Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

26th July 1941, Page: 32, Column: 2

Partial Extraction Of Shaft Pillar

Before the June meeting of the Midland Institute of Mining Engineers Mr. H. Watson Smith read a paper on "The Partial Extraction of a Shaft Pillar." The seam is the well-known Derbyshire Blackshale, of a working thickness of 4¾ feet, lying at a depth of 545 yards. The two shafts (19 feet in diameter and 44 yards apart), sunk in the period 1901-03, passed through the goaf of the Top Hard seam, previously worked in 1800 at a depth of 164 yards, and to deal with the heavily watered strata above the Top Hard seam and the accumulated water in the old workings, the shafts were lined with cast-iron tubbing from 3 yards below surface level to a depth of 175 yards. Towards the end of 1937 the available workable coal in the Blackshale seam was nearing exhaustion, and it was decided that the best level for working the immediate seams would be the Deep Hard seam, 114 yards higher up the shafts. In the main, the pillar was octagonal in shape, and the width was based on the well-known rule of being equal to the depth of the shaft. It lay in a basin, and had a slight inclination. The over-all area was 46.55 acres, and the net area — after deducting existent roadways — was 43.550 acres containing a total estimated quantity of 304,850 tons.

The general method of extraction was by 40-yard wide workings bord-on, with 50-yard wide pillars between, leaving substantial triangular pillars at four corners to act as seats to arrest subsidence pull from the surrounding goaf of the original workings. In the general lay-out advantage was taken of existing roadways to facilitate speedy and economic development and also accommodate haulage arrangements. The method of working was mainly hand-got and filled into tubs, and the haulage was by ponies. Trials in mechanisation — machine-cut filled into tubs, and machine-cut with face and gate conveyors — were carried out, but neither system showed any improvement on the hand-got method because on the short lengths of face the amount of machinery involved and its manipulation at the face were out of proportion to the yield of coal for each operation. The rate of working synchronised to fit in with the exhaustion of the remaining portion of the seam, and other considerations. The weekly output was 1,000-1,200 tons, the total tonnage being 96,250 (41 per cent. of the outer area), made up as follows : Hand-got, filled into tubs, 75,750 tons; machine-got and conveyed, 12,500 tons ; machine-got and filled into tubs, 8,000 tons. Working operations covered about 21 months.

In his conclusions Mr. Smith said the subsidence movement up-to-date (which can be assumed to be practically complete) has not affected the shaft tubbing or "make" of water in the shafts, or the shafts in any way, except to reveal weak brickwork at one inset in each shaft in different seams. With regard to the surface buildings and plant, no trace has been found of cracks or uneven movement, or any damage whatever. The project has proved entirely justifiable in every way, and has resulted in a large quantity of valuable coal being profitably mined which otherwise would have been lost.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Smith, H. Watson      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print