19th April 1941, Page: 326, Column: 1
Metal Mine Development
Occasional extracts from U.S. Bureau of Mines Bulletin 419, a document of 500
pp. with 156 illustrations. Issued through the Superintendent of Documents,
Washington, 60 cents net.
By Chas. F. Jackson and J. H. Hedges.
The term "mine development" is employed to designate the operations
involved in preparing a mine for ore extraction. These operations include
tunnelling, sinking, crosscutting, drifting, and raising.
In most mines, both exploration and development continue after ore extraction
by stoping has begun and often nearly to the end of the life of the mine.
Although exploration and development operations are similar, the emphasis is
placed on ore finding in the former, whereas in the latter operations are
directed mainly toward preparation for economical extraction and removal of the
ore from the mine.
Factors to be Considered.
Among the important factors to be considered in planning mine development for
economical operation are the following :—
1. Location of the main extraction opening.
2. Shaft vs. adit or tunnel development and inclined vs. vertical shafts.
3. Time required to prepare for production and anticipated maximum rate of
production.
4. Level interval.
5. Level-development plans and their adaptation to the physical characteristics
of the deposits and to the stoping method to be employed.
6. Life expectancy of the mine, total tonnage to be mined, and comparative
costs of different development schemes.
The main opening is usually a permanent one that will be utilised throughout
the life of the mine. It should, therefore, be so situated relative to the ore
bodies that it will not be disturbed by ground movement caused by ore
extraction and with a view to low maintenance cost.
The best position for the main opening should be determined from a
consideration of the topography, the position of the mill site or point of
loading ore for shipment, the feasibility of constructing a surface plant
consisting of hoist house, shops, change house, and other buildings near the
opening, the "centre of gravity" of the known ore, both in plan and
vertically, the position of the deepest ore, and the position and adequacy of
existing openings.
With shaft development, it is almost universally the practice to sink, develop,
and start sloping in stages of one or a few levels at a time as new ore faces
are required to maintain production and as ore continuity at greater depth is
proved or indicated.
With adit development, a similar plan may be followed by driving a number of
successively longer adits at successively lower elevations. When those can be
driven on the vein instead of across the strike, development by this method has
obvious advantages. When they must be driven in waste, the time involved in
reaching the ore, the cost of so much dead work, and the uncertainties
regarding persistence of the ore bodies at horizons corresponding to the
elevations of the adits may minimise or eliminate entirely the advantages of
adit development.
Shaft Operations.
As far as shaft operations per se are concerned, vertical shafts usually are
preferred to inclined shafts. Inclined shafts must be longer to reach the same
depth, hoisting speed is ordinarily slower, wear on hoisting ropes is greater,
and there are usually rope idlers to install and keep in repair. In bad ground,
vertical shafts usually are easier to maintain.
The size (cross-sectional dimensions) of a shaft or main haulage adit will be
governed to a large extent by the anticipated rate of production. Minimum size
limits are established by practical considerations even for very small
production rates.
Since the main operating shaft is often the main intake airway it should be of
cross-sectional area great enough to pass at moderate velocities the amount of
air required to ventilate the workings adequately. This is especially important
in hot, deep mines. Sometimes auxiliary shafts are provided for intake or
exhaust airways.
Shafts — Size and Capacity.
The first consideration in determining the size of a shaft is the duty to be
required of it. This includes the hoisting of ore and waste and the hoisting
and lowering of miners, timber, rails, explosives, drill steel and drilling
equipment, and other materials and supplies. If the ore hoist also handles men
and materials, the time available for hoisting ore obviously is reduced. The
time required for these other duties depends on a number of factors. Thus, some
mines use large amounts of timber for ground support, whereas others require
very little ; some use proportionately much greater quantities of drill steel
than others ; some shafts have to handle large quantities of waste for stope
filling while others have little or no waste to handle. In some mines,
especially those operating on a large number of levels, service demands for
transferring bosses from one level to another and handling equipment consume a
large amount of time. In such instances it is usually economical to make the
shaft large enough to accommodate a separate man and service cage, unless the
production is so small that a single hoist can handle it easily and perform
service duties as well. Where large amounts of mine timber must be handled
through the shaft, it may be desirable to provide a separate long cage upon
which loaded timber trucks can be run with the timbers lying flat. The long
cage is convenient, also, for handling drill-steel trucks with the steel lying
flat.
The capacity of a shaft of a given size is usually greater when skips are
employed for ore and waste than when cages are used ; the net load and the
ratio of net load to total load is greater, and less time usually is required
for loading and dumping. Even when the ore hoist is not used for service work,
it is seldom that hoisting can be conducted full time, especially if pockets of
considerable capacity are not provided at each hoisting level. The provision of
storage pockets of ample capacity, with measuring hoppers for loading the
skips, materially promotes maximum utilisation of time and shortens the
hoisting cycle, hence increases the capacity of the shaft.
Hoisting in cars on cages has advantages under certain limited conditions,
notably in leasing operations where the production from each of a number of
sets of leasers must be kept separate from that of the others.
Equipment.
The usual equipment for sinking at metal mines may be grouped roughly under
eight classifications — drilling, blasting, mucking, hoisting, pumping,
ventilation, power plant, and miscellaneous equipment, not including general
shops and necessary building structures.
Drilling equipment comprises air compressors, rock drills and accessories such
as hose and fittings, drill steel and steel-sharpening or grinding equipment,
air and water pipes, and manifolds or headers. Rock drills for shaft work
usually are of the hand-hold or "plugger" type weighing 35 to 80
pounds, although heavier machines mounted on cross bars sometimes are employed
for drilling very hard ground in long narrow shafts. Modern practice calls for
hollow drill steel and wet drilling, using conventional types of forged bits or
detachable bits.
In the larger shafts, whore several drills are operated at a time, air hose,
line-oilers, and water-hose connections to the drills usually are attached to a
manifold or header. In the largest shafts there may be separate air and water
headers. The header is connected to the air and drilling-water pipes in the
shaft by heavy hose. It is usually raised and lowered quickly after and before
drilling operations by a tugger hoist mounted on the shaft timbers 30 to 50
feet or more above the bottom of the shaft, or by chain blocks, or it may be
hoisted to the surface when not in use. Those headers may be made up of pipes
and fittings, or of pipes, fittings, and special castings assembled in a
variety of ways. Some headers are also provided with hooks on which to hang the
rock drills.
Although fuse and caps are still employed for blasting in small shafts, modern
practice requires electric blasting for greater safety, for reducing the number
of miss-fires, and for more precise timing of the order in which the holes will
go. Electric blasting necessitates the use of either blasting machines or
switches and wiring for connection to a power circuit. With blasting machines
the leg wires of the detonators are connected in series, and with power-circuit
firing they are connected in parallel.
Under miscellaneous equipment may be listed that required for framing shaft
timber, for pouring concrete linings (concrete mixer, steel or wooden forms,
and pipe, hose, or buckets for lowering concrete), and equipment for special
shaft-sinking jobs. The latter category includes equipment for sinking through
quicksand by the shield method or by the caisson method under air pressure,
equipment for sealing off heavy flows of water in fractured rock by the
cementation process, and that required for employing the freezing process.
Contracting companies making a speciality of the caisson method or the freezing
process are usually employed for such work.
The shield method has been used for sinking short distances through wet sand.
The shoe with trailing plates extending upward and overlapping the last regular
shaft set is jacked ahead and the sand is excavated inside. This shoe extends
around the shaft on all four sides, the members being rigidly bolted together.
In the cementation process, quick-setting cement or cement and sand are forced
by means of a plunger pump through pipes inserted in holes drilled outward from
the shaft into the fractured ground.
Occasionally a stiff-leg derrick with hoist and clamshell or orange-peel bucket
has been used for sinking through overburden to bedrock.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Hedges, J. H. | | U.S. Bureau of Mines | |
| Jackson, Chas. F. | | U.S. Bureau of Mines | |