Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

19th April 1941, Page: 330, Column: 1

Winning Out With The Scraper Conveyor

From paper read before the March meeting of the Associates and Students' Section of the North of England Institute of Mining and Mechanical Engineers.

By Arthur Snowball, Assoc.I.M.E.

This subject has been chosen because personally I think the possibilities of the "Scraper" conveyor have not been fully realised as an efficient way of conveying coals cheaply and quickly.

With the "Scraper" conveyor undulations of the floor cause no trouble ; water in any quantity does not prevent the conveyor from working ; falls that may occur do not bury anything of great value ; breakdowns are generally of a minor character and can easily be repaired ; maintenance costs compare very favourably with other types of conveyor ; there is no fear of broken belts.

Apart from the "hoist" and ropes it is practically a home-made conveyor. The "skips" are made at the colliery, and now that wartime conditions have produced an acute shortage of timber the "guides" are being made from home-felled trees, and they are proving satisfactory. Instead of the usual "loader" we have a bridge arrangement for loading directly into the tub in the mothergate. This bridge has proved very satisfactory also ; there was some slight doubt about the result at first, but our fears were soon set at rest and it gave us no trouble whatever, thus eliminating maintenance and electricity cost of a loader.

Dealing with the "hoist" first, this is in principle a small main and tail rope haulage directly driven by a 20 horse-power motor and incorporating epicycloidal gears for instantaneous reversal by means of a friction clutch lined with "Ferodo" brake lining, the whole being mounted on a tram for easy movement. The "guides" are made in five-yard lengths of timber, 6 inches x 2½-inch section, faced with 2-inch wide strips of iron to eliminate friction, the whole being hold together by props fitting into straps on the other side of the "guides."

The "jockey" or return wheel was also colliery made. This is just an ordinary elbow wheel 1' 6" diameter fitted into a steel frame, which is held in position by "still" props. The "skips" are 6 feet long and 12 inches high, made of ½-inch iron ; angle iron 2 inches wide is fitted to the bottom to prevent the skips from pulling into the floor. This also gives the "skips" a gliding motion ; the sides are held together by "tie" pieces, making the whole a rigid structure. Two "skips" are made with those dimensions and a third "skip" is identical in every way, excepting the height, which is only 9 inches. This "skip" delivers to one of the larger "skips," the two being run "in tandem" 30 yards apart.

The conveyor is working in the Brockwell seam, the average height being 21 inches. The roof is a blue shale about 3 feet 6 inches thick, then a very hard post panel 15 inches thick, and the floor is an inferior seggar fairly hard. The seam itself is clean, except for three inches of dull coal near the floor which has no marketable quality. The seam is undercut to a depth of 3 foot 6 inches by a twelve-inch Anderson Boyes coal-cutting machine electrically driven. The length of the face is 100 yards, the "skips" being spaced 30 yards apart, this producing from 75 to 80 tons of coal per cut.

The bridge arrangement referred to is laid across the mothergate, the supporting girders being five yards long resting on each side of the caunch, made of channel section girders 5 inches x 3 inches and "tied" together by ¼ inch mild steel plating, an aperture being left 2 feet 6 inches square to load directly into the tub. As this is our main winning-out face we are completing the roadways as a finished job. The mothergate is being completed as a main haulage road 10 feet x 7 feet, arched steel girders being set right to the face. Left and right companion gates are the main returns, 6 feet x 6 feet arched steel girders being set. All girders are set on 8-inch sole-trees which are resting on twelve inches of "gummings." The distances between the left and right side returns are twenty and thirty yards respectively from the mothergate ; the left side is "stowed" solid and the right side has ten yards of stowing to the mothergate side and ten yards from the mothergate, leaving ten yards of goaf between packs. This system of packing prevents undue crush being put on the arched girders, and girders which have been in for over nine months still show no signs of deformity.

The whole conveyor is periodically moved forward each night, arrangements being made with the pullers to move forward the chocks and draw all back timber.

The "hoist" which is forward with each pull, is dealt with by the stonemen who fire this gate, a price being suitably arranged for this extra work. The "hoist-gate" is only supported by props and bars, and the same supports are employed in the tailgate as these gates are only maintained for ventilation purposes.

Steel straps are used for face supports, and the roof on this face gives us very little trouble indeed.

The face is being worked "on the face" or "bordways," and whilst the coal is fairly friable the three inches of dull coal is very tough and woody, and it is in this coal that the under-cut is made.

The idea of employing the "Scraper" conveyor was to develop our winning out face as quickly as possible, winning out other conveyor faces of 300 yards in length to work as double units.

There may be some conditions where some other system of working could be more profitably employed, but given a fair reasonable "try-out" the "Scraper" conveyor can prove a very efficient servant.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Snowball, Arthur    Mining Engineer  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print