Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

13th December 1941, Page: 180, Column: 1

Underground Belt Transportation

Extracts from paper prepared for presentation before the Coal Division of the American Institute of Mining and Metallurgical Engineers and published in Mining and Metallurgy, the official organ of the Institute.

By Carel Robinson.

A serious objection often raised to belt conveyors is that the belts are so easily damaged that from time to time one must expect them to be destroyed. This, however, is not a valid objection. Admittedly, a belt can easily be damaged, but it need not be.

When precautions have been followed closely, experience in actual operation has proved that extensible belt conveyors, correctly designed, will operate for years without any damage to the belt other than normal wear. When a belt conveyor is first installed a thoroughly competent man who is to have complete charge of the equipment should be selected and carefully trained. Automatic protective devices should be installed. These devices will stop a belt automatically if a splice pulls in two, if the belt starts to slip, or if a leading conveyor stops. In addition they automatically stop all other conveyors behind the belt when it stops. Extreme care should be taken to arrange loading points to ensure proper feed to the belt, and especially is it of vital importance that all spill plates be correctly installed.

Mines with seams of coal 4 feet thick and more provide virtually an untapped field of application for belt conveyors. In normal operation every item of cost, either capital or operating, is reduced as the seam becomes thicker. The dependability of belts assures almost complete freedom from haulage delays, which is reflected directly, of course, in decreased cost, and indirectly in the improvement in morale, for haulage delays are among the most demoralising delays around a mine.

The rate of peak production for each conveyor unit should approximate the capacity of the belt. The rate of delivery to the belt should be as uniform as possible and as near the peak capacity as possible. To accomplish this, mining plans and schedules should be adjusted so that approximately the same production per shift is obtained as the entry advances as on retreat.

The indirect economies of belt conveyors are numerous but are hard to evaluate in dollars and cents.

For general consideration, a brief list of advantages is presented. Any operator considering the use of belt conveyors should check this list, or one of his own composition. For any given mine, these factors can generally be approximated satisfactorily. Naturally, certain conditions are encountered where the entire list may mean little, in others, a great deal.

Advantages of Belt Conveyors.

Following are the most important advantages :—

(1) If properly planned, an average of less than five minutes' delay per shift caused by the transportation system can be expected with belt conveyors. This figure is based on actual performance over a period of years. This small delay time looms large in importance when the delays of mine-car transportation are considered ; wrecks, derailments, broken rails, power lines down, faulty dispatching, and all the other countless causes.

(2) Belt conveyors are less hazardous than mine-car haulage.

(3) Belt haulageways can be timbered at less expense and more effectively. There is no danger of knocking out timbers on belt lines, and accordingly many places can be timbered safely that would be traps in the event of derailment with mine cars.

(4) After the main features of transportation by belt conveyor have been worked out, the problems incident to transportation virtually disappear. This is in direct contrast to the ever-changing problems incident to mine-car haulage, which occupy a large percentage of management's time. With belt conveyors the management is able to concentrate more time and effort on face performance, with resultant decreased cost.

(5) In rolling, faulty, or irregular seams; belts can be used efficiently where mine car haulage would be expensive, or even prohibitive.

(6) Since belt conveyors are only 18 inches or less high, no change in haulage equipment is required where seam conditions change radically.

(7) By simply changing the speed of a 30-inch belt conveyor (provided equipment is so designed), tonnages ranging from 100 tons per hour to 400 tons per hour can be efficiently hauled.

(8) Power cost is generally cheaper than with mine-car haulage, owing to steady load with no peak demand. A.C. power can be readily used, further decreasing power cost.

Disadvantages of Belt Conveyors.

Disadvantages of belt conveyors may be enumerated as follows :

(1) Frequently, belt conveyors have a higher initial capital cost. In a surprising number of instances, however, this need not be true.

(2) The belting is essentially fragile. Constant and expert maintenance is an absolute necessity. Proper safety controls must be installed and maintained. Expert care must be taken to set up loading points properly. Unless these points are given attention, costly damage to the belting can be expected.

(3) Where the mine floor is subsiding or where there is much movement of the mine floor, belt lines may get out of alignment and either cause damage or delay until the situation is corrected. Belts must run in straight lines, and hence are difficult to use in development around faulty areas.

(4) Belts do not provide storage to permit continuing work at the face when there is a delay at the tipple end. A storage supply bin is frequently required.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Robinson, Carel      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print