Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

20th September 1941, Page: 90, Column: 1

Surveying In Indian Coal Mines

By James Lomax.

Very often small collieries cannot afford the necessary expensive equipment or even the services of a full-time surveyor, which probably would not be justified. Their surveys are made by a part-time surveyor, attending on perhaps one day per week ; the latter, because of the conditions of his employment, has only a passing interest. In the British Isles, the surveying of such small collieries would probably be done by a private firm of Consulting Mining Engineers and Surveyors, having at their disposal a well-trained staff and the best of instruments ; in India, however, this is not the case.

In view of the large number of small properties being worked and consequently the numerous barriers which have to be left, it is essential that there should be accuracy in surveying if safe working is to be achieved. This accuracy can only be achieved by constant supervision and by insisting that only fundamentally sound methods be employed.

I once remarked to a colliery manager that the methods of surveying employed in Indian mines left a lot to be desired ; he replied that as far as he was concerned his plans were amongst the neatest he had seen and was confident he could leave the surveying entirely to his surveyor. I thought that a plan's neatness was no criterion of its accuracy, and I venture to suggest that if that manager chose to enquire rather more deeply into the methods employed by his surveyor, he would have some very disturbing moments.

Standard of Surveying.

I am of the opinion that many of the present evils are due to the lack of supervision in the plan office, and lack of attention to detail. As a consequence and since the human element cannot be eliminated, very often the easy way has been adopted and invariably the easy way is wrong in principle. Typical examples of the easy way I give below :%mdash;

(a) Use of linen tapes for the measurement of survey lines.

(b) Infrequent checking of measuring chains against a standard steel band.

(c) Continued use of instruments, both of great age and in such a bad state of repair, as to be impossible to make an accurate survey with them.

(d) Commencing surveys from marks, which are not recognised survey marks and which are not marked on the plan.

(e) Commencing each survey with an independent bearing without reference to the base line of the plan.

(f) Use of single tripod instruments for fast needle traversing.

(g) If survey is based on the magnetic meridian, failure to take frequent check bearings during the course of the survey.

(h) Failure to check the survey by making a complete circuit or closing on to recognised survey stations.

(i) Omitting to take the direction of galleries at a dead end, depending on measurement only.

(j) Plotting the survey without the use of a pricker and by a six-inch brass protractor.

(k) Neglect to make correction for dip when plotting.

(l) Neglect to make correction for change in declination since the time the plan was first made.

(m) Plotting surveys based on magnetic north on a plan based on true north.

(n) Plotting the survey, together with some old workings on a piece of tracing paper, superimposing this on the plan, then pricking the survey through.

(o) Inking in the plan with an ordinary pen, and even in some cases with ordinary ink.

No one can make a survey unless the instruments available are serviceable, and if a reasonable degree of accuracy is to be attained it is essential that the instruments be of reasonably modern design, of a good make and maintained in a good state of repair. If such instruments are available they should be placed at the disposal, not only of the surveyors, but also of the apprentices. No matter how well a survey office may be equipped, its equipment is of little value if the trained personnel is not^there to use it.

Some Simple Methods.

Owing to the changing methods of mining and because of the possibility of serious error, the loose needle method of surveying has now fallen into disfavour and fast needle traversing is generally adopted. A fast needle traverse may be made by one of three methods : (a) By continuous azimuths, (b) By vernier angles, (c) By deflection angles.

No matter what method is adopted, it is necessary that each station be occupied by the instrument. It is, therefore, to be desired that the three-tripod system be adopted as this admits of greater rapidity than if one tripod is used, and obviates any error which may accrue from centring. Generally speaking, the continuous azimuth method is preferred and very often the magnetic meridian is used as a base for the survey, when possible the magnetic azimuth of the first line is measured. If there is accurate foresighting and backsighting the N. and S. graduations of the base plate of the dial lie along the magnetic meridian at each station. Thus the accuracy of angling can be checked by frequent checking of the needle.

The incidence of magnetic storms causing unusual fluctuations in the magnetic needle, during the course of an underground survey, may pass undetected, but if such records were available any unusual variation would be immediately apparent.

The colliery surveyor must measure his own change in declination, and this can be done by setting up a base line on the surface and observing its magnetic bearing at six-monthly intervals, preferably immediately before the half-yearly surveys. It is essential that such observation be made with a reliable telescopic instrument and, since the trough needle of the theodolite is notoriously unreliable, a good telescope dial is ideal for this work. Variation in bearing of this line is a good indication of the change in declination and, incidentally, takes into account any change which may occur in the characteristic reading of the instrument. Thus, correction can be applied for change in declination since the time the plan was made, or if it is required to plot an old survey on a new plan, the necessary correction can be found by reference to past readings of this base line. Similarly, should it be desired to plot the surveys of two or more instruments on the same plan, the difference in the characteristic readings of the various instruments should be noted by observing the bearing of the base line by each instrument in turn.

Very often a plan is based on a line, arrived at through the correlation of surface and underground surveys, and might be termed the Shaft Base Line method. In this case, the survey is commenced by observing a line between two fixed survey stations, the plan bearing of which has been previously noted. The vernier of the instrument is set to this bearing after the instrument has been set up under the second of the stations. An observation is then taken of the first station and the survey proceeds in the normal manner, using any of the three methods previously mentioned. Since the accuracy of the survey depends entirely on angular measurement, a theodolite should be used, and by adopting the vernier angle method it becomes unnecessary to transit the telescope and so eliminates errors due to adjustment of collimation. This method has the disadvantage that recourse cannot be made to the magnetic needle, at intervals during the survey, to check any error of manipulation. Whatever method is adopted, it is necessary that a complete circuit be made to check the survey and on plotting, should the final line fail to tie in to the starting point, it is evident that some error has taken place. If this error is small, it may be due directly to plotting, thus the only true check is to calculate the co-ordinates of the stations.

At the time bearings of lines in a dip direction are observed the inclination reading should be observed also, in order that the plan length may be calculated at the time the survey is plotted. This method is to be preferred to measuring the line in horizontal steps, as this may not be carried out in the absence of a senior surveyor.

Permanent Marks, Setting Out and Plotting.

In making underground surveys, which will subsequently be extended, it is necessary that marks be left at the furthest convenient points inbye, from which to start the later surveys. If this practice has been carried out since the mine first started, permanent marks will be available right from the shaft bottom or from the mouth of the incline.

Proposed work should be marked on the main plan in order that the surveyor may find the position of the proposed line in relation to his nearest permanent mark. The bearing of that line can be taken directly from the plan and after the line has been set out underground a short traverse should be made from the line to the nearest permanent station. This traverse can then be plotted on the plan and the actual position of the line, in relation to the proposed line, noted. Similarly, should it be desired to join a gallery between two points, it would not be necessary to make a special survey since the only information required is its bearing and position in relation to the permanent marks.

In the plotting of general mine surveys, based on the magnetic meridian, the draughtsman on receiving the field book should first apply a correction for inclination to those lines measured in a dip direction. Secondly, he should apply a correction for variation in the declination and the characteristic reading of the instrument ; this correction is found by reference to the records of the surface base line bearings. (It is convenient to mention here, that in the notes of the various surveys the instrument with which the survey was made should be stated.) The corrected measurement should be written in neatly, against the original measurement, preferably in coloured ink.

The two most popular methods of plotting are by protractor and co-ordinates. The co-ordinate method is the more accurate because the position of each station is plotted without being affected by any errors which may have been committed in plotting the previous stations. The protractor method of plotting is the more convenient method and can be carried out expeditiously. It will give a degree of accuracy sufficient for the plotting of general mine surveys if a large protractor is used. A suitable form of protractor is constructed of cardboard. This is engine-divided, and can be obtained in different sizes, the most convenient of which is about twenty-two inches square with a circle 16 inches in diameter, graduated to 10 minutes. The central portion of about 15 inches in diameter is cut away, thereby allowing the plotting to be done on the paper inside the circle, without removing the protractor. This protractor should be used in conjunction with a roller parallel ruler having a length of at least 24 inches.

It will be found convenient to plot the main survey stations of the surface survey by co-ordinates, and having fixed those points, the small internal surveys of the surface features may be plotted by protractor from those stations. Similarly, in plotting the underground surveys the main permanent stations, usually in main roads, may be plotted by co-ordinates and the subsequent general mine surveys by protractor based on the main permanent marks. A distinction is made here between main permanent marks in main roads and permanent marks in other roads.

Correlation of Surface and Underground Surveys.

To determine the relative positions of the surface and underground surveys is one of the most important jobs of the colliery surveyor, and there are several methods which can be adopted to bring about this correlation. Some of these methods are simple and some are very elaborate ; usually the elaborate methods have a high degree of accuracy, but invariably require a considerable amount of time, and a fairly large staff to carry them out. In choosing the method, consideration should be given as to the purpose of the correlation, staff available and inconvenience which may be caused due to stoppages.

In India, where shafts are usually working 24 hours per day and sometimes 7 days per week, it is often inconvenient to install plumb-lines in the shaft and a common practice is to accept one of the winding ropes or guide ropes as being truly vertical. In the case of well-constructed shafts, this method is well within the limits of accuracy of magnetic traverses, but if this method is adopted it should be realised that it is a source of error and as such cannot be recommended. The method adopted depends also on the way entrance is effected into the mine. If, through inclines, a traverse can be made underground which is a continuation of the surface survey ; if the surface survey was a triangulation, the underground traverse can be based on the surface base line. Supposing, however, that the entrance to the mine is effected by vertical shafts, the correlation may be made through the medium of plumb-lines in two shafts, or, if one shaft only is available, by suspending two plumb-lines in one shaft.

Mine Plans.

There is little I have to say about mine plans except that if they are to be of service in 20 years' time it is necessary that they should be made neatly in the first place and care should be taken in handling them. I think it is essential that the surface features should be shown on the plan of the workings irrespective of whether a surface plan is maintained, and in referring to plans I am not referring to tracings. Further, the surface features should be clear and distinctive, such that no mistake can be made between surface and underground. I remember an instance when an old plan was referred to when choosing the site of a fire dam in an old road. After the site had been chosen an inspection was made underground but the old road could not be found. On further examination of the old plan it was found that what Was thought to be an old road was, in fact, a surface drain. Mine plans, in addition to showing the delineation of the mine workings, should also give details of the geological features met with during the working of the mine. In this respect, the manager can give the surveyor every help by insisting that the position of a fault or dyke be proved in each gallery approaching it; very often the position of the fault is only proved at points wide apart and the intermediate galleries are stopped short. It is desirable that the surveyor, when making his survey, should read off the head and foot of the fault and note the throw, in order that this may be shown clearly on the plan. Subsequently, this information may be of major importance in tracing the occurrence of faults and dykes, when planning the proposed working of lower seams. In this connection also systematic levelling, at intervals of 200 feet along main roads, should be encouraged and should be shown on the plan. To have levels of the original mine floor in large goaf areas is very valuable information and helps considerably in tracing the probable course of water after inundations, in readily calculating heads of water, and in the ready determination of the depth of cover.

Discussion of Points Raised.

Following the reading of the paper by Mr. Lomax members engaged in an interesting discussion, which is given in extenso in Part 2 Volume 36 of the Transactions of the Institute. Appended are extracts from the contribution by Mr. K. B. Swamy

Regarding the standard of survey, the author mentions that many of the present evils are due to lack of supervision in the plan office. The ultimate aim of surveying in most cases is to prepare an accurate plan and this takes place in three stages, namely : (a) actual surveying in the mine with instruments involving measurements of distances and angles, (b) computation and (c) plotting. In the plan office, as only computation and plotting can at best be supervised or checked, I think checking the field work now and then in the mine is also equally important.

Under the heading Some Simple Methods of Surveying, the author says that "generally speaking, the continuous azimuth method is preferred and very often the magnetic meridian is used as a base for the survey." But I would suggest the general use of inward angle method (i.e., double foresight method) for the following reasons. The continuous azimuth method should only be adopted for very short and independent traverses and also only when the surveyor is well experienced and skilled. For, with this method, as the bearing of a line is measured only once, there is no check on angular measurements in an open traverse, and in a closed traverse, if an error is disclosed at the final measurement, the whole operation is to be repeated as the mistake in measuring an individual angle cannot be detected at the time of measuring it. Further, in this method, an error in reading or recording is not disclosed until the co-ordinates are calculated ; while with the inward angle method, the angle at each station is measured at least twice by the Repeat-addition method, one measurement acting as check over the other. Thereby there is very little chance of making a mistake. The only minor disadvantage with this method is that it takes a little extra time in measuring each angle twice and also in calculating the bearings from the vernier angles. Thus the inward angle method should invariably be preferred whenever the area is large and connected to other circuits.

In regard to the magnetic meridian being used as a base for the survey : here again I am of opinion that, where the surveyor is not experienced to lay a true north line from astronomical observations, an arbitrary meridian, fixed at a convenient place on the mine surface by means of permanent stations, should be preferred as a base line. The actual surveying of the surface and underground will be more accurate if based on such an arbitrary base line as meridian rather than when based on the magnetic meridian which is ever changing. Of course, the magnetic bearing of this arbitrary base line should be determined only for the purpose of showing the magnetic north on the mine plan. The amount of magnetic declination and the date of measurement should also be noted on the mine plan for future reference.

In regard to the Permanent Marks, I may suggest that it will be advantageous to maintain a register of boundary, surface and underground permanent stations, in which data in a tabular form may be written regarding station numbers, their location with proper references, co-ordinates, date of survey, number and page of field book in which field notes are entered, number and page of computation book in which co-ordinates are calculated, reduced level, its distance from any particular boundary line, etc. Such a register should be found helpful not only to the surveyor but also to the mine manager.

Method of Correlation.

For the purpose of correlation of surface and underground surveys, it is advisable to use invariably a good theodolite instead of a dial. Generally speaking, most of the dials in the coal mines in India cannot be relied upon for very accurate survey Work and much less because most of them are of the sight vane type. A theodolite, because of its superiority in design and workmanship, because of its compound axis which makes for accurate concentricity of the revolving portion, and because of its superior mechanism for centring, levelling and intersection, is essentially an instrument of much greater precision than the dial which has nothing corresponding to the above in its construction. Hence, the use of the theodolite should be insisted upon not only in correlation work but also in all important surveys such as boundary surveys, holing-through surveys, triangulation surveys and astronomical observations in azimuth determinations.

In regard to the method of correlation by two plumb lines in one shaft using a theodolite, there is yet another more convenient and simple method of aligning the wires with the azimuth axis, and it is being practised along with the Weisbach method by our students with great success in the annual survey camps. This method is as follows :—

1. First fix the instrument so that the azimuth axis is approximately in line With the two wires. As the instrument is generally fixed at about 10 feet from the near wire, it is possible to achieve an approximation by means of the naked eye, well within half an inch.

2. Intersect farther wire.

3. Focus near wire.

4. Shift opposite direction by means of centring device (if image of near wire appears to the right of the azimuth line of diaphragm, i.e., shift instrument to the left by the centring device).

5. Intersect near wire.

6. Focus farther wire.

7. Shift same direction by means of centring device (if the image of farther wire appears to the right, i.e., shift instrument to the right).

As the correctness of final alignment is to be judged by focusing on both wires to see that the near wire covers the farther one at the intersection of cross-wires and not by any measurement, we have found this method very easy and at the same time quick. The theory of this method is easy to understand if only a diagram is drawn showing how the images of wires appear at each stage of the above operation.

* Extracts from paper on "Some Aspects of Surveying in Indian Coal Mines" read before the Mining, Geological and Metallurgical Institute of India.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Lomax, James      
Swamy, K. B.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print