Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

31st May 1941, Page: 378, Column: 2

Roof Control And Conservation Of Supports

The most direct means of conserving timber and steel supports is by maintaining a high standard of roof control at the face and on the roads, thereby reducing overloading, crushing, and loss of supports to an absolute minimum. With that brief introduction Dr. J. R. Dinsdale and Mr. J. M. Hughes in their paper on "Roof Control and the Conservation of Timber and Steel Supports," before the South Wales Institute of Engineers, said that at a colliery detailed observations were made in a district that was wholly supported on timber and has since been converted to steel. The seam is 3 feet thick and is overlain by about 6 inches of clod, the depth from the surface being about 600 yards. The roof is a very weak shale and the floor a weak fireclay. Thirty-three feet above the seam another seam 6 feet thick has been worked out. The district is a double unit conveyor face 300 yards long with three roads leading to the face, one at each end of the face, and a loading level lined with 14 feet steel arches in the middle of the face. The face supports are nearly 100 per cent. steel and consist of rigid steel posts and steel straps. As the quality of packing improved, the roof conditions also improved, and the falls were eliminated, the output for the district was raised, and the steel losses were gradually reduced. The steel arches supporting the three roads to the face are erected on wood "bridges" cut from scrap timber which act as stilts and allow the arches to yield without any appreciable distortion. Describing the cycle of operations the Authors said :—

Each side of the double unit is advanced every other day so that the whole double unit is turned five feet every two days, when the face is advancing at its normal rate. The steel supports are withdrawn opposite the packs on the afternoon shift on the side that, is being turned that day. The same night the packing on this side of the double unit is put in and, completed. The steel supports in the wastes on this half of the district aw withdrawn the following afternoon, leaving only one row standing behind the conveyor.

Similarly, on the other half of the double unit the steel supports are withdrawn opposite the packs on one afternoon. The same night the packs on this half are put in and completed, and the next day the steel supports are withdrawn opposite the wastes. This work is so arranged that when supports are being withdrawn opposite the packs on one half of the district, they are being withdrawn opposite the wastes on the other half. Exactly the same cycle is maintained for each half of the district, but each is one day out of phase with the other. This system enables all packs to be completed on the first night on the side that has turned. The next night all the packers and rubbish tippers are then able to concentrate on the other side of the double unit and complete the packing on that side.

Three "sets" of two steel drawers are maintained on the face. One set can withdraw the steel posts and straps opposite the packs on one half of the district in one shift. But, since the steel posts in the wastes are not drawn until the following afternoon, these have to stand one day longer. In consequence, the supports in the wastes are more difficult to withdraw and four men are required to extract the posts and straps in the wastes on one half of the district in a shift. During these observations convergence records were made and these showed a steady uniform rate of subsidence of the roof and the absence of sudden changes in the rate of convergence associated with "weights" and heavy falls. The main features of the work done in the district to maintain good roof control and reduce the steel losses, the Authors say, can be briefly summarised as follows :—

Good system of packing to suit the roof conditions and the packs reinforced with about 10 trams of quarry stones every shift to enable strong corners and walls to be built.

Building face walls of packs at least 6 inches clear of steel posts so that the Sylvester chain can be put around posts opposite packs without disturbing pack walls.

Keeping roadhead rippings close to face and sending these stones down the face for packers.

Maintaining good height at roadhead for packing stones to be sent in by taking down 2 feet 6 inches road rippings at coal face for width of road. This also enabled the building of the roadside packs to be commenced at once from this stone without having to wait for stones from main rippings.

Strong face posting, which was facilitated by taking down the 6 inches of clod on top of the seam to give a better roof for colliers to strap against.

Good system of steel drawing. This was so arranged that it could be completed every day opposite the packs on one half of the face, and opposite the wastes on the other half. This prompt withdrawal of steel posts prevented excessive loading and penetration of posts into the floor.

Placing steel posts on the face side of the conveyor to prevent loss in rubbish behind conveyor.

Keeping the face straight.

Keeping the face clean by giving good clearance to colliers and packing tightly all rubbish.

Careful check on all posts and straps sent into and out of the district.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Dinsdale, J. R., Dr.      
Hughes, J. M.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print