side holes, thus ensuring a neat job. A steady progress of a completed 30-yard section per month was obtained, i.e., three weeks' sinking and one week's bricking. The winding engine rope was used to raise and lower the bricking scaffold. As the planned pit level for this winding shaft had been driven from the upcast shaft in the course of development, it was necessary to set a series of hardwood chocks round the circle of the shaft where it would blow through. It was found when the centre line of the shaft was dropped that it corresponded to a small fraction of an inch to the line which had been used to drive the pit level, this was very satisfactory. Just a word about the number of shots before leaving the subject of the shafts. On the average sixteen sumpers were drilled and fired and sixteen side holes, 6 feet of a sump hole was blown below the Arley for guide rod clamps ; bumping balk frames and bumping bricking was started from the bottom of this sump, and the side walls of the pit bottom were tied in with the bricking of the shaft, thus ensuring a stronger job. The shaft had now to be stripped of rider girders, rider guides, ventilation tubes, the sinking doors and frame, so as to prepare for winding with two cages. Sinking had been done using one frame with a 6-foot pulley, the winding rope coming off at roughly the centre of the shaft. Two pulley frames had now to be installed, so as to bring the winding ropes into their correct position for decking at the Orrell Yard Level. It will be noticed that in the case of both shafts we started from Orrell Yard to meet the Ravine ; the need for accuracy was therefore of prime importance, so a short description of the surveying necessary to attain this would be of interest, especially to surveying students. A Watt 6-inch theodolite with shifting centre was used, the verniers reading to 20 seconds ; the outfit was complete with targets. A base line was established in the Ravine Main Motion, and from this a traverse was made to the top of the motion, down the intake tunnel from the Ravine to the Orrell Yard, along the pit level and then down the Orrell Yard No. 1 Brow to Rigbys. A check survey was made, but instead of coming down the intake tunnel the traverse was made down to the No. 7 Pit, where wires were hung in the shaft. The theodolite was then set in line with the wires at the Orrell Yard and the traverse made along the pit level and again down No. 1 Brow. The same method was used to set out the downcast shaft pit level accurately, thus winding could be commenced at this shaft immediately it was equipped. The angles were measured double repetition on both faces. Lines were measured three times with a 100-foot steel band marked in feet, inches, and eighths. Steel blocks (3½-inch square by 3-inch thick with scribed lines) used for marking ends of each 100 feet. All levelling was done trignometrically, a levelling staff being used to sight to alongside the targets. Lastly, I come to the development of the seam from the U.C., whilst the other was being sunk. As the Arley Mine is deep and naturally hot, our biggest difficulty was to keep the mine cool. The first thing to do therefore was to drive the "strets" first, which would complete our ventilation circuit. When these "strets" were driven, the ventilation tubes were passed through a brick stopping and the air then went round the working and back up the shaft. An auxiliary fan was placed in the tubes ; this acted as a booster to the ventilation. Having established this circuit, we could be reasonably sure that the places would not get too hot, and therefore we set about to open two faces and to drive back along the pit level. The pit level stret was cut by a Siskol as was the left-hand side of the dip face. This place was 6 yards wide, 2 yards for the road, 2 yards of lowerside pack, and 2 yards for a belt cutter and track. On the right-hand side of the dip face we used a low seam Samson longwall cutter as an arcwall machine and followed in with a M. and C. low seam type belt conveyor. Two 4-foot cuts per shift were filled out, and 40 yards of face cut out in a week's time. In order to make a connection for this face a 6 X 6 arched road was being driven down on its right-hand side left the main face ready opened out for conveyors and cutting. The 6x6 road cut through to the heading coming across to meet it, and this face was then ready for equipping with gate and face conveyors and cutters. The new 20-inch troughed face belt made by Hugh Woods has been installed on this face and is proving its metal. Whilst the shaft was being equipped for ordinary winding, the right-hand side of the main level face was extended to a distance of 30 yards. A gate belt was installed to receive the coal from the lowerside and higherside faces. An endless rope haulage takes the coal right to the bottom of the staple pit, where it is wound, and thence it gravitates to the Orrell Yard No. 1 Brow, from where it is sent up the No. 7 Pit.
|
|||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||