Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

28th June 1941, Page: 401, Column: 1

South African Coal Preparation Problems

Discussion before Joint Meeting of Engineers

At the joint meeting in March of the South African Institution of Engineers and the Chemical, Metallurgical and Mining Society of South Africa, Mr. T. Coulter* read a paper on "Some Recent Problems in Coal Preparation and Washing on the Lewis and Marks Group of Collieries."

The Author said the subject of "Coal Preparation" covers a wide range of methods used in handling "Run-of-Mine" coal as it comes straight from the colliery workings into the surface plant, and in crushing, screening, cleaning and loading the various products into railway trucks for dispatch to the consumer.

During the past decade some interesting changes have taken place in America, Britain and on the Continent in the technique of preparing coal for the market, particularly in regard to the methods employed for cleaning, in which some new and novel systems have recently been developed on a commercial scale.

No two coal handling problems are treated in the same manner. There is a great diversity of opinion and ideas as to how a plant should be designed and laid out to meet any given set of conditions.

Nowadays there is such a wide range of good plant to choose from that it often becomes a matter of extreme difficulty for the engineer to make up his mind on the type of equipment best suited to his requirements, for in that selection very often lies the key to layout and flow sheet details.

There is also that human tendency, which manifests itself in many subtle ways, to stick to the narrow path of proved methods, to play safe as it were, and to leave experimentation to other people.

Whatever course is adopted the engineer who is called upon to deal with any given coal handling problem must decide and act according to his training, judgment and experience, and then hope for the best.

The golden rules to be followed in getting the right kind of plant vary according to one's experience ; the wider and harder the experience, the easier it usually becomes to judge the merits or otherwise of proposals put forward for meeting any given requirements.

Conditions in Five Coal Areas.

Mr. Coulter reviewed five problems covering various classes of coal and differing substantially in plant capacity and market requirements, concluding his paper with some general observations on the subject of crushing and washing. The cases examined and reviewed are those which have recently been dealt with at the following collieries : (1) The East Shaft of Springfield Colliery in the Vereeniging District (installation, "Chance" heavy liquid gravity type) ; (2) The West Shaft of Springfield Colliery ("Norton" improved "Baum" type) ; (3) Largo Colliery in the Springs District (Norton type) ; (4) Schoongezicht Colliery in the Witbank District (Chance type) ; (5) Vryheid Coronation Colliery in the Vryheid District (Felspar Jig type washery installed specially for coking coal).

Springfield Colliery (East Shaft) is situated about four miles north of Vereeniging township. It was opened up in the year 1935 for the primary purpose of supplying the coal requirements of Klip Power Station, certain tonnage demands in the domestic and general industrial market also being catered for.

Boring operations and some prior milling experience in the outcrop zones had proved the existence of a seam of coal ranging from a few feet up to 60 feet in thickness, generally low in grade, and containing varying amounts of interbedded shale and lying on a highly undulating bed of water-bearing dolomites. This unusually thick seam was made up of alternating beds of different classes of coal, massive in structure, varying in calorific value from about 8,000 to 11,500 B.T.U.'s and intercalated with thin bands of carbonaceous and clay shale.

The West Shaft, about 1½ miles distant from the East Shaft, was opened up and developed in 1937-38 for the purpose of meeting additional demands for coal at Klip Power Station.

Compared with the East Shaft, the coal preparation problem at the West Shaft was much simpler, as there Was no necessity for double stage washing, ample provision having already been made for meeting the domestic trade requirements from the East Shaft plant. However, it was considered advisable to arrange for washing the entire Run-of-Mine output, including the -¾ inch fraction, as the handling and transport arrangements were such as to remove much of the moisture from the washed product before it reached the power station bunkers.

Largo Colliery is situated in the Springs District and has been operating for about 21 years. All coal produced at Largo is crushed down to minus 2/2½ inch mesh in the first instance, after which a certain proportion of nuts is screened out, before crushing the balance down to minus 7/8 inch.

The coalfield contains three separate seams, low in grade and similar in character to the Vereeniging coals. The Bottom seam is the best of the three, from the standpoint of quality, with the Top and Middle seams ranking on a lower and more or less equal basis. Gradual exhaustion of the bottom seam reserves over the past few years has necessitated drawing larger proportions of output from the other two seams, and this resulted in a marked falling off in both the calorific value and burning qualities of the coal, giving rise to various difficulties at the power stations.

Cleaning facilities were limited to the usual hand sorting, which at best gives very poor results in dealing with these low grade coals. Consideration was therefore given to the question of washing and the necessary investigations were carried out regarding the system to be adopted. Experience with the Springfield East and West shaft plants proved to be most helpful in dealing with the Largo problem.

Schoongezicht Colliery is situated in the Witbank District and has been working for over 19 years. Two seams are being mined, namely the Bottom or No. 1 seam, and the Main or No. 2 seam of the Witbank coalfield.

Both seams contain hard, tough coal, with numerous intrusions of interbedded hard shaly sandstone (locally known as "floating bands"), while the coal itself shows variations in calorific value over a wide range. As a result of these conditions, the usual system of cleaning by hand on sorting belts did not always give the desired results. Apart from this, selective methods of mining had to be adopted underground and losses of marketable coal inevitably took place.

Early in the year 1937 it was decided to investigate the question of erecting a new coal handling plant, embodying washing facilities. Choice of a washing process was governed by two important points, firstly the extreme range in the sizes to be washed, namely 9 inches down to ¼ inch; and secondly the necessity for accurate separation, in view of the character of the coal and the comparatively high percentage of refuse to be discharged so as to obtain the desired improvement in quality. The decision was finally made in favour of another "Chance" installation equipped with a 12-foot diameter cone for single stage washing.

Vryheid Coronation Colliery is situated in the Vryheid district of Northern Natal and has been producing for about 18 years, Three seams are worked, each averaging about 4 feet thick and yielding very soft, friable coal of high coking propensity.

Expansion in coke production gave rise to certain problems in the washing of small coal of a size -¼ inch mesh. Approximately two tons of Run-of-Mine coal are required for the production of one ton of coke. The raw coal is washed to remove stone, shale and bone material, some 33 per cent. being discarded in the process. Two tons of raw coal yield, after washing, about 1.34 tons of clean coal, which on being coked in the open burning ovens used at this colliery, will produce roughly one ton of coke. Therefore, for the production of 10,000 tons of coke per month, 20,000 tons of raw coal are required.

Mr. Coulter's review of the five coal preparation problems covered a range of different layouts and methods in which an aggregate of about 16,750 tons of Run-of-Mine coal are being handled each working day. Of this total, approximately 14,250 tons, equal to about 85 per cent., are washed each day.

Coal Specification Changes.

The paper included much material in detail of special interest to South African students and users of plant. It may be admissible here to present excerpts from the Author's general statement of conclusions as under :—

Apart from the large tonnage being washed, considerable quantities of crushed coal are also required for power station consumption, and at three of the five collieries under discussion some 10,000 tons per day of a specially graded -¾ inch product have to be supplied.

Many years ago the Victoria Falls and Transvaal Power Company used to burn coal crushed down to about 1¼ inches only, with a certain proportion of oversize, but gradually that specification has been altered first to 1 inch, then to ¾ inch, and at the present time the plants must operate so as to produce not more than 1 or 2 per cent, oversize left on a ¾ inch mesh screen.

An important point about the specification of coal for these stations is the necessity for maintaining correct grading in the smaller -½ inch of which the proportion now called for must average about 65 per cent., with approximately 35 per cent, able to pass through a ¼ inch mesh screen.

Changes in coal specification have naturally had very marked repercussions on plant design, and crushing is no longer a matter of pushing the coal through a couple of toothed rolls, but a scientific business in which the product goes through quite a lengthy process of crushing, screening and re-crushing until the desired size and grading is obtained.

In dealing with crushing problems experience has shown the necessity for good equipment, with ample margin in capacity to meet the heavy and unavoidable fluctuations in both load and grading of the coal delivered to the plant.

As a matter of interest it should be noted that all coal which passes through the plant is subject to more or less continuous sampling, from which one composite sample representing the tonnage supplied each day is prepared for calorific determination.

While it is true that many European collieries are actually discarding in the process of washing greater percentages of refuse than South African collieries are called upon to deal with, the dirt is mostly confined to the smaller sizes under two or three inches, and is adventitious shale or sandstone not inherent in the seam but associated with it in the roof or floor. Lump coal is usually a high grade low ash product, requiring only a small amount of hand picking. It is not uncommon for a colliery in England to wash out 20/30 per cent. of its smaller sizes as refuse, but in doing so the ash content is often reduced from 20/25 per cent, to as low as 4 or 5 per cent.

Such results cannot be obtained in South Africa because the general run of coal is quite different, especially in the Transvaal where the inherent ash content is high with the middling fraction, in certain seams, reaching heavy proportions.

Washing Systems.

Since the first big "Chance" plant was introduced at the Springfield Colliery, nearly six years ago, much information and valuable experience has been gained in dealing with these complex coals, from which both purchasers and suppliers of washing equipment have profited.

Experience in the use of both the Baum and Chance systems during that period has convinced the Author that each has its merit, suitability and special field of application in dealing with South African coals.

During the past two years, further progress has been made in developing the heavy liquid system of washing along new lines, in which separation is effected in a more or less static liquid. A number of commercial plants are now at work in England and high separation efficiency is being claimed at most of these installations.

Speaking generally of Transvaal conditions, it is probably true that in many instances the long distance benefits from a washing, policy are quite appreciable.

Most Transvaal coals are amenable to washing, and there are very considerable tonnage reserves of coal available in the Union, with the calorific value lying not far below the "A" grade line, which could be easily brought up to that line by efficient cleaning. Obviously such propositions call for washing, and any attempt to exploit these areas without regard to the benefits Which would accrue from good methods of coal preparation is merely asking for trouble that could easily be avoided.

Calorific Standard.

Many collieries in the Witbank District have been obliged for a number of years past to maintain standards of quality slightly higher than the average weight of the field, and this has necessitated a certain amount of selective mining, besides imposing considerable hardship in maintaining grade. These difficulties are well known to all producers in the Witbank field, and there is no doubt whatever that the adoption of washing greatly eases the struggle and vigilance necessary in supplying clean, good quality coal up to the required calorific standard.

There is a natural tendency at times to regard the present 12.8 standard (calorific value 12.80 lb./lb.) as being too high for easy and comfortable attainment, and suggestions are often heard that the figure should be reduced to 12.5 and so, it is contended, rule out the necessity and expense of washing.

Reducing the standard would not, in the opinion of the Author, eliminate the need for washing many areas of Main Seam, which at best is usually a mixed grill of dull and bright coal of constantly varying grade.

Selective Mining.

In this connection the conflict between producer and consumer raises an interesting point. The consumer is looking more and more for a product containing maximum heating value, with the minimum of ash content, and in fairness it should be said that he does not usually object to paying a little extra on the pitsmouth price for the better grade product.

On the other hand, anxious enquiries are made from time to time on behalf of the Government as to whether coal mining companies are not indulging in too much selective mining for the benefit of the consumer to the detriment of national interest and posterity.

In these difficult circumstances Mr. Coulter says it is impossible to lay down any clear cut suggestions as to what policy should be followed in working South African coalfields to the best advantage, beyond perhaps saying that the producer must adopt a middle course by working his property to the best ultimate advantage, at the same time keeping faith with the consumer.

Coal mining after all is a competitive business in which mining conditions, working costs, quality of the product and so on all play their part in making the Profit and Loss Account look pleasing or otherwise.

All things being equal, good quality products command attention in the market, and relieve the producer of much worry and trouble in dealing with the consumer.

The Author is of opinion that better methods of coal preparation, including washing, will play an important part in the future in opening up many areas regarded at the moment as indifferent commercial subjects, and thus greatly add to the reserves of good quality coal available to meet the Union's requirements.


* Consulting Engineer of the Lewis and Marks group of collieries.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Coulter, T.    Consulting Engineer  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print