Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

12th July 1941, Page: 4, Column: 1

Extinguishing Waste-Bank Fire

Officials of the Philadelphia and Reading Coal and Iron Co. have permitted publication of certain experiences in connection with the extinguishing of an extensive waste-bank fire at the St. Nicholas Colliery in the Western Middle anthracite field near Mahanoy City, Pa. Particulars are given by Mr. R. D. Leitch, chemical engineer of the U.S. Bureau of Mines safety division, in Information Circular 7104 of the Bureau under the caption "Some Information on Extinguishing an Anthracite Refuse-bank Fire near Mahanoy City, Pa." Some of the notes are reproduced from the Circular.

By R. D. Leitch.

The well-known methods for preventing spontaneous firing of coal are underwater storage, maintenance of storage piles at a maximum height, below which the heat generated by oxidation can be dissipated, sizing and either packing the piles to cut off air or keeping them loose and well ventilated by cribbing or other means, and close observation to detect abnormal heating under the three last-named methods. To these may be added the effective but less practicable measure of separating and burning, under controlled conditions, the combustible material in the waste.

Quenching with water or smothering with incombustible material has often been effective in extinguishing relatively small fires in stored coal, but usually it is advisable, if not necessary, to dig out the hot or burning coal. The same method may be effective with waste-pile fires, but are less likely to be employed, as the lower value of the waste does not justify the costs incident to the greater areas and volumes involved and the presence of more difficult physical handicaps.

Data are not available on the total losses caused by burning bank fires or on the cost when it has been necessary to extinguish them. These losses and costs, however, must now aggregate several million dollars, to which many millions of dollars certainly will be added in the future unless more effective and less costly methods of handling these troublesome fires are discovered.

Story of the Fire.

The first evidence of fire in the St. Nicholas waste pile was noted on 13th November, 1937, when carbon monoxide was found in No. 1 rock hole to the Holmes vein off No. 15 tunnel, No. 7 plane level, at Maple Hill Colliery. Four days later it was decided to fight the fire by excavating and trucking the burning material to an area east of the fire, where it could be isolated from other banks or coal outcrops and cooled by spraying with water pumped from a nearby creek. While getting equipment to the site and installing pumping facilities it also was decided to attempt other control measures. Churn-drill holes were made to determine the extent of the fire. After the holes had served their purpose they were flooded with a suspension of one bag (80 pounds) of rock dust in about ten gallons of water and abandoned. During excavations later it was observed that the rock dust had penetrated radially into the surrounding material for a distance of 6 to 8 feet.

An interesting feature at the time the rock-dust solution was applied through the churn-drill holes was the presence of a faint ammonia odour in the vicinity of the holes. The ammonia probably was liberated by the chemical action of free lime on ammoniacal compounds, the free lime being formed by the action of heat on the limestone rock dust applied, while the ammoniacal compounds resulted from semi-distillation of carbonaceous matter in the refuse bank.

Temperature readings were taken at the various depths as the drilling progressed. It was necessary to case all holes to full depth. Those not exceeding 120 feet in depth were cased with 10-inch pipe, but it was necessary in deeper holes to use 8-inch diameter liner pipe as an inner casing to prevent buckling, and this was the procedure on all holes exceeding 120 feet in depth.

The method of applying limestone rock-dust solution through holes made in the bank has been used successfully to control refuse-bank fires at other locations. Owing to difficult drilling conditions on the St. Nicholas refuse-bank, this method of application of rock dust was limited to locations where the churn drilling would not interfere with the excavation of the fire and the completed test holes could be flooded with rock-dust solution. While churn drilling was in progress, an attempt was made to smother the fire by rock-dusting the surface. The rock dust was spread by chutes extending from the top of the bank down to the fire area. The chutes were moved laterally along the bank until the surface was covered as desired. A total of 700 tons of rock dust was used to cover an area of 7,500 square feet to a depth of 2 to 3 feet. The procedure appeared to be ineffective as a fire-control measure.

Excavation and Transport.

Following the decision to excavate the burning material, it was necessary to construct a truck road to the vicinity of the fire. This required the construction of about 1,200 feet of road along the slope of the old Maple Hill refuse-bank. Water lines and pumps were installed to quench the burning material.

During the construction of the truck road, several operators on the excavating equipment were overcome by fumes from the fire, and it was decided to install forced ventilation. Accordingly, two centrifugal blower fans were placed in fresh air on the Maple Hill refuse-bank and delivered air through a 20-inch ventube to the excavating equipment and trucks in the pit. As the area of the pit increased during excavation, natural ventilation increased and the artificial ventilation system was unnecessary after about three months of work.

The general plan for extinguishing the fire was to isolate the burning material, load it on trucks, and quench at a selected site east of the fire. In somewhat more detail, the plan was first to isolate the Maple Hill bank by excavating with small dragline shovels a trench to natural surface between the two banks to prevent spread of the fire into that bank ; then, as much as possible of the material overlying the fire in the St. Nicholas bank was to be removed by a large dragline shovel and cast back on top of the refuse pile ; and finally, the remaining material, including that actually on fire, was to be transported by trucks as first-mentioned.

The equipment for this work was all Diesel-powered except the gasoline-driven 43-B shovel. The transportation equipment consisted of 20 gasoline-driven Mack dump trucks of 9-cubic-yard capacity. After the trench had been excavated along the Maple Hill bank, similar trenches were excavated roughly at right angles southward along the east and west limits of the fire, and finally isolation was completed by trenching along the south limit of the fire. Thus, an island of burning material was left remaining in the pit except for the main truck road, a necessary connecting link. However, this part of the road was a clay fill, so that the fire remained completely isolated to the end of the work. When the fire was completely isolated from the adjoining banks it was a matter of excavating the burning material and hauling it to the dump area, where it was cooled with water.

Considerable difficulty was experienced in excavating the northern portion of the "island," where the coarser rock of the Maple Hill bank was fused to form a massive clinker that extended from the east to the west limits of the fire. This clinker had to be drilled and shot, which was accomplished by first cooling with water the area to be drilled. Even then it was impossible to drill holes deeper than 4½ feet, as heat of the clinker below this depth caused flattening of the drill bit. Holes were 3 inches in diameter, spaced 6 feet apart. The charge for each hole consisted of two 2- by 12-inch sticks of 40 per cent. dynamite wrapped in sheet asbestos.

Disposal of Burning Material.

Excavation of the burning material was completed 28th May, 1938. It is estimated that a total of 1,685,300 cubic yards of material was moved, of which 786,400 cubic yards was moved by the 10-W Monighan dragline located on top of the St. Nicholas bank and 898,900 cubic yards was moved by the smaller machines. Of the total quantity of material handled by the smaller machines, 798,900 cubic yards was loaded into trucks and hauled to the disposal area. The burning material was dumped in individual piles until the dump area was covered, then the whole area was cooled with streams of water from a number of hose lines. After the piles had cooled sufficiently they were levelled with a bulldozer and another layer of hot material was added after due precautions had been taken to make certain that the previous layer was completely cooled.

Attention to Health Standard.

Although 87 persons engaged in the work suffered some sort of injury, the health and accident record is remarkably favourable when it is considered that during a total of more than 28,000 man-days in hazardous work (for much of the time in winter), no fatalities occurred and the injuries were mostly of a minor nature. Of the 87 injuries 55 required no lost time ; thirty of the total were due to operation of trucks.

Early in the work the smoke, fumes, and dust seemed to have a definite psychological effect. The situation was improved speedily and later eliminated by providing gas masks for shovel operators and dust respirators for others ; and providing the general foreman with a carbon monoxide detector, which he used frequently in the presence of other employees with repeated assurance that no dangerous atmospheres existed. His almost constant presence at suspected points of danger is believed to have allayed most of the fear experienced early. Gas masks seldom were used after short trials, although they were always readily available, because the men preferred the discomfort without respiratory protection to that experienced in wearing masks. Forced ventilation was provided during the early and worst stages of the work, and a well-equipped first-aid station was maintained on the ground.

The man-days worked numbered 28,218, and the job cost 532,000 dollars.

In some general observations it is pointed out that an interesting feature was the method by which the fire advanced in the St. Nicholas bank. It was noted that the fire proceeded in small finger like areas following vents or concentrations of coarser material. As is common on all high banks, most of the coarser material is concentrated at the bottom of the bank or at the junction of two banks or sections of the same bank. As in this instance, concentrations of coarser material usually are found in lines parallel to the slope of the bank. Thus, a grate and multiple chimney effect is produced by which air is drawn through the fire area making it difficult or even impossible to control by blanketing with limestone dust, earth, sand, clay, or other similar material. In digging out such fires, the finger like spread may allow the drilling of exploratory holes to indicate the actual limits of the fire.

It appears that if a barrier to the extension of a fire in waste banks of similar material is to be made by introducing a suspension of rock dust in water, the drill holes should not be more than ten to twelve feet apart, as the spread of the rock dust here did not exceed six to eight feet radially from the holes. The distance would vary, of course, with the nature of the refuse, temperatures due to the fire, and possibly other conditions.

Frequent inspections of surface waste piles and recording of sub-surface temperatures with analyses of the gases occurring a few feet beneath the surface are of value in preventing firing and certainly in discovering a fire or tendency to fire in the incipient stages. These data can and should be obtained by drilling holes a few feet in depth wherever evidence of heating is noted, as for example the presence of steam or smoke or the melting of snow in the winter.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Leitch, R. D.    Chemical Engineer, U.S. Bureau of Mines  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print