Winning Out With The Scraper Conveyor
From paper read before the March meeting of the Associates and Students'
Section of the North of England Institute of Mining and Mechanical Engineers.
By Arthur Snowball, Assoc.I.M.E.
This subject has been chosen because personally I think the possibilities of
the "Scraper" conveyor have not been fully realised as an efficient
way of conveying coals cheaply and quickly.
With the "Scraper" conveyor undulations of the floor cause no trouble
; water in any quantity does not prevent the conveyor from working ; falls that
may occur do not bury anything of great value ; breakdowns are generally of a
minor character and can easily be repaired ; maintenance costs compare very
favourably with other types of conveyor ; there is no fear of broken belts.
Apart from the "hoist" and ropes it is practically a home-made
conveyor. The "skips" are made at the colliery, and now that wartime
conditions have produced an acute shortage of timber the "guides" are
being made from home-felled trees, and they are proving satisfactory. Instead
of the usual "loader" we have a bridge arrangement for loading
directly into the tub in the mothergate. This bridge has proved very
satisfactory also ; there was some slight doubt about the result at first, but
our fears were soon set at rest and it gave us no trouble whatever, thus
eliminating maintenance and electricity cost of a loader.
Dealing with the "hoist" first, this is in principle a small main and
tail rope haulage directly driven by a 20 horse-power motor and incorporating
epicycloidal gears for instantaneous reversal by means of a friction clutch
lined with "Ferodo" brake lining, the whole being mounted on a tram
for easy movement. The "guides" are made in five-yard lengths of
timber, 6 inches x 2½-inch section, faced with 2-inch wide strips of iron
to eliminate friction, the whole being hold together by props fitting into
straps on the other side of the "guides."
The "jockey" or return wheel was also colliery made. This is just an
ordinary elbow wheel 1' 6" diameter fitted into a steel frame, which is
held in position by "still" props. The "skips" are 6 feet
long and 12 inches high, made of ½-inch iron ; angle iron 2 inches wide is
fitted to the bottom to prevent the skips from pulling into the floor. This
also gives the "skips" a gliding motion ; the sides are held together
by "tie" pieces, making the whole a rigid structure. Two
"skips" are made with those dimensions and a third "skip"
is identical in every way, excepting the height, which is only 9 inches. This
"skip" delivers to one of the larger "skips," the two being
run "in tandem" 30 yards apart.
The conveyor is working in the Brockwell seam, the average height being 21
inches. The roof is a blue shale about 3 feet 6 inches thick, then a very hard
post panel 15 inches thick, and the floor is an inferior seggar fairly hard.
The seam itself is clean, except for three inches of dull coal near the floor
which has no marketable quality. The seam is undercut to a depth of 3 foot 6
inches by a twelve-inch Anderson Boyes coal-cutting machine electrically
driven. The length of the face is 100 yards, the "skips" being spaced
30 yards apart, this producing from 75 to 80 tons of coal per cut.
The bridge arrangement referred to is laid across the mothergate, the
supporting girders being five yards long resting on each side of the caunch,
made of channel section girders 5 inches x 3 inches and "tied"
together by ¼ inch mild steel plating, an aperture being left 2 feet 6
inches square to load directly into the tub. As this is our main winning-out
face we are completing the roadways as a finished job. The mothergate is being
completed as a main haulage road 10 feet x 7 feet, arched steel girders being
set right to the face. Left and right companion gates are the main returns, 6
feet x 6 feet arched steel girders being set. All girders are set on 8-inch
sole-trees which are resting on twelve inches of "gummings." The
distances between the left and right side returns are twenty and thirty yards
respectively from the mothergate ; the left side is "stowed" solid
and the right side has ten yards of stowing to the mothergate side and ten
yards from the mothergate, leaving ten yards of goaf between packs. This system
of packing prevents undue crush being put on the arched girders, and girders
which have been in for over nine months still show no signs of deformity.
The whole conveyor is periodically moved forward each night, arrangements being
made with the pullers to move forward the chocks and draw all back timber.
The "hoist" which is forward with each pull, is dealt with by the
stonemen who fire this gate, a price being suitably arranged for this extra
work. The "hoist-gate" is only supported by props and bars, and the
same supports are employed in the tailgate as these gates are only maintained
for ventilation purposes.
Steel straps are used for face supports, and the roof on this face gives us
very little trouble indeed.
The face is being worked "on the face" or "bordways," and
whilst the coal is fairly friable the three inches of dull coal is very tough
and woody, and it is in this coal that the under-cut is made.
The idea of employing the "Scraper" conveyor was to develop our
winning out face as quickly as possible, winning out other conveyor faces of
300 yards in length to work as double units.
There may be some conditions where some other system of working could be more
profitably employed, but given a fair reasonable "try-out" the
"Scraper" conveyor can prove a very efficient servant.
 |
 |
|