Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

31st October 1942, Page: 100, Column: 2

Intensive Working Of Coal Outcrops

The first answer to this question was published in No. 7 page 84 of this Journal.

By J. MacChrystal.

The working of outcrop coal in different parts of the country is a new development here, although a lot of this work has been done in the United States and the Colonies. The seams may be shallow, say down to 18 or 20 feet from the surface, or they may be deep, that is, down to 60 feet, which is, I believe, the deepest of the outcrops being worked in Great Britain.

The methods of working shallow and deep seams are similar, but different machines are used, and outcropping is machine mining on a really intensive scale. the simplest way to describe the working is to liken it to huge trenches, and as one trench is finished with the dirt from the adjoining trench is used to fill it, so leaving the surface just about the same as it was before the work started, except for the lowering, of course.

First of all, when the field to be worked has been surveyed, proved, and the lease terms agreed upon, it is marked out in strips about 50 yards wide and from 150 to 400 yards long. If the ground is inclined the work is done from the top of the slope to the bottom, so as to make it easier for the machines.

The top soil (agricultural soil) has to be stripped off first and put in a separate heap away from the other dirt and clay, so that it can be put back on top again ; this is an important point, for no land fit for growing crops of any kind must be destroyed or damaged, and it has to be left in the same condition as it was in before the work commenced.

The stripping, in shallow seams, is done by a caterpillar tractor and trailer. The tractor is Diesel-engined, 90 H.P., and attached to it by means of a coupling rod is the steel trailer car, which runs on wheels with pneumatic tyres, placed right at the rear of the car, the front end being supported by wire ropes fitted to a jib and drum on the tractor. The car has two doors, one at the front to admit the dirt and one at the back to release it. When the operator comes to the appointed place for starting he lifts the front door and lowers the front of the trailer down to the ground. The leading edge of the bottom of the car is shaped like the cutting edge of a wood chisel, consequently it digs into the dirt and scoops it up, the car being raised and the door closed when it is full, then taken away to the far end of the field where the last trench will be. Here it is tipped.

All the operations, door closing and opening, lowering, raising and tipping, are done from the driver's seat on the tractor, the tractor engine supplying the power.

This dirt removal is carried on until there is only a few inches overlying the coal seam, when another machine takes over. This is also a caterpillar tractor, with a steel scraper in front of it which removes the few remaining inches of dirt from the top of the seam and so prevents coal and dirt from being mixed.

If the coal is soft and friable the same machine that removes the dirt can also be used to get the coal, scooping it up in the usual way and taking it to the loading point. It should be mentioned here that the usual load of these trailers is 10 tons of dirt or 8½ tons of coal. When the coal is hard, however, these trailers are unable to deal with it, and another big machine, sometimes called the "American devil," comes into use. This is a huge caterpillar tractor with a steel jib and "shovel," which burrows its way into the coal, swings round when the shovel is full and deposits it, either to be loaded on the spot or taken to a loading station.

In deep workings, that is from 20 to 60 feet, heavier and different machines come into use. Dirt removal is carried out by means of "grab-line" excavators, those being large caterpillar tractors, with jibs 40 to 60 feet long, and attached to the jibs by wire ropes are heavy steel shovels or grabs, carrying about 10 cwt. of material. These machines do not go down into the workings but sit on top, and lower the grab by swinging the jib over and letting out the rope. The grab is directed against the sides or the end of the trench, is hauled up and taken to the tipping place, or dropped into cars to be taken away. When the seam is reached, the scraper tractor comes into use to clean the top of the coal, and finally the "American devil" for the actual coal-getting.

It must be understood that these operations do not have to wait for one another, but are carried on simultaneously ; the excavators are away in front exposing the seam, the scrapers close behind clearing the top off, and then the coal-getting machines. When the first "trench" is worked out the dirt from the second one is put into it, and so on until the field is worked out; then the last trench is filled in with the dirt from the first. Finally the scraper tractors are used again to run over the ground and level it out, so that it can be used for crop growing. The drains may have to receive attention before the men leave the site, but this mainly applies to level country, and it is not a big or costly job.

Advantages.

One great advantage of this system of working is the huge tonnage of coal produced to the number of men employed, which varies from 15 up to as high as 30 tons per day per man, with "unskilled labour," as some newspapers have put it. This is debatable. The machine operators are certainly skilled men, although they are not skilled miners, but I would not hesitate to say that lorry driving was a skilled occupation, and 60 per cent. to 80 per cent. of the men employed on the sites are lorry drivers. I should say, therefore, that the work is done by unskilled miners, but skilled machine operators.

The great expenditure of shaft sinking is cut out, and the huge and costly buildings and plant necessary in colliery yards are simply not needed here. Ventilation problems are non-existent and intruding water is easily dealt with. There is no need to have props, bars, girders, arches, rails, etc., and all the other things necessary to keep haulage roads open — no signalling apparatus and no big office staff. The whole concern is worked as cheap as it is possible to make it.

Even the machines used are not specially made for outcropping. Coal-cutters or gate-end loaders are machines specially designed and built for underground work, and are of no use for anything else ; but these excavating machines have been used in the past for digging and levelling foundations for buildings and factories, making sports grounds, swimming pools, road and railway cuttings, land reclamation and such like work. When the outcropping is finished they can go back on to this work, consequently, their value to the owners is always high.

Experts have stated that they are prepared to remove 10 cubic feet of dirt for every cubic foot of coal, and this statement gives a mining man an idea of the cheapness of the undertaking. There is not a colliery in the world that could do this.

Another thing, the work from a health point of view is almost ideal, and the risk of serious accident is slight, therefore the percentage of absenteeism due to illness or injury is very low. As is well known, regular men on regular jobs keep production up and costs down.

Disadvantages.

The coal produced by these outcrops is what we would call inferior coal. It has not the same heating qualities of deep mined coal and leaves a lot of ash ; it is known as "factory coal," and quite suitable for Lancashire and water tube boilers, power stations and similar plants, if carefully handled. The lack of screening and grading facilities, also the fact that the coal is unwashed, bring the selling prices down a bit.

Most of these sites are away from the railways and canals, and the cost of transport and maintenance is high, some of the lorries having to run nearly five miles from the site to the railhead, carrying from 3 to 5 tons of coal.

Weather conditions may hamper production. Severe frost or heavy snow slows the work of the excavators, the frost hardening the ground, and the snow making extra work when it has to be removed. During heavy snow transport is at a standstill, and it is as much as the lorries or cars can do to get the coal to the reserve heap, on the site. Torrential rain makes things difficult, wooden "mats" having to be laid down for the tractors and lorries, and so prevent them from being bogged. Fog, of course, stops everything.

After these periods of transoprt stoppages, extra lorries have to be put to work to get the accumulated coal away, and if these are not available then the existing lorries have to work longer hours and often at a faster rate. This is where maintenance and repair costs go up.

The work on the sites can only be carried on in daylight. Owing to the present lighting restrictions floodlighting, which would ordinarily be used, is not allowed, and winter months having short hours of daylight per day and bad weather conditions, slows production down, thus production is high in summer and comparatively low in winter.

In summing up, I should say that the advantages by far outweigh the disadvantages, and many more millions of tons of coal will be worked by this method of mining, which would otherwise have been left as an unprofitable proposition.

Compiled from visits and observations in West Yorkshire.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
MacChrystal, James      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print