24th January 1942, Page: 215, Column: 1
Mechanical Mining In Bituminous Mines
The authors of the U.S. Bureau of Mines Information Circular 7178, Messrs.
Albert L. Toenges and Earl R. Maize, discuss the question of
"Multiple-shift Mechanical Mining in Some Bituminous Coal Mines."
This paper is the third of a series that describes some methods and practices
of mining coal mechanically where operations are conducted on more than one
shift. The purpose of the investigation is to study the operations of different
types of mechanisation used in mines under various systems of mining and
physical conditions to reach conclusions as to the safest and most economical
methods and practices of mining. Physical conditions vary in different and in
the same mining districts and determine, together with economical conditions,
the systems of mining and the types of mechanical loading equipment used.
Mobile loading machines were used in the mines described in the report, except
at two mines, in which conveyors were used on long faces.
Following the presentation of details the authors of the Circular offer the
following conclusions :—
Thickness of the coal bed has an important influence upon output of the loading
machine. The rated capacity of the loading machine is rapidly approached with
increased thickness of the bed. Larger tonnages per cut from thicker beds
result in fewer place changes, and more time is made available for loading.
There is also more coal per linear foot of face, and the time required for
"squirming" or manoeuvring the machines is lessened.
The results of studies indicate that there has been developed a marked increase
in efficiency in handling mobile loading machines, better face preparation and
co-ordination of transportation, with a resultant greater output per man on
mechanised unit.
An advantage is indicated for loading coal by mobile loading machines on to
conveyors in moderately thin beds where roof conditions do not require
excessive timbering. This practice allows cars to be loaded in trips on a
brushed entry. Thus, larger cars can be used than is possible if cars were
taken into rooms for loading ; or a number of small cars can be loaded as a
unit, and the time lost changing a large number of individual small cars is
reduced. The use of a hopper at the inbye end of the conveyor reduces spillage
at the loading point and lessens the amount of coal that must be cleaned up by
hand. The use of this hopper also increases the area into which the rear
conveyor of the loading machine discharges the coal, thus increasing effective
loading time and decreasing the time lost in manoeuvring the rear conveyor of
the loading machine over an exact location.
The atmosphere in the working place is freer from dust where water is used on
the coal during cutting and loading. This practice not only reduces the dust
hazard but should increase the workers' efficiency.
The study thus far indicates that mobile loading machines are best suited to
comparatively level beds with favourable physical conditions. Fragile roof that
requires excessive timbering usually results in a slower rate of loading and
also reduces the tons per man because of the additional men required with each
crew to maintain the working place in safe condition.
Conveyors are adapted to working thin beds, especially in mines using a
longwall or long-face system of mining. To obtain maximum tonnage per man,
enough entry development should be maintained to permit a high proportion of
production from walls. There should be proper balance between wall and
development tonnage.
The advisability of working a mine two shifts a day to obtain optimum results
is recognised. For safety of operation, however, the same quantity and quality
of supervision should be given on all shifts. The third shift should be used
for maintenance of equipment, track extension, timbering, extension of
ventilating circuits, and general mine maintenance. The rapid advance of
working places that results from mechanised mining on two shifts allows little
time during the production shifts for permanent mine maintenance. This work can
be done more efficiently and economically on the third shift.
 |
 |
|