26th July 1941, Page: 32, Column: 2
Partial Extraction Of Shaft Pillar
Before the June meeting of the Midland Institute of Mining Engineers
Mr. H. Watson Smith read a paper on "The Partial Extraction of a Shaft
Pillar." The seam is the well-known Derbyshire Blackshale, of a working
thickness of 4¾ feet, lying at a depth of 545 yards. The two shafts (19
feet in diameter and 44 yards apart), sunk in the period 1901-03, passed
through the goaf of the Top Hard seam, previously worked in 1800 at a depth of
164 yards, and to deal with the heavily watered strata above the Top Hard seam
and the accumulated water in the old workings, the shafts were lined with
cast-iron tubbing from 3 yards below surface level to a depth of 175 yards.
Towards the end of 1937 the available workable coal in the Blackshale seam was
nearing exhaustion, and it was decided that the best level for working the
immediate seams would be the Deep Hard seam, 114 yards higher up the shafts. In
the main, the pillar was octagonal in shape, and the width was based on the
well-known rule of being equal to the depth of the shaft. It lay in a basin,
and had a slight inclination. The over-all area was 46.55 acres, and the net
area — after deducting existent roadways — was 43.550 acres
containing a total estimated quantity of 304,850 tons.
The general method of extraction was by 40-yard wide workings bord-on, with
50-yard wide pillars between, leaving substantial triangular pillars at four
corners to act as seats to arrest subsidence pull from the surrounding goaf of
the original workings. In the general lay-out advantage was taken of existing
roadways to facilitate speedy and economic development and also accommodate
haulage arrangements. The method of working was mainly hand-got and filled into
tubs, and the haulage was by ponies. Trials in mechanisation —
machine-cut filled into tubs, and machine-cut with face and gate conveyors
— were carried out, but neither system showed any improvement on the
hand-got method because on the short lengths of face the amount of machinery
involved and its manipulation at the face were out of proportion to the yield
of coal for each operation. The rate of working synchronised to fit in with the
exhaustion of the remaining portion of the seam, and other considerations. The
weekly output was 1,000-1,200 tons, the total tonnage being 96,250 (41 per
cent. of the outer area), made up as follows : Hand-got, filled into tubs,
75,750 tons; machine-got and conveyed, 12,500 tons ; machine-got and filled
into tubs, 8,000 tons. Working operations covered about 21 months.
In his conclusions Mr. Smith said the subsidence movement up-to-date
(which can be assumed to be practically complete) has not affected the shaft
tubbing or "make" of water in the shafts, or the shafts in any way,
except to reveal weak brickwork at one inset in each shaft in different seams.
With regard to the surface buildings and plant, no trace has been found of
cracks or uneven movement, or any damage whatever. The project has proved
entirely justifiable in every way, and has resulted in a large quantity of
valuable coal being profitably mined which otherwise would have been lost.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Smith, H. Watson | | | |