31st October 1942, Page: 100, Column: 2
Intensive Working Of Coal Outcrops
The first answer to this question was published in No. 7 page 84 of this
Journal.
By J. MacChrystal.
The working of outcrop coal in different parts of the country is a new
development here, although a lot of this work has been done in the United
States and the Colonies. The seams may be shallow, say down to 18 or 20 feet
from the surface, or they may be deep, that is, down to 60 feet, which is, I
believe, the deepest of the outcrops being worked in Great Britain.
The methods of working shallow and deep seams are similar, but different
machines are used, and outcropping is machine mining on a really intensive
scale. the simplest way to describe the working is to liken it to huge
trenches, and as one trench is finished with the dirt from the adjoining trench
is used to fill it, so leaving the surface just about the same as it was before
the work started, except for the lowering, of course.
First of all, when the field to be worked has been surveyed, proved, and the
lease terms agreed upon, it is marked out in strips about 50 yards wide and
from 150 to 400 yards long. If the ground is inclined the work is done from the
top of the slope to the bottom, so as to make it easier for the machines.
The top soil (agricultural soil) has to be stripped off first and put in a
separate heap away from the other dirt and clay, so that it can be put back on
top again ; this is an important point, for no land fit for growing crops of
any kind must be destroyed or damaged, and it has to be left in the same
condition as it was in before the work commenced.
The stripping, in shallow seams, is done by a caterpillar tractor and trailer.
The tractor is Diesel-engined, 90 H.P., and attached to it by means of a
coupling rod is the steel trailer car, which runs on wheels with pneumatic
tyres, placed right at the rear of the car, the front end being supported by
wire ropes fitted to a jib and drum on the tractor. The car has two doors, one
at the front to admit the dirt and one at the back to release it. When the
operator comes to the appointed place for starting he lifts the front door and
lowers the front of the trailer down to the ground. The leading edge of the
bottom of the car is shaped like the cutting edge of a wood chisel,
consequently it digs into the dirt and scoops it up, the car being raised and
the door closed when it is full, then taken away to the far end of the field
where the last trench will be. Here it is tipped.
All the operations, door closing and opening, lowering, raising and tipping,
are done from the driver's seat on the tractor, the tractor engine supplying
the power.
This dirt removal is carried on until there is only a few inches overlying the
coal seam, when another machine takes over. This is also a caterpillar tractor,
with a steel scraper in front of it which removes the few remaining inches of
dirt from the top of the seam and so prevents coal and dirt from being mixed.
If the coal is soft and friable the same machine that removes the dirt can also
be used to get the coal, scooping it up in the usual way and taking it to the
loading point. It should be mentioned here that the usual load of these
trailers is 10 tons of dirt or 8½ tons of coal. When the coal is hard,
however, these trailers are unable to deal with it, and another big machine,
sometimes called the "American devil," comes into use. This is a huge
caterpillar tractor with a steel jib and "shovel," which burrows its
way into the coal, swings round when the shovel is full and deposits it, either
to be loaded on the spot or taken to a loading station.
In deep workings, that is from 20 to 60 feet, heavier and different machines
come into use. Dirt removal is carried out by means of "grab-line"
excavators, those being large caterpillar tractors, with jibs 40 to 60 feet
long, and attached to the jibs by wire ropes are heavy steel shovels or grabs,
carrying about 10 cwt. of material. These machines do not go down into the
workings but sit on top, and lower the grab by swinging the jib over and
letting out the rope. The grab is directed against the sides or the end of the
trench, is hauled up and taken to the tipping place, or dropped into cars to be
taken away. When the seam is reached, the scraper tractor comes into use to
clean the top of the coal, and finally the "American devil" for the
actual coal-getting.
It must be understood that these operations do not have to wait for one
another, but are carried on simultaneously ; the excavators are away in front
exposing the seam, the scrapers close behind clearing the top off, and then the
coal-getting machines. When the first "trench" is worked out the dirt
from the second one is put into it, and so on until the field is worked out;
then the last trench is filled in with the dirt from the first. Finally the
scraper tractors are used again to run over the ground and level it out, so
that it can be used for crop growing. The drains may have to receive attention
before the men leave the site, but this mainly applies to level country, and it
is not a big or costly job.
Advantages.
One great advantage of this system of working is the huge tonnage of coal
produced to the number of men employed, which varies from 15 up to as high as
30 tons per day per man, with "unskilled labour," as some newspapers
have put it. This is debatable. The machine operators are certainly skilled
men, although they are not skilled miners, but I would not hesitate to say that
lorry driving was a skilled occupation, and 60 per cent. to 80 per cent. of the
men employed on the sites are lorry drivers. I should say, therefore, that the
work is done by unskilled miners, but skilled machine operators.
The great expenditure of shaft sinking is cut out, and the huge and costly
buildings and plant necessary in colliery yards are simply not needed here.
Ventilation problems are non-existent and intruding water is easily dealt with.
There is no need to have props, bars, girders, arches, rails, etc., and all the
other things necessary to keep haulage roads open — no signalling
apparatus and no big office staff. The whole concern is worked as cheap as it
is possible to make it.
Even the machines used are not specially made for outcropping. Coal-cutters or
gate-end loaders are machines specially designed and built for underground
work, and are of no use for anything else ; but these excavating machines have
been used in the past for digging and levelling foundations for buildings and
factories, making sports grounds, swimming pools, road and railway cuttings,
land reclamation and such like work. When the outcropping is finished they can
go back on to this work, consequently, their value to the owners is always
high.
Experts have stated that they are prepared to remove 10 cubic feet of dirt for
every cubic foot of coal, and this statement gives a mining man an idea of the
cheapness of the undertaking. There is not a colliery in the world that could
do this.
Another thing, the work from a health point of view is almost ideal, and the
risk of serious accident is slight, therefore the percentage of absenteeism due
to illness or injury is very low. As is well known, regular men on regular jobs
keep production up and costs down.
Disadvantages.
The coal produced by these outcrops is what we would call inferior coal. It has
not the same heating qualities of deep mined coal and leaves a lot of ash ; it
is known as "factory coal," and quite suitable for Lancashire and
water tube boilers, power stations and similar plants, if carefully handled.
The lack of screening and grading facilities, also the fact that the coal is
unwashed, bring the selling prices down a bit.
Most of these sites are away from the railways and canals, and the cost of
transport and maintenance is high, some of the lorries having to run nearly
five miles from the site to the railhead, carrying from 3 to 5 tons of coal.
Weather conditions may hamper production. Severe frost or heavy snow slows the
work of the excavators, the frost hardening the ground, and the snow making
extra work when it has to be removed. During heavy snow transport is at a
standstill, and it is as much as the lorries or cars can do to get the coal to
the reserve heap, on the site. Torrential rain makes things difficult, wooden
"mats" having to be laid down for the tractors and lorries, and so
prevent them from being bogged. Fog, of course, stops everything.
After these periods of transoprt stoppages, extra lorries have to be put to
work to get the accumulated coal away, and if these are not available then the
existing lorries have to work longer hours and often at a faster rate. This is
where maintenance and repair costs go up.
The work on the sites can only be carried on in daylight. Owing to the present
lighting restrictions floodlighting, which would ordinarily be used, is not
allowed, and winter months having short hours of daylight per day and bad
weather conditions, slows production down, thus production is high in summer
and comparatively low in winter.
In summing up, I should say that the advantages by far outweigh the
disadvantages, and many more millions of tons of coal will be worked by this
method of mining, which would otherwise have been left as an unprofitable
proposition.
Compiled from visits and observations in West Yorkshire.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| MacChrystal, James | | | |