Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

15th November 1941, Page: 145, Column: 1

Mine Management Problems

Mr. Ridpath's Presidential Address

As would be gathered from the summary of his views on Labour, Training and Accidents in the last issue of this journal (page 133), Mr. T. R. Ridpath, in his presidential address to the North of England Institute of Mining and Mechanical Engineers, directed attention to some aspects of work bearing directly on production, economy and safety. It may be admissible to reproduce some of his observations on the problems of Planning, Ventilation and Pumping, as follows :—

Planning.

Recognising under this heading the long-range Work involved in coal mining, Mr. Ridpath feels that in the desire for increased output there will be the danger of unnecessarily mortgaging the future. Our economic position as a nation is perhaps more dependent upon our coal than upon any other commodity, and he emphasised the importance of taking special care at this time so that in planning a way shall be found of maintaining output whilst developing along lines which will put us in as good a position as possible to hold our own when the days of peace return. He knows it is not easy to find under these war-time conditions the time for consideration which is necessary if future plans are to be thought out with the care they need, but he would stress the importance of not allowing the future to have less than its proper share of attention at the present time.

Second only in importance to long-range planning is, he thinks, short-range planning. The organisation of a pit is a considerable undertaking, and there is always a tendency, once it is working reasonably well, to allow matters to run along without the disturbance that reorganisation entails. Yet changing pit conditions and altered economic circumstances frequently point to the need for revising methods. If, therefore, production is to be maintained, Mr. Ridpath's view is that it may be well to continually ask such questions as the following :—

1. Are existing methods of working the best for the particular conditions prevailing ?

2. Will the adoption of machinery, or more machinery, or different types of machinery increase the production per person employed ?

3. Is the plant now in use the best that can be got for the work which has to be done ?

4. Is the output being got from sufficiently concentrated areas requiring the least possible length of haulage roads and airways and ensuring the best supervision ?

5. Is the coal being handled satisfactorily from the face to the shaft so that production at the face is not impeded ?

6. Can advantage be taken of any faults or heavy gradients to enable undeveloped seams, or other areas of seams already being worked, to be opened out ?

7. Is the haulage track well laid and well maintained ?

Ventilation.

Mr. Ridpath averred that the problem of ventilation stands in a class by itself, due perhaps in some curious way to the invisibility of air. Yet, as he said, its effect on cost may be far from invisible. This is not surprising when it is remembered that the ventilating current has to be efficiently maintained for 168 hours per week and for 52 weeks in every year, and represents a considerable part of the money spent in power supply. A study of this problem at each colliery will frequently be found to lead to unexpected and often considerable saving as well as to the general benefit of the pit.

In examining this problem Mr. Ridpath suggested the following tests might be undertaken :—

(I.) A quantity survey, to show whether the stoppings are efficient and whether a high enough percentage of the air which is circulating reaches the working-faces.

(II.) A pressure survey, to show whether the friction of the airways is excessive and is absorbing too much power.

(III.) Fan tests, to show whether it is efficient and whether its characteristics suit the present-day conditions of the particular colliery. It may be found that owing to the conditions having materially altered it is now quite unsuited for doing required work with a proper degree of efficiency.

Consideration of the above matters relating to ventilation would show whether sinking a new shaft remote from the present downcast would facilitate ventilation.

Such a shaft, by lowering the resistance of the airways and cutting out leakage between intake and return, he inferred might increase the quantity of air and reduce the power required for ventilation. The labour and material used in maintaining long airways would be saved. These charges are sometimes considerable where there are bad roof conditions or where timber is used and has to be frequently renewed, and doubtless the material made available could be used to advantage in some other part of the pit.

In weighing up the benefits which would accrue to ventilation by sinking a new shaft, Mr. Ridpath said it should also be borne in mind that there may be gains in other directions, for instance :—

(a) The new shaft might be used for raising and lowering the men. The dead time taken up by the workmen in travelling to and from their working-places might be reduced and their productive time at the face increased.

(b) Winding the men at another shaft would increase the capacity of the coal-drawing shaft.

(c) Possibly undeveloped seams or new areas of coal in seams now being worked could be made available.

(d) A new shaft might solve some pumping problems by shortening pipe-ranges, and might make electrical supply and distribution simpler and cheaper.

Pumping.

With reference to the question of pumping the president said :—

In the North of England coalfield a large quantity of water has to be dealt with and pumped to the surface, and this absorbs quite a large percentage of the power at collieries. It might therefore be appropriate to ask ourselves the following questions about our pumping arrangements :—

(i.) Are water standages of sufficient capacity to deal with a lengthy stoppage due to any unforeseen cause, remembering that at the time of the stop the standage may not be drained ?

(ii.) Has a second line of defence been thought out in case the standage becomes full before the pumping plant can be restarted ?

(iii.) Has the standage been kept clean or has it become silted up ?

(iv.) Has the quantity of water to be dealt with increased, and has the standage been correspondingly enlarged ?

(v.) Is the water being pumped at the minimum cost ? It is assumed that it will be dealt with at night as far as possible.

(vi.) Is the main pipe-range large enough to deal efficiently with the present volume of Water, bearing in mind that the extension of the workings may have increased the quantity and the frictional head ? Possibly for the new conditions a pump more suitable for the present duty may be required.

(vii.) Has the time come to revise present pumping arrangements and to think ahead about new schemes ?

Mr. Ridpath said, much the same course might be taken with regard to compressed air plant and pipe ranges as with the pumping plant. He also dealt briefly with electricity, lighting, stores, records, and plans.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Ridpath, Thomas Rossiter      Whos Who Page


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print