|
20th September 1941, Page: 88, Column: 1 Ashington Boys' Training SchemeIt is pleasing to learn that the pit training plans for boys aged between 14-16, adopted by the Ashington Coal Co., Ltd., have been favourably received. A miniature colliery district is provided complete with all devices. The morning classes begin at 9 o'clock, and the boys are provided with overalls, hard hat, cap lamp, belt and ankle guards. A lecture lasting about an hour is given and afterwards there is a visit to some part of the colliery. During the mid-morning break milk is provided from the firm's model dairy. In the afternoon the boys do practical work in the training gallery near the pit bottom. The gallery when completed will be a model 40-yard face, 4 feet high, equipped with supports, packs and conveyors. There will be an endless rope system 80 yards long. In order to encourage rivalry the boys are divided into teams. Points are awarded each day with a final contest on the last day of training. The boys are placed in categories according to their abilities and the most capable are urged to attend the day continuation classes where they receive advanced tuition with full wages. The preliminary training course lasts 10 days.
|
|||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||