Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

22nd March 1941, Page: 293, Column: 2

The Cockshead Seam

A Report by the Safety in Mines Research Committee of the North Staffordshire Institute of Mining Engineers, on "The Cockshead Seam — Part 1, General Working Practice," was submitted by Mr. E. Steele at the March meeting of the Institute. Extracts from the Report, the data for which have been collected from twelve fully-mechanised faces with an aggregate length of 1,340 yards, are appended.

The Cockshead seam, known in the western area of the coalfield as the Eight-Feet Banbury, occurs near the base of the Middle Coal Measures Series. The geological structure of the area has given the seam a long line of regular outcrop on the eastern flank of the syncline, which forms the dominant feature of the coalfield.

The seam varies in thickness from 7 feet 3 inches to 9 feet over the whole area under review, and generally has good partings at the roof and floor. Main slips occur in the same general direction at intervals varying from 9 inches to 4 feet 6 inches. The hade of these slips is generally to the dip of the seam, and at about 60° to the horizontal. The seam is notable for the large amount of firedamp produced in working. The forward weight on the coal is considerable and inevitably contributes to the liberation of firedamp. In the cases falling within the scope of the Report, the amount of firedamp given off varies between 500 cubic feet and 2,000 cubic feet per ton of output.

The Cockshead seam produces large quantities of dust. No doubt this excessive dust production is associated with the thickness and dry character of the seam. The amount of crushing that takes place in the coal ahead of the face is also an important factor in dust production. Considerable variations occur in the nature of the immediate roof of the seam, which alternate between thickly bedded strong light grey shale and more thinly bedded and broken dark grey shale. The changes are gradual and occur in belts running roughly east and west some 2½ miles wide. The floor of the seam is a bed of fairly strong fireclay, which is generally about 5 feet thick, and lifts in varying degree and pattern according to the roof conditions and the system of roof support.

All the faces in the Cockshead seam are arranged to advance along the line of strike. In most cases the faces are laid out at right angles or nearly so to the main level. Of the twelve faces covered by the report, three advance on a 24-hour cycle. In these cases 2 to 3 feet of top coal is left, and the consequent reduction in the height of the working facilitates the packing operation. Of the remaining nine faces, eight work on a 48-hour cycle, three of which work the whole of the seam at the face. The time needed for the building of essential packs influences the rate of advance and the cycle of operations. In some cases firedamp production is also a factor which affects the duration of the cycle.

The average height reduction on faces with a 24-hour cycle is greater than that when working on a 48-hour cycle, and having regard to the preference of the latter it would appear that most conditions tend to favour its adoption.

With one exception some system of strip packing is adopted. In many cases chocks are erected along the deep side of every pack. In others chocks are only built in the pack along the sides of the gates. The percentage of goaf packed varies between 100 and 35, the lower percentage being on the shorter and steeper faces. The average percentage is just under 53. For face support steel is used to a large extent. For all faces the height reduction averages 6.7 inches opposite packs and 6.8 inches opposite wastes. The height reduction is determined by measurements on a line at right angles to the face, and is the difference between the height measurement at the face end at a point 10 feet back.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Steele, E.      



Related Articles

Pub.
Date
Article (Newspaper)
22 Mar 1941  The Cockshead Seam (The Science and Art of Mining)
05 Apr 1941  Roadway Support And Linings (The Science and Art of Mining)

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print